You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, June 8th 2010, 11:09am

Chinese Naval Developments – Q1/1939:

A. Industiral Allocation

Stockpile after Q4/1938: 76tons

11/11 factories (non-fixed) to naval materials: 11000 tons created for Q1/1939

used at Tianjin: 2736tons
used at Shanghai: 557tons
used at Zhanjiang: 857tons
used at Kao-hsiung: 357tons
used at Taipei: 1985tons
used at Dairen: 357tons

used for small vessels: 0tons

used for Transaction: 3660tons
received from others: 0tons

warmaterial recycling: 0tons (first quarter)
warmaterial recycling: 0tons (second quarter)


=> 11000tons (manufactured) + 76tons (stockpiled) + 0tons (recycled) - 3660tons (transaction) + 0tons (received) = 7416tons


Stockpile after Q1/1939: 567tons


B. Infrastructure Development

C. Naval Construction

Bohai Shipbuilding at Tianjin:
Type 2 slip not in use
Type 1 slip Maoke-Class DD; reserved name: HICMS Meizhouhu ; 1428tons needed; 357tons received
Type 1 slip Maoke-Class DD; reserved name: HICMS Liáng ; 1428tons needed; 357tons received
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock HICMS Huangshi 402; 1047tons needed; 147tons received
Type 0 drydock HICMS Shanghai 139; 98tons needed; 98tons received; finished
Type 0 drydock HICMS Shanghai 140; 98tons needed; 98tons received; finished


Freefloating / in completation:
HICMS Song; 4479tons needed; 1679tons received


Kiangnan Dock & Engineering Works at Shanghai:
Type 2 slip not in use
Type 1 slip Maoke-Class DD; reserved name: HICMS Míngrén ; 1428tons needed; 357tons received
Type 0 slip not in use
Type 0 slip not in use
Type 3 drydock Rebuilt Horie => 1883tons needed; 200tons received
Type 2 drydock not in use


Freefloating / in completation:


Hudong-Zhonghua Shipbuilding at Zhanjiang:
Type 1 slip Maoke-Class DD; reserved name: HICMS Heibào ; 1428tons needed; 357tons received
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock Chukou - Class; reserved name: HICMS Chukou; 4059tons needed; 500tons received

Freefloating / in completation:


Waigaoqiao Shipbuilding at Kaoshiun:
Type 0 drydock: not in use
Type 0 drydock: not in use
Type 1 drydock: Maoke-Class DD; reserved name: HICMS Láohù ; 1428tons needed; 357tons received

Freefloating / in completation:


Quindao Beihai Shipbuilding at Taipei:
Type 0 slip Liaocheng - Class (ABT-01); 853tons needed; 215tons received
Type 0 slip not in use
Type 0 slip not in use
Type 0 drydock: not in use
Type 2 drydock: not in use
Type 3 drydock: Rebuilt Iwao => 1883tons needed; 200tons received

Freefloating / in completation:
HICMS Pirooz II.; 7625tons needed; 1570tons received

Zjiangjin Shipbuilding at Dairen:
Type 0 drydock: Liaocheng - Class (ABT-02); 853tons needed; 210tons received
Type 1 drydock: HICMS Huangshi 403; 1047tons needed; 147tons received
Type 2 drydock: not in use


Freefloating / in completation:



D. Transactions
Export:
1500 tons to Philipinnes for building Scout Cruiser HICMS Jianghu

1910 tons to Chile for building of three Type-A Export Fleet Tugs and five Alacalufes-class yard tugs

250 tons to Peru for building Light Ship (first payment)

Import:


Conversion:


E. Other Notes
stored:
4x 150mm guns
12x 120mm guns


F. Small vessels
Small vessels built under the "small vessels - rule":


Small vessels built in drydocks:
E-Boat of the Shanghai II - Class: 98tons
HICMS Shanghai 139
HICMS Shanghai 140



G. Shakedown cruises
small trials = 3 month:



great trials (ships over 500tons) = 6 month:
HICMS Yiangtan finished trials
HICMS Jin-Class J-1 finished trials
HICMS Jin-Class J-2 finished trials
HICMS Jin-Class J-3 finished trials
HICMS Jin-Class J-4 finished trials
HICMS Migong in trials
HICMS Maoming in trials





######################
hope there is no fault in my report
######################

OOB will be updated asap