*subject to corrections*
A. Industrial Allocation
16/31 factories (non fixed) to naval materials: 16,000 tons created for Q3/1934 plus 865 tons stockpiled from Q2/34, plus 1,000 tons transfered from Mexico plus 1,115 tons transfered from Colombia
Total warship materials: 18,980 (2,115 tons from foreign sources)
18,228 tons used for ship building, 352 tons stockpiled for next quarter.
10/31 factory's (fixed) to infrastructure development: 1.0 points for Q3/1934
5/31 factory's (non-fixed) to infrastructure development: 0.5 IP's for Q3/1934
Total: 1.5 infrastructure points created for Q3/34
B. Infrastructure Development
0.3 points used for new Type 2 slip at Illisus
0.2 points used for new Type 2 slip at Eridanus
C. Naval Construction
At Cleito
Class 4 Slip #1 - CA- Daedalus building, 11,466 tons needed, 1,000 tons used, 1,000 tons added
Class 4 Slip #2 - Battleship Philomedes launched, 39,089 tons needed, 28,900 tons used, 2,000 tons added
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - MGB-42 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - MGB-43 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - MGB-44 laid down, 177 tons needed, 177 tons added
Class 0 Slip #4 - MGB-45 laid down, 177 tons needed, 177 tons added
2 MTB building (MTB-202 type)
MGB's 32 through 35 begin trials
At Eridanus
Class 4 Slip #1 - CA- Laomedon building, 11,466 tons needed, 1,000 tons used, 1,000 tons added
Class 4 Slip #2 - Battleship Eumelos launched, 39,089 tons needed, 28,900 tons used, 2,000 tons added
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - CLAA Danaus building 5,695 tons needed, 600 tons used, 0 tons added, building postponed, materials broken up on the slip, ship to be relaid(at Lycabettus)
Class 2 Slip #2 - begins construction, 2.0 IP's needed, 0.2 IP's added
Class 2 Drydock #1 - idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
2 MTB building (MTB-202 type)
At Duecalion
Class 3 Slip #1 - CL Acestus, building, 7,963 tons needed, 4,600 tons used, 1,000 tons added
Class 3 Slip #2 - CL Brencis building, 7,963 tons needed, 4,600 tons used, 1,000 tons added
Class 3 Drydock #1- Idle
Class 2 Slip #1 - CLAA Arcesius,building 5,695 tons needed, 600 tons used, 0 tons added, building cancelled, breaking up on slip
Class 2 Slip #2 - CLAA Zerberus laid down, 5,719 tons needed, 719 tons added
Class 2 Drydock #1 - Idle
Class 0 slip #1 - MGB-46 laid down, 177 tons needed, 177 tons added
Class 0 slip #2 - MGB-47 laid down, 177 tons needed, 177 tons added
Class 0 slip #3 - MGB-48 laid down, 177 tons needed, 177 tons added
Class 0 slip #4 - MGB-49 laid down, 177 tons needed, 177 tons added
MGB 36 through 39 begin trials
At Illissus
Class 3 Slip #1 - CA- Deiphobus building, 11,466 tons needed, 1,000 tons used, 1,000 tons added
Class 3 Slip #2 - CL Maturin building, 7,963 tons needed, 4,600 tons used, 1,000 tons added
Class 3 Drydock #1 - BBT Aggamemnon scrapping
Class 2 Slip #1 - CLAA Callosus building 5,695 tons needed, 600 tons used, 0 tons added, building postponed, materials broken up on the slip, ship to be relaid, 5,719 tons needed
Class 2 Slip #2 - begins construction, 2.0 IP's needed, 0.3 IP's added
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - MGB-50 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - MGB-51 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - Type 4 SC #1 laid down, 111 tons needed, 111 tons added
Class 0 Slip #4 - Type 4 SC #2 laid down, 111 tons needed, 111 tons added
Training carrier Nautica completed, begins trials
MGB 40 and MGB 41 begin trials
At Palinerus
Type 2 Drydock #1 - completed
Type 0 Drydock #1 - completed
Type 0 Drydock #2 - completed
Type 0 Drydock #3 - completed
The drydocks of this facility are to be enclosed in concrete structures so as to facilitate the construction, repair and maintinence of submarines. Complex has completed and excavation of waterway approaches has begun.
At Phelleus
Class 3 Slip #1 - CL Promethius building, 7,963 tons needed, 4,600 tons used, 1,000 tons added
Class 3 Slip #2 - CA- Aeneas building, 11,466 tons needed, 1,000 tons used, 1,000 tons added
Class 3 Drydock #1 - Idle
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Type 4 SC #3 laid down, 111 tons needed, 111 tons added
Class 0 Slip #2 - Type 4 SC #4 laid down, 111 tons needed, 111 tons added
Class 0 Slip #3 - Type 4 SC #5 laid down, 111 tons needed, 111 tons added
Class 0 Slip #4 - Type 4 SC #6 laid down, 111 tons needed, 111 tons added
At Lycabettus type 4 port (8/9)
Class 2 Slip #1 - CLAA Alcestus building 5,695 tons needed, 600 tons used, 0 tons added, building postponed, materials broken up on the slip, ship to be relaid, 5,719 tons needed
Class 2 Slip #2 - CLAA Danaus laid down, 5,719 tons needed, 719 tons added
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - Idle
Destroyers Junta, Jupiter, Jury and Justice completed, begin trials
At Maracaibo type 3 port (5/7)
Class 3 Drydock #1 - Idle
Class 1 Slip #1 - DD San Jacinto launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 1 Slip #2 - DD San Onofre launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - 2 type 2 motor launches building
Class 0 Slip #2 - 2 type 2 motor launches building
Class 0 Slip #3 - Type 4 SC #7 laid down, 111 tons needed, 111 tons added
Class 0 Slip #4 - Type 4 SC #8 laid down, 111 tons needed, 111 tons added
3 MTB building (MTB-202 type)
At Safi type 2 port (4/5)
Class 2 Drydock #1 - 3 MTB building (MTB-202 type)
Class 1 Slip #1 - 3 type 2 motor launches building
Class 1 Slip #2 - 3 type 2 motor launches building
Class 1 Drydock #1 - Idle
Class 0 Slip #1 - Type 4 SC #9 laid down, 111 tons needed, 111 tons added
Class 0 Slip #2 - Type 4 SC #10 laid down, 111 tons needed, 111 tons added
Class 0 Slip #3 - Type 4 SC #11 laid down, 111 tons needed, 111 tons added
Class 0 Slip #4 - Type 4 SC #12 laid down, 111 tons needed, 111 tons added
Launched ships/freefloating ships being completed:
None
Ships completed and on trials:
Training carrier Nautica on trials
DD's Joust, Jubilant, Judge and Juggernaut on trials
10xMGB type 1 begin trials
10xMGB complete trials
10xtype 4 Subchasers begin trials
Summary of ship building/repairs/rebuilds and convertions.
2 Eumelos class battleships building (4,000 tons)
4 Daedalus class CA's laid down (4,000 tons)
4 Acestus class CL's building (4,000 tons)
3 Danaus/Zerberus class CLAA's building suspended (0 tons)
1 Danaus/Zerberus class CLAA building suspended, breaking up on slip
1 Danaus/Zerberus class CLAA building (719 tons)
2 J class DD's building for Colombia (766 tons)
10 MGB-1 class Motor gunboats built (1,770 tons)
12 Type 4 Subchasers laid built for Colombia (1,332 tons)
10 motor launchs built (600 tons)
10 MTB-202 class Motor Torpedo Boats built (500 tons)
D. Transactions
0.3 IP's transfered to Byzantium
0.3 IP's transfered to Colombia
0.4 IP's transfered to Mexico
1,115 tons transfered from Colombia for 2 DD's
1000 tons transfered from Mexico for purchase of BB Poseidon
E. Other Notes
BBT Aggamemnon scrapping
Magnus class CLAA building suspended pending redesign
F. Miscellaneous Works
Developement: Port of Palinerus construction of a new Submarine building and repair base completed, excavation of approach waterways underway.
G. Updated Order of Battle, 10/1/33
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
Battleships:................................10(0)2
Battlecruisers:.............................2(0)0
CV:............................................3(0)0
Training battleship:......................0(0)0
Training CV's:..............................2(0)0
Training cruisers:.........................2(0)0
CA:............................................8(0)4
Escort Cruisers:..........................2(0)0
CL:.............................................38(0)8
DD: type A................................16(0)0
DD: type B................................128(0)8
Torpedo boats:...........................N/A
Moniters:...................................2(0)0
Fleet Submarine:.......................52(0)0
Coastal Submarine:...................82(0)0
Experimental submarine:..............1(0)0
Non-Treaty Limited Ships
DDE: (type C/ escorts).................70(0)0
Sloops:.......................................N/A
Frigates:.....................................8(0)0
Corvettes:...................................N/A
Torpedo gunboats:......................32(0)0
Gunboats:.................................12(0)0
Patrol vessels:...........................0(0)0
Mine sweepers:.........................24(0)0
Mine warfare vessels:.................16(0)0
Sub chasers:.............................300(0)0 *additional 10 transfered to Byzantean fleet, 12 to Colombia
Coastal Motor Torpedo Boats:.....80(0)0
Motor Gunboats:..........................40(0)10
Motor Torpedo Boats:................220(0)10
Motor Launchs:.........................180(0)10
Motor Launchs/minlayers:..........40(0)0
Floatplane carrier/tenders:..........2(0)0
Airship tenders:.........................2(0)0
Blimp carrier/tenders:................2(0)0
Destroyer depot ships:...............2(0)0
Submarine depot ships:.............4(0)0
Small craft depot ships:..............4(0)0
Repair ships:.............................2(0)0
Transports:...............................10(0)0
Landing Craft Infantry:................80(0)0
Landing Craft Mechanized..........20(0)0
landing Craft Tank.....................10(0)0
Infantry launches:......................20(0)0