Danish Naval Developments Q4 1925
a/ Industrial Allocation
1/10 factories producing materiel for shipbuilding =1000 tons
4/10 factories (fixed) producing infrastructure materiel =0.4 points +0.4 bonus points
5/10 factories producing infrastructure materiel = 0.5 points
b/ Infrastructure Development
Factory no. 11 continuing construction, receives 1.3 points = Total 3.9 points
c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Freya, CA, laid down 02/01/24, receives 529 tons to complete
No.2 type 2 slip – Idle
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.1 type 2 drydock - Idle
Dock side –
Aarhus-
No.1 type 3 slip –Idle
No.2 type 2 slip –Idle
No.3 type 1 slip –Idle
No.4 type 1 slip –Idle
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
Dock side –Jutland
Aalborg-
No.1 type 1 slip – Idle
No.2 type 1 slip – Idle
No.3 type 0 slip - Idle
No.4 type 0 slip - Idle
Dock side –
Bangkok-
No.1 type 1 slip – Idle
No.2 type 0 slip – Idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side –
d/ Transactions
None
e/ Other Notes
All new orders CANCELLED, current projects allowed to complete.
KDM Freya commences sea trials on 20/10/25
KDM Lolland continues sea trials until 28/01/26
KDM UD-1 commissions 02/10/25
KDM UD-2 commissions 02/10/25
Re-Builds to the following ships:-
Jutland – 830 tons, completes conversion to CV(X), commences sea trials 24/11/25
Tonnage Carried Over From This Quarter = 543
f/ Order of Battle
Note:
Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 01 (0) + 0/0 (0)
PD = 00 (0) + 0/0 (0)
AC = 02 (0) + 0/0 (0)
CDS = 03 (0) + 0/0 (0)
CA = 01 (0) + 1/0 (0)
CL = 08 (1) + 1/0 (0)
CV(X) = 00 (1) + 0/0 (0)
DD = 17 (1) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
SL = 03 (0) + 0/0 (0)
GB = 03 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 13 (0) + 0/0 (0)
MWS = 07 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: PD = Pre-Dreadnought
FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)