A. Industrial Allocation
8/22 factories to naval materials: 8,128 metric tons (8,000 tons) created for Q4/1922. 1,425 tons saved from Q3/22, making 9,553 metric tons total
14/22 factories (committed) to infrastructure development: 1.4 points for Q4/1922 plus 1.4 bonus infrastructure points
0/22 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced
B. Infrastructure Development
1 new factory with 8.0 points completed by Q3/1922
1 new factory with 1.3 point completed by Q3/1922
2.8 infrastructure points created for Q4/1922
2 points added to first new factory in Q4/1922 to complete.
0.8 points added to second new factory in Q4/1922, ending with 2.1 points completed.
C. Naval Construction
At La Rochelle
Class 4 Slip #1 - Audaciaux class destroyer #13 894 metric tons complete by 10/1/22. Launched 7/12/22. 296 metric tons added in Q4/22 to complete.
Class 4 Slip #2 - Audaciaux class destroyer #14 894 metric tons complete by 10/1/22. Launched 7/13/22. 296 metric tons added in Q4/22 to complete.
Class 3 Slip #1 - Audaciaux class destroyer #15 894 metric tons complete by 10/1/22. Launched 7/11/22. 296 metric tons added in Q4/22 to complete.
Class 3 Slip #2 -Audaciaux class destroyer #16 894 metric tons complete by 10/1/22. Launched 7/12/22. 296 metric tons added in Q4/22 to complete.
Class 3 Slip #3 - Audaciaux class destroyer #17 894 metric tons complete by 10/1/22. Launched 7/13/22. 296 metric tons added in Q4/22 to complete.
Class 3 Slip #4 - Audaciaux class destroyer #18 894 metric tons complete by 10/1/22. Launched 7/12/22. 296 metric tons added in Q4/22 to complete.
Class 2 Slip #1 - Noumea class minesweeper #6 laid down 5/11/22. 360 metric tons added added by Q4/22. 123 tons added in Q4/22 to complete.
Class 2 Slip #2 - Noumea class minesweeper #7 laid down 5/14/22. 360 metric tons added added by Q4/22. 123 tons added in Q4/22 to complete.
Class 1 Slip #1 - Noumea class minesweeper #8 laid down 5/15/22. 360 metric tons added added by Q4/22. 123 tons added in Q4/22 to complete.
Class 1 Slip #2 - Noumea class minesweeper #9 laid down 5/17/22. 360 metric tons added added by Q4/22. 123 tons added in Q4/22 to complete.
Class 1 Slip #3 - Noumea class minesweeper #10 laid down 5/19/22. 360 metric tons added added by Q4/22. 123 tons added in Q4/22 to complete.
Class 1 Slip #4 - Seine class corvette #6 laid down 4/8/22. 385 tons added by Q4/22. 200 tons added in Q4/22 to complete.
Class 0 Slip #1 - Seine class corvette #7 laid down 4/8/22. 385 tons added by Q4/22. 200 tons added in Q4/22 to complete.
Class 0 Slip #2 - Seine class corvette #8 laid down 4/8/22. 385 tons added by Q4/22. 200 tons added in Q4/22 to complete.
Class 0 Slip #3 - Seine class corvette #9 laid down 4/8/22. 385 tons added by Q4/22. 200 tons added in Q4/22 to complete.
Class 0 Slip #4 - Seine class corvette #10 laid down 4/8/22. 385 tons added by Q4/22. 200 tons added in Q4/22 to complete.
At Brest
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
At Ceyenne
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Abidjan
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Marseilles
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
At Oran
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
At Beiruit
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Crozet Island
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Saigon
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Idle
At New Caledonia
Class 2 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Idle
Launched ships being completed:
All noted above
D. Transactions
None. 5,839 metric tons warship materials saved.
E. Other Notes
None
F. Updated Order of Battle, 6/30/22
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 6(0)+0
BC: 0(0)+0
CV:2(0)+0
CA: 6(0)+0
CL: 8(0)+0
Monitors: 0(0)+0
DD: 78(0)+0
Sloops: 0(0)+0
Fleet Submarine: 15(0)+0
Coastal Submarine: 60(0)+0