A. Industrial Allocation
16/29 factories to naval materials: 16,258 metric tons (16,000 tons) created for Q1/1923, added to 0 metric tons of saved materials makes a total of 16,258 metric tons available.
13/29 factories (committed) to infrastructure development: 1.3 points for Q1/1923 plus 0 bonus points makes a total of 1.3 infrastructure points.
0/29 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced.
B. Infrastructure Development
1 new factory with 6.5 points completed in Q4/22
0.7 points added to new factory.
0.6 points added to new Class 2 drydock at Murmansk.
1 new factory with 7.2 points completed in Q1/1923.
1 new Class 2 drydock at Tallinn with 0.6 points completed in Q1/1923.
C. Naval Construction
At Petrograd
Class 4 Slip #1 – Arctica class icebreaker. 5,291 metric tons added by 1/1/23. 1,364 metric tons added in Q1/1923. Launched 3 January 1923.
Class 4 Slip #2 – Arctica class icebreaker. 5,291 metric tons added by 1/1/23. 1,364 metric tons added in Q1/1923. Launched 4 January 1923.
Class 4 Slip #3 – Arctica class icebreaker. 5,291 metric tons added by 1/1/23. 1,364 metric tons added in Q1/1923. Launched 6 January 1923.
Class 4 Slip #4 – Arctica class icebreaker. 5,291 metric tons added by 1/1/23. 1,364 metric tons added in Q1/1923. Launched 8 January 1923.
Class 3 Slip #1 – General Admiral Apraxin class Light cruiser. 4,000 metric tons added by 1/1/23. 867 metric tons added in Q1/1923. Launched 9 December 1922.
Class 3 Slip #2 – General Admiral Apraxin class Light cruiser. 4,000 metric tons added by 1/1/23. 867 metric tons added in Q1/1923. Launched 11 December 1922.
Class 3 Slip #3 – General Admiral Apraxin class Light cruiser. 4,000 metric tons added by 1/1/23. 867 metric tons added in Q1/1923. Launched 12 December 1922.
Class 3 Slip #4 – General Admiral Apraxin class Light cruiser. 4,000 metric tons added by 1/1/23. 867 metric tons added in Q1/1923. Launched 14 December 1922.
Class 2 Slip #1 – Oka class Fast Minelayer laid down 12 January 1923. 266 tons added in Q1/23.
Class 2 Slip #2 – Oka class Fast Minelayer laid down 12 January 1923. 266 tons added in Q1/23.
Class 1 Slip #1 – Oka class Fast Minelayer laid down 12 January 1923. 266 tons added in Q1/23.
Class 1 Slip #2 – Oka class Fast Minelayer laid down 12 January 1923. 265 tons added in Q1/23.
Class 1 Slip #3 – Oka class Fast Minelayer laid down 12 January 1923. 265 tons added in Q1/23.
Class 1 Slip #4 – Idle
Class 0 Slip #1 – Idle
Class 0 Slip #2 – Idle
Class 0 Slip #3 – Idle
Class 0 Slip #4 – Idle
At Arkhangelsk
Class 4 Slip #1 – Idle
Class 2 Slip #1 – Idle
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Roza class Corvette laid down 3 January 1923. 294 tons added in Q1/23.
Class 0 Slip #1 – Roza class Corvette laid down 3 January 1923. 294 tons added in Q1/23.
Class 0 Slip #2 – Roza class Corvette laid down 3 January 1923. 294 tons added in Q1/23.
Class 0 Slip #3 – Roza class Corvette laid down 3 January 1923. 294 tons added in Q1/23.
Class 0 Slip #4 – Roza class Corvette laid down 3 January 1923. 294 tons added in Q1/23.
At Rostov
Class 3 Slip #1 – Scout Aircraft Carrier Strashniy laid down 2 January 1923. 2,500 tons added in Q1/23.
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Idle
Class 0 Slip #1 – Idle
Class 0 Slip #2 – Idle
At Vladivostok
Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Conversion of the predreadnought battleship Tsesarevich into the floating crane Trud. 6,151 metric tons added by 1/1/23. 628 metric tons added in Q1/23 to complete. Completed 2 February 1923.
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Idle
Class 0 Drydock #1 – Idle
Class 0 Slip #1 – Idle
Class 0 Slip #2 – Idle
At Tallin
Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle
At Sevastopol
Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle
At Murmansk
Class 4 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle
At Cam Ranh Bay (Indochina (France))
Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle
At Astrakhan
Class 0 Drydock #1 – Idle
At Petropavlovsk-Kamchatky
Class 1 Drydock #1 – Idle
Launched ships being completed:
Sviatoslav class heavy cruisers
Kniaz Sviatoslav – 12,046 metric tons completed by 1/1/23. 352 metric tons added in Q1/1923 to complete. Completed 21 March 1923.
Kniaz Sviatopolk – 12,046 metric tons completed by 1/1/23. 352 metric tons added in Q1/1923 to complete. Completed 23 March 1923.
Andrei Oslyaba – 12,046 metric tons completed by 1/1/23. 352 metric tons added in Q1/1923 to complete. Completed 24 March 1923.
Aleksandr Peresvet – 12,046 metric tons completed by 1/1/23. 352 metric tons added in Q1/1923 to complete. Completed 27 March 1923.
D. Transactions
None.
E. Other Notes
none.
F. Updated Order of Battle, 3/31/23
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 10(0)+0
BC: 4(0)+0
CV: 1(0)+1
CA: 7(0)+0
CL: 23(0)+0
Monitors: 0(0)+0
DD: 110(0)+0
Sloops: 0(0)+0
Fleet Submarine: 30(0)+0
Coastal Submarine: 100(0)+0