You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, December 26th 2012, 10:27pm

Chile, Q2/1943



[SIZE=3]Industrial Allocation[/SIZE]
- 9/9 factories producing 9,000t materials.
- 4,733 tons from stockpile.
- 0 tons from transactions
- 1,014 tons from scrapping
- 14,747 tons materials total.
- 10,301 tons used.
- 4,446 tons stored for Q3/43.
- 0/9 factories dedicated to infrastructure.

[SIZE=3]Infrastructure Development[/SIZE]
None at present

[SIZE=3]Naval Construction[/SIZE]
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: Battleship Almirante Cochrane scrapping. 4055 / 4055 tons recovered Q2/1943. Scrapping completed.
S3.5: CA-04 Almirante Latorre laid down April 1st, 1943. 2400 tons added Q2/43 for a total of 2400 / 14,525 tons. 12,125 / 15,525 tons remaining. Ship launched on August 3rd 1943. Ship will complete on February 6th, 1944.
D2.5: CL-06 Atacama begins partial reconstruction. 4,598 tons required. 1500 tons added Q2/43 for a total of 1500 / 4598. 3098 / 4598 tons remaining until completion.
D2: DD-23 Capitan Lira undergoing partial reconstruction. 342 tons added Q2/1943 for a total of 342/342 tons. 0/342 tons remaining until completion. Reconstruction completed.
S2: DDE-26 Téllez laid down April 1st, 1943. 325 tons added Q2/43 for a total of 325 / 1,195 tons. 870 / 1195 tons remaining. Ship launched on August 3rd 1943. Ship will complete on February 6th, 1944.
S1: DDE-25 Bolados laid down January 1st, 1943. 325 tons added Q2/43 for a total of 650 / 1,195 tons. 545 / 1195 tons remaining. Ship launched on May 3rd 1943. Ship will complete on November 6th, 1943.
D0: LSM-02 Orompello laid down January 1st, 1943. 150 tons added Q2/43 for a total of 300 / 487 tons. 187 / 487 tons remaining. Ship launched Q2 1943. Ship will complete in Q4 1943.

Dockside:
- BC-11 Almirante Cochrane laid down August 1st, 1941. 2,300 tons added Q2/43 for a total of 17,700 / 28,385 tons. 10,685 / 28,385 tons remaining until completion on April 3rd, 1944. Ship originally named O'Higgins. Ship launched December 30th, 1942.
- CLD-21 Chipana (Battle-class destroyer leader) laid down April 1st, 1942. 0 tons added Q2/43 for a total of 3,575 / 3,575 tons. 0 / 3,575 tons remaining. Ship launched on September 1st 1942. Ship completed on April 18th, 1943.
- CLD-22 Talcahuano (Battle-class destroyer leader) laid down July 1st, 1942. 875 tons added Q2/43 for a total of 3,575 / 3,575 tons. 0 / 3,575 tons remaining. Ship launched on December 1st 1942. Ship will complete on July 18th, 1943.
- CLD-23 Abtao (Battle-class destroyer leader) laid down October 1st, 1942. 900 tons added Q2/43 for a total of 2,700 / 3,575 tons. 875 / 3,575 tons remaining. Ship launched on March 1st 1943. Ship will complete on October 18th, 1943.
- DL-08 Capitan Guzman undergoing major refit. 110 tons added Q2/1943 for a total of 110 / 110 tons. 0/110 tons remaining until completion. Reconstruction completed.

ASMAR - Astillero de Valparaíso (Valparaiso):
S1: Sea Gunboat Aludra laid down April 1st, 1943. 180 tons added Q2/1943 for a total of 180 / 180. Completed and launched on April 30th, 1943.
S1: Sea Gunboat Adhara laid down April 1st, 1943. 180 tons added Q2/1943 for a total of 180 / 180. Completed and launched on April 30th, 1943.
D1: DD-53 Llameante undergoing partial reconstruction. 344 tons added Q2/1943 for a total of 344/344 tons. 0/344 tons remaining until completion. Reconstruction completed.

Dockside:
None

ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Light minesweeper YDM-6 laid down April 1st, 1943. 190 tons added Q2/1943 for a total of 190 / 190. Completed and launched on April 30th, 1943.
S0: Sea Gunboat Algol laid down April 1st, 1943. 180 tons added Q2/1943 for a total of 180 / 180. Completed and launched on April 30th, 1943.

Dockside:
- N/A

ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle

Dockside:
None

from factories:
- N/A

On Trials
- BC-09 Almirante Blanco Encalada continues six months of builders trials.
- CLD-19 Casma completes six months of builders trials.
- CLD-20 Papudo continues six months of builders trials.
- CLD-21 Chipana begins six months of builders trials.
- LSM-01 Elicura completes six months of builders trials.

Scrapping
- Total tonnage in recycling until Q2/1943: (1x1014) = 1014 tons
- Total tonnage in recycling until Q3/1943: (1x1014) = 1014 tons
- Total tonnage in recycling until Q4/1943: (1x1014) = 1014 tons
- Total tonnage in recycling until Q1/1944: (1x1013) = 1013 tons

[SIZE=3]Transactions[/SIZE]
None

[SIZE=3]Other Notes[/SIZE]
Technology development and investigatory committees are working on the following projects:
- "Zorro": Target date not set. Project is in study stages at Sisdef.
- "Coati": Target date of mid-1944 set. Project is in initial study stages at Sisdef.
- "Pudu": Project is in production at Sisdef and FAMAE.
- Design N1.

[SIZE=3]Order of Battle (Armada de Chile) June 30th, 1943[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Primary Combatants:
Dreadnought Battleships: 1(0)+0
Dreadnought Battlecruisers: 2(0)+1
Aircraft Carriers: 3(0)+0
Armoured Cruisers: 1(0)+0
Heavy Cruiser: 1(0)+1
Light Cruisers: 7(1)+0
Helicopter Cruisers: 1(0)+0
Destroyer Leaders: 6(0)+2 {3,000 tons std and up}
Destroyers: 34(0)+0 {1,200-3,000 tons std}
Destroyer Escorts: 16(0)+1
Light Destroyers (Corvettes): 8(0)+0
Minelayer: 1(0)+0
Torpedo Boats: 19(0)+0
Submarines: 10(0)+0
Floatplane Carriers: 0(0)+0
Subchasers: 24(0)+0
Minesweepers: 22(0)+0
Arctic Patrol Vessel: 3(0)+0

Fleet Train:
Destroyer Tenders: 4(0)+0
Subchaser Tenders: 2(0)+0
Submarine Tenders: 1(0)+0
General Fleet Tenders: 4(0)+0
Fleet Oilers: 12(0)+0
Colliers: 1(0)+0

Auxiliaries:
Sail Training Sloop: 2(0)+0
Transports: 2(0)+0
Fleet Tugs: 4(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 2(0)+0
Oceanic Research Ship: 1(0)+0
Pilot Boats: 6(0)+0
Training Yawls: 6(0)+0

Amphibious Forces:
Landing Ship Vehicle: 1(0)+0
Beach Discharge Lighter: 1(0)+0
Attack Transports: 4(0)+0
Landing Ship Infantry (Med): 2(0)+0
Landing Ship Tank: 2(0)+0
Landing Ship Mechanized: 1(0)+1
Landing Craft Tank: 0(0)+0
Landing Craft Mechanized: 11(0)+0
Landing Craft Assault: 54(0)+0

Emergency Use:
Patrol Boats: 4(0)+0
Naval Trawlers: 16(0)+0
Transports: 2(0)+0
Museum Ships: 1(0)+0

Foreign Orders and Exports (Totals):
Fleet Tugs: 6(0)+0 (to China)
Light Harbour Tugs: 20(0)+0 (to China)