German Naval Developments – Q1/27
A. Industrial Allocation
Factory Allocation:
Warship Material: 3
Infrastructure (Committed): 21 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 0
Warship Material Produced: 3,000 t
Stockpile: 1,410 t
Recycled Scrap: 120 t
Material Used on Construction: 3320 t
New Stockpile: 1,090 t
B. Infrastructure Development
The Type 3 drydock at Kiel receives .1 pts, for 2.2 total.
Factory 25 receives 1 point, for 1 total.
Factory 26 receives 1 point, for 1 total.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Scrapping Medusa
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: DD Z-213 receives 426 t.
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Scrapping G-142
1 Type 0 slip: Idle
Free-floating: DD Z-212 receives 214 t, completed 15/2/27
At Cuxhaven
1 Type 3 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: CL Ersatz Nymphe receives 1400 t
At Kiel
1 Type 3 slipway: CL Ersatz Thetis receives 1400 t, launched 8/2/27
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
D. Transactions
DD G-142 scrapped at Bremerhaven, 120 t to be available for Q4/27
E. Other Notes
DD Z-210 complete shake-down cruise
CL Breslau, DD Z-211 continue shake-down cruise
Z-212 commences shake-down cruise
New Orders: None
F. Updated Order of Battle, 31/3/27
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 10(0)+2, with Medusa deleted, to be scrapped Q2/27.
DD: 24(0)+3, with G-142 deleted, to be scrapped Q2/27.
SL: 6(0)+0
AM: 10(0)+0
Note: PD = pre-dreadnought