You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, March 15th 2016, 11:22am

Atlantis 1942 quarterly reports

Catching up (more like digging myself out of a deep hole), hopefully no errors......

A. Industrial Allocation

31/31 factories (non fixed) to naval materials: 31,000 tons created for Q1/1942 plus 23,316 tons stockpiled from Q4/41, plus 1,000 tons transfered from foreign sources (1,000 tons from Byzantium)
Total warship materials: 55,316
45,165 tons used for ship building, 10,151 tons stockpiled for next quarter.
0/31 factory's (non-fixed) to infrastructure development: 0.0 points
0/31 factory's (fixed) to infrastructure development: 0.0 points

B. Infrastructure Development

None

C. Naval Construction

At Cleito

Class 4 Slip #1 - BB Cronus building 47,516 needed, 7,500 tons used, 2,500 tons added
Class 4 Slip #2 - BB Aggamemnon building 47,516 needed, 7,500 tons used, 2,500 tons added
Class 4 Drydock #1 - CL Ceracus begins refit, 3,756 tons needed, 1000 tons added
Class 4 Drydock #2 - CL Ithica begins refit, 3,756 tons needed, 1000 tons added
Class 1 Slip #1 - LST-4 laid down, 1,807 tons needed, 500 tons added
Class 1 Slip #2 - LST-5 laid down, 1,807 tons needed, 500 tons added
Class 1 Slip #3 - L class DD laid down, 1,688 tons needed, 500 tons added
Class 1 Slip #4 - L class DD laid down, 1,688 tons needed, 500 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Battleships Neptune and Oberoth completed, 47,516 needed (each), 47,516 tons used (each)

At Eridanus

Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - LSD Amuay Bay laid down, 12,455 tons needed, 1,955 tons added
Class 2 Slip #2 - LSD Playa Blanca laid down, 12,455 tons needed, 1,955 tons added
Class 2 Drydock #1 - 5 type 2 LCT's laid down, 274 tons needed (each) 100 tons added (each)
Class 1 Slip #1 - M class DD laid down, 1,585 tons needed, 400 tons added
Class 1 Slip #2 - M class DD laid down, 1,585 tons needed, 400 tons added
Class 1 Slip #3 - M class DD laid down, 1,585 tons needed, 400 tons added
Class 1 Slip #4 - M class DD laid down, 1,585 tons needed, 400 tons added

Battleships Leviathan and Orion completed, 47,516 needed (each), 47,516 tons used (each)


At Duecalion

Class 3 Slip #1 - CV Atlantes launched, 22,362 tons needed, 18,000 tons used, 2,000 tons added
Class 3 Slip #2 - CV Acastus launched, 22,362 tons needed, 18,000 tons used, 2,000 tons added
Class 3 Drydock #1 - Submarine XSS-3 minor refit, 51 tons needed , 51 tons added
Class 2 Slip #1 - LST-6 laid down, 1,807 tons needed, 500 tons added
Class 2 Slip #2 - LST-7 laid down, 1,807 tons needed, 500 tons added
Class 2 Drydock #1 - 5 type 2 LCT's laid down, 274 tons needed (each) 100 tons added (each)
Class 0 slip #1 - Idle
Class 0 slip #2 - Idle
Class 0 slip #3 - Idle
Class 0 slip #4 - Idle
CLAA's Acheron and Nausicaa, freefloating, 5,906 tons needed (each), 5,000 tons used (each), 906 tons added (each)


At Illissus

Class 3 Slip #1 - CV Aleron building, 22,362 tons needed, 10,000 tons used, 2,000 tons added
Class 3 Slip #2 - CV Aurora building, 22,362 tons needed, 10,000 tons used, 2,000 tons added
Class 3 Drydock #1 - DD's Falcon and Fox scrapping, completes Q2/41
Class 2 Slip #1 - LSD Playa de las Americas laid down, 12,455 tons needed, 1,955 tons added
Class 2 Slip #2 - LSD Playa Bonaire laid down, 12,455 tons needed, 1,955 tons added
Class 2 Drydock #1 - DD Fervent scrapping, completes Q2/41
Class 1 Slip #1 - M class DD laid down, 1,585 tons needed, 400 tons added
Class 1 Slip #2 - M class DD laid down, 1,585 tons needed, 400 tons added
Class 1 Slip #3 - M class DD laid down, 1,585 tons needed, 400 tons added
Class 1 Slip #4 - M class DD laid down, 1,585 tons needed, 400 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
CA Volcan Osorno begins refit, 4,788 tons needed, 1,200 tons added

CLAA's Cydoemus and Hysminai, freefloating, 5,906 tons needed (each), 5,000 tons used (each), 906 tons added (each)


At Palinerus

Type 2 Drydock #1 - Subs R-117/R-118 launched, 735 tons needed (each), 490 tons used(each), 245 tons added(each)
Type 0 Drydock #1 - Sub R-119 launched, 735 tons needed, 490 tons used, 245 tons added
Type 0 Drydock #2 - Sub R-120 launched, 735 tons needed, 490 tons used, 245 tons added
Type 0 Drydock #3 - Sub R-121 launched, 735 tons needed, 490 tons used, 245 tons added
Type 0 Drydock #4 - Sub R-122 launched, 735 tons needed, 490 tons used, 245 tons added



At Phelleus

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - DD's Fortunes and Foul scrapping, completes Q2/41
Class 3 Drydock #2 - DD's Flirt and Forsight scrapping, completes Q2/41
Class 5 Drydock #1 - Colombian BC Simon Bolivar rebuild/repair, 14,307 tons needed, 2,000 tons used, 2,000 tons added
Class 1 Slip #1 - L class DD laid down, 1,688 tons needed, 500 tons added
Class 1 Slip #2 - L class DD laid down, 1,688 tons needed, 500 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
CA Apollo freefloating, begins refit, 5,484 tons needed, 1,400 tons added


At Lycabettus

Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - 5 type 2 LCT's laid down, 274 tons needed (each) 100 tons added (each)
Class 2 Drydock #2 - 5 type 2 LCT's laid down, 274 tons needed (each) 100 tons added (each)
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - DD Fury scrapping, completes Q2/41
CA Hector freefloating, begins refit, 5,484 tons needed, 1,400 tons added


At Maracaibo

Class 5 Drydock #1 - Colombian BC Francisco Santander rebuild/repair, 12,334 tons needed, 2,000 tons used, 2,000 tons added
Class 1 drydock #1 - DD Firebrand scrapping, completes Q2/41
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

At Safi

Class 2 Drydock #1 - DD Ferret scrapping, completes Q2/41
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - DD Finch scrapping, completes Q2/41
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Launched ships/freefloating ships being completed: None

Ships completed and on trials:
4 Neptune class BB's completed, begin trials
CV's Active and Antares on trials
CLAA Thanatos and Charon on trials
CLAA's Nemesis and Talion complete trials
6 R-98 class subs on trials
6 R-98 class subs complete trials

Summary of ship building/repairs/rebuilds and convertions.

2 Neptune class BB's building (5,000 tons)
4 Arcturus class CV's building (8,000 tons)
4 Nemesis class CLAA's building (3,624 tons)
6 R-98 class subs building (1,470 tons)
2 Santander class BC rebuilding (4,000 tons)
2 Apollo class refit 2800 tons
Volcan osorno refit, 1,200 tons
Cerasus class refits, 2,000 tons
Submarine XSS-3 minor refit, 51 tons
4 L class, 2,000 tons
8 M class DD 3,200 tons
4 LST 2,000 tons
4 LSD's 7,820 tons
20 LCT's 2,000 tons

D. Transactions
1,000 tons from Byzantium


E. Other Notes
None
F. Miscellaneous Works
None
G. Updated Order of Battle, 1/12/41
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
Battleships:................................17(0)2
Battlecruisers:.............................4(0)0
CV:............................................7(0)4
Training CV's:..............................2(0)0
Training cruisers:.........................2(0)0
CA:............................................10(3)0
CL:.............................................36(4)4
DD: type A................................16(0)0
DD: type B................................112(0)12 (16 F class scrapping)
DD: (type C/ escorts).................80(0)0
Torpedo boats:...........................N/A
Moniters:...................................2(0)0

Escort Cruisers:..........................2(0)0
Sloops:.......................................N/A
Frigates:.....................................8(0)0
Corvettes:...................................N/A
Torpedo gunboats:......................0(0)0
Gunboats:.................................0(0)0
Mine sweepers:.........................24(0)0
Mine warfare vessels:.................16(0)0

Fleet Submarine:.......................32(0)0 (8 decomissioned)
Coastal Submarine:...................102(0)6 (24 decommisioned)
Experimental submarine:..............1(0)0
Mini subs:...................................12(0)0

Floatplane carrier/tenders:..........2(0)0
Airship tenders:.........................2(0)0
Blimp carrier/tenders:................2(0)0
Destroyer depot ships:...............2(0)0
Submarine depot ships:.............4(0)0
Small craft depot ships:..............4(0)0
Repair ships:.............................2(0)0
Transports:...............................10(0)0

Sub chasers:.............................300(0)0
Coastal Motor Torpedo Boats:.....200(0)0
Motor Gunboats:..........................200(0)0
Motor Torpedo Boats:................400(0)0
Motor Launch's:.........................220(0)0
Motor Launch's/minelayer's:..........40(0)0
Landing Ship Infantry..................0(0)0
Landing ship Tank.......................3(0)4
Landing ship Dock ......................0(0)4
Landing Craft Infantry:................200(0)0
Landing Craft Infantry Fast:..........32(0)12
Landing Craft Mechanized..........20(0)0
landing Craft Tank.....................10(0)20
Infantry launches:......................20(0)0

2

Tuesday, March 15th 2016, 11:23am

A. Industrial Allocation

31/31 factories (non fixed) to naval materials: 31,000 tons created for Q2/1942 plus 10,151 tons stockpiled from Q1/42, plus 5,000 tons transfered from foreign sources (4,000 tons from Colombia, 1,000 tons from Byzantium)
Total warship materials: 46,151
43,194 tons used for ship building, 2,957 tons stockpiled for next quarter.
0/31 factory's (non-fixed) to infrastructure development: 0.0 points
0/31 factory's (fixed) to infrastructure development: 0.0 points

B. Infrastructure Development

None

C. Naval Construction

At Cleito

Class 4 Slip #1 - BB Cronus building 47,516 needed, 10,000 tons used, 2,500 tons added
Class 4 Slip #2 - BB Aggamemnon building 47,516 needed, 10,000 tons used, 2,500 tons added
Class 4 Drydock #1 - CL Ceracus refitting, 3,756 tons needed, 1000 tons used, 1000 tons added, launched at end of 2nd quarter
Class 4 Drydock #2 - CL Ithica refitting, 3,756 tons needed, 1000 tons used, 1000 tons added, launched at end of 2nd quarter
Class 1 Slip #1 - LST-4 building, 1,807 tons needed, 500 tons used, 500 tons added
Class 1 Slip #2 - LST-5 building, 1,807 tons needed, 500 tons used, 500 tons added
Class 1 Slip #3 - L class DD building, 1,681 tons needed, 500 tons used, 500 tons added
Class 1 Slip #4 - L class DD building, 1,681 tons needed, 500 tons used, 500 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

At Eridanus

Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - CL Orestes begins refitting, 3,756 tons needed, 0 tons used, 1000 tons added, launched at end of 3rd quarter
Class 4 Drydock #2 - CL Atreus begins refitting, 3,756 tons needed, 0 tons used, 1000 tons added, launched at end of 3rd quarter
Class 2 Slip #1 - LSD Amuay Bay building, 12,455 tons needed, 1,955 tons used, 1,700 tons added
Class 2 Slip #2 - LSD Playa Blanca building, 12,455 tons needed, 1,955 tons used, 1,700 tons added
Class 2 Drydock #1 - 5 type 2 LCT's building, 274 tons needed (each), 100 tons used (each),100 tons added (each), launched at end of quarter
Class 1 Slip #1 - M class DD building, 1,585 tons needed, 400 tons used, 400 tons added
Class 1 Slip #2 - M class DD building, 1,585 tons needed, 400 tons used, 400 tons added
Class 1 Slip #3 - M class DD building, 1,585 tons needed, 400 tons used, 400 tons added
Class 1 Slip #4 - M class DD building, 1,585 tons needed, 400 tons used, 400 tons added



At Duecalion

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Submarine XSS-3 minor refit completed, 51 tons needed , 51 tons used
Class 2 Slip #1 - LST-6 building, 1,807 tons needed, 500 tons used, 500 tons added
Class 2 Slip #2 - LST-7 building, 1,807 tons needed, 500 tons used, 500 tons added
Class 2 Drydock #1 - 5 type 2 LCT's building, 274 tons needed (each) 100 tons used (each), 100 tons added (each), launched at end of quarter

Class 0 slip #1 - Idle
Class 0 slip #2 - Idle
Class 0 slip #3 - Idle
Class 0 slip #4 - Idle
CV's Atlantes and Acastus feeefloating, , 22,362 tons needed (each), 20,000 tons used (each), 2,362 tons added (each)

CLAA's Acheron and Nausicaa, completed, 5,906 tons needed (each), 5,906 tons used (each)


At Illissus

Class 3 Slip #1 - CV Aleron building, 22,362 tons needed, 12,000 tons used, 2,000 tons added
Class 3 Slip #2 - CV Aurora building, 22,362 tons needed, 12,000 tons used, 2,000 tons added
Class 3 Drydock #1 - DD's Falcon and Fox scrapping, completes Q2/42
Class 2 Slip #1 - LSD Playa de las Americas building, 12,455 tons needed, 1,955 tons used, 1,700 tons added
Class 2 Slip #2 - LSD Playa Bonaire building, 12,455 tons needed, 1,955 tons used, 1,700 tons added
Class 2 Drydock #1 - DD Fervent scrapping, completes Q2/42
Class 1 Slip #1 - M class DD building, 1,585 tons needed, 400 tons used, 400 tons added
Class 1 Slip #2 - M class DD building, 1,585 tons needed, 400 tons used, 400 tons added
Class 1 Slip #3 - M class DD building, 1,585 tons needed, 400 tons used, 400 tons added
Class 1 Slip #4 - M class DD building, 1,585 tons needed, 400 tons used, 400 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
CA Volcan Osorno refitting, 4,788 tons needed, 1,200 tons used, 1,200 tons added

CLAA's Cydoemus and Hysminai completed, 5,906 tons needed (each), 5,906 tons used (each)


At Palinerus

Type 2 Drydock #1 - Subs R-123/R-124 laid down, 735 tons needed (each), 245 tons added(each)
Type 0 Drydock #1 - Sub R-125 laid down, 735 tons needed, 245 tons added
Type 0 Drydock #2 - Sub R-126 laid down, 735 tons needed, 245 tons added
Type 0 Drydock #3 - Sub R-127 laid down, 735 tons needed, 245 tons added
Type 0 Drydock #4 - Sub R-128 laid down, 735 tons needed, 245 tons added

Subs R-117 through 122 completed, begin trials

At Phelleus

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - DD's Fortunes and Foul scrapping, completes Q2/42
Class 3 Drydock #2 - DD's Flirt and Forsight scrapping, completes Q2/42
Class 5 Drydock #1 - Colombian BC Simon Bolivar rebuild/repair, 14,307 tons needed, 4,000 tons used, 2,000 tons added
Class 1 Slip #1 - L class DD building, 1,681 tons needed, 500 tons used, 500 tons added
Class 1 Slip #2 - L class DD building, 1,681 tons needed, 500 tons used, 500 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
CA Apollo freefloating, refitting, 5,484 tons needed, 1,400 tons used, 1,400 tons added


At Lycabettus

Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - 5 type 2 LCT's building, 274 tons needed (each), 100 tons used (each), 100 tons added (each), launched at end of quarter
Class 2 Drydock #2 - 5 type 2 LCT's building, 274 tons needed (each), 100 tons used (each), 100 tons added (each), launched at end of quarter
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - DD Fury scrapping, completes Q2/42
CA Hector freefloating, refitting, 5,484 tons needed, 1,400 tons used, 1,400 tons added


At Maracaibo

Class 5 Drydock #1 - Colombian BC Francisco Santander rebuild/repair, 12,334 tons needed, 4,000 tons used, 2,000 tons added
Class 1 drydock #1 - DD Firebrand scrapping, completes Q2/42
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

At Safi

Class 2 Drydock #1 - DD Ferret scrapping, completes Q2/42
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - DD Finch scrapping, completes Q2/42
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Launched ships/freefloating ships being completed: None

Ships completed and on trials:
4 Neptune class BB's completed, begin trials
CV's Active and Antares on trials
CLAA Thanatos and Charon complete trials
CLAA's Acheron, Nausicaa, Cydoemus and Hysminai begin trials
6 R-98 class subs on trials
6 R-98 class subs complete trials
Submarine XSS-3 begins trials

Summary of ship building/repairs/rebuilds and convertions.

2 Neptune class BB's building (5,000 tons)
4 Arcturus class CV's building (8,724 tons)
6 R-98 class subs building (1,470 tons)
2 Santander class BC rebuilding (4,000 tons)
2 Apollo class refit 2800 tons
Volcan osorno refit, 1,200 tons
Cerasus class refits, 4,000 tons
4 L class, 2000 tons
8 M class DD 3200 tons
4 LST 2000 tons
4 LSD's 6800 tons
20 LCT's 2,000 tons
Total: 43,194 tons
11 F class DD's scrapping, tonnage recovered in Q4/42 (1,980 tons)

D. Transactions
1,000 tons from Byzantium


E. Other Notes
None
F. Miscellaneous Works
None
G. Updated Order of Battle, 1/12/41
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
Battleships:................................17(0)2
Battlecruisers:.............................4(0)0
CV:............................................7(0)4
Training CV's:..............................2(0)0
Training cruisers:.........................2(0)0
CA:............................................10(3)0
CL:.............................................40(4)0
DD: type A................................16(0)0
DD: type B................................112(0)12 (16 F class scrapping)
DD: (type C/ escorts).................80(0)0
Torpedo boats:...........................N/A
Moniters:...................................2(0)0

Escort Cruisers:..........................2(0)0
Sloops:.......................................N/A
Frigates:.....................................8(0)0
Corvettes:...................................N/A
Torpedo gunboats:......................0(0)0
Gunboats:.................................0(0)0
Mine sweepers:.........................24(0)0
Mine warfare vessels:.................16(0)0

Fleet Submarine:.......................42(0)0
Coastal Submarine:...................102(0)6
Experimental submarine:..............1(0)0
Mini subs:...................................12(0)0

Floatplane carrier/tenders:..........2(0)0
Airship tenders:.........................2(0)0
Blimp carrier/tenders:................2(0)0
Destroyer depot ships:...............2(0)0
Submarine depot ships:.............4(0)0
Small craft depot ships:..............4(0)0
Repair ships:.............................2(0)0
Transports:...............................10(0)0

Sub chasers:.............................300(0)0
Coastal Motor Torpedo Boats:.....200(0)0
Motor Gunboats:..........................200(0)0
Motor Torpedo Boats:................400(0)0
Motor Launch's:.........................220(0)0
Motor Launch's/minelayer's:..........40(0)0
Landing Ship Infantry..................0(0)0
Landing ship Tank.......................3(0)4
Landing ship Dock ......................0(0)4
Landing Craft Infantry:................200(0)0
Landing Craft Infantry Fast:..........32(0)12
Landing Craft Mechanized..........20(0)0
landing Craft Tank.....................10(0)20
Infantry launches:......................20(0)0

3

Tuesday, March 15th 2016, 11:24am

A. Industrial Allocation

31/31 factories (non fixed) to naval materials: 31,000 tons created for Q3/1942 plus 2,957 tons stockpiled from Q2/42, plus 5,000 tons transfered from foreign sources (4,000 tons from Colombia, 1,000 tons from Byzantium)
Total warship materials: 38,957
38,150 tons used for ship building, 807 tons stockpiled for next quarter.
0/31 factory's (non-fixed) to infrastructure development: 0.0 points
0/31 factory's (fixed) to infrastructure development: 0.0 points

B. Infrastructure Development

None

C. Naval Construction

At Cleito

Class 4 Slip #1 - BB Cronus building 47,516 needed, 12,500 tons used, 2,500 tons added
Class 4 Slip #2 - BB Aggamemnon building 47,516 needed, 12,500 tons used, 2,500 tons added
Class 4 Drydock #1 - CL Ceracus launched, 3,756 tons needed, 2000 tons used, 1000 tons added, launched at end of quarter
Class 4 Drydock #2 - CL Ithica launched, 3,756 tons needed, 2000 tons used, 1000 tons added, launched at end of quarter
Class 1 Slip #1 - LST-4 building, 1,807 tons needed, 1,000 tons used, 500 tons added, launched at end of quarter
Class 1 Slip #2 - LST-5 building, 1,807 tons needed, 1,000 tons used, 500 tons added, launched at end of quarter
Class 1 Slip #3 - L class DD launched, 1,681 tons needed, 1,000 tons used, 500 tons added
Class 1 Slip #4 - L class DD launched, 1,681 tons needed, 1,000 tons used, 500 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

At Eridanus

Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - CL Orestes refitting, 3,756 tons needed, 1,000 tons used, 1000 tons added, launched at end of quarter
Class 4 Drydock #2 - CL Atreus refitting, 3,756 tons needed, 1,000 tons used, 1000 tons added, launched at end of quarter
Class 2 Slip #1 - LSD Amuay Bay building, 12,455 tons needed, 3,655 tons used, 1,700 tons added
Class 2 Slip #2 - LSD Playa Blanca building, 12,455 tons needed, 3,655 tons used, 1,700 tons added
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - M class DD launched, 1,585 tons needed, 800 tons used, 400 tons added
Class 1 Slip #2 - M class DD launched, 1,585 tons needed, 800 tons used, 400 tons added
Class 1 Slip #3 - M class DD launched, 1,585 tons needed, 800 tons used, 400 tons added
Class 1 Slip #4 - M class DD launched, 1,585 tons needed, 800 tons used, 400 tons added
5 type 2 LCT's freefloating, 274 tons needed (each), 200 tons used (each),74 tons added (each)



At Duecalion

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - CL Triumph scrapping, to complete in Q4 42
Class 2 Slip #1 - LST-6 building, 1,807 tons needed, 1,000 tons used, 500 tons added, launched at end of quarter
Class 2 Slip #2 - LST-7 building, 1,807 tons needed, 1,000 tons used, 500 tons added, launched at end of quarter
Class 2 Drydock #1 - Idle
Class 0 slip #1 - Idle
Class 0 slip #2 - Idle
Class 0 slip #3 - Idle
Class 0 slip #4 - Idle
CV's Atlantes and Acastus completed, 22,362 tons needed (each), 22,362 tons used (each)
5 type 2 LCT's freefloating, 274 tons needed (each) 200 tons used (each), 74 tons added (each)

At Illissus

Class 3 Slip #1 - CV Aleron building, 22,362 tons needed, 14,000 tons used, 2,000 tons added
Class 3 Slip #2 - CV Aurora building, 22,362 tons needed, 14,000 tons used, 2,000 tons added
Class 3 Drydock #1 - CL Concord scrapping, to complete in Q4 42
Class 2 Slip #1 - LSD Playa de las Americas building, 12,455 tons needed, 3,655 tons used, 1,700 tons added
Class 2 Slip #2 - LSD Playa Bonaire building, 12,455 tons needed, 3,655 tons used, 1,700 tons added
Class 2 Drydock #1 - DD Forester scrapping, completes Q4/42
Class 1 Slip #1 - M class DD launched, 1,585 tons needed, 800 tons used, 400 tons added
Class 1 Slip #2 - M class DD launched, 1,585 tons needed, 800 tons used, 400 tons added
Class 1 Slip #3 - M class DD launched, 1,585 tons needed, 800 tons used, 400 tons added
Class 1 Slip #4 - M class DD launched, 1,585 tons needed, 800 tons used, 400 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
CA Volcan Osorno refitting, 4,788 tons needed, 2,400 tons used, 1,200 tons added


At Palinerus

Type 2 Drydock #1 - Subs R-123/R-124 laid down, 735 tons needed (each), 245 tons used (each), 245 tons added(each)
Type 0 Drydock #1 - Sub R-125 laid down, 735 tons needed, 245 tons used, 245 tons added
Type 0 Drydock #2 - Sub R-126 laid down, 735 tons needed, 245 tons used, 245 tons added
Type 0 Drydock #3 - Sub R-127 laid down, 735 tons needed, 245 tons used, 245 tons added
Type 0 Drydock #4 - Sub R-128 laid down, 735 tons needed, 245 tons used, 245 tons added



At Phelleus

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - CL Intrepid scrapping, to complete in Q4 42
Class 3 Drydock #2 - CL Lively scrapping, to complete in Q4 42
Class 5 Drydock #1 - Colombian BC Simon Bolivar rebuild/repair, 14,307 tons needed, 6,000 tons used, 2,000 tons added
Class 1 Slip #1 - L class DD launched, 1,681 tons needed, 1,000 tons used, 500 tons added
Class 1 Slip #2 - L class DD launched, 1,681 tons needed, 1,000 tons used, 500 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
CA Apollo refitting, 5,484 tons needed, 2,800 tons used, 1,400 tons added


At Lycabettus

Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - DD Fame scrapping, completes Q4/41
CA Hector refitting, 5,484 tons needed, 2,800 tons used, 1,400 tons added
10 type 2 LCT's freefloating, 274 tons needed (each) 200 tons used (each), 74 tons added (each)

At Maracaibo

Class 5 Drydock #1 - Colombian BC Francisco Santander rebuild/repair, 12,334 tons needed, 6,000 tons used, 2,000 tons added
Class 1 drydock #1 - DD Forge scrapping, completes Q4/41
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
4x MTB-404 class MTB's building, 50 tons needed (each), 50 tons added (each)


At Safi

Class 2 Drydock #1 - DD Frenzy scrapping, completes Q4/41
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - DD Fortunate scrapping, completes Q4/41
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Launched ships/freefloating ships being completed: None

Ships completed and on trials:
4 Neptune class BB's complete trials
CV's Active and Antares complete trials
CLAA's Acheron, Nausicaa, Cydoemus and Hysminai on trials
6 R-98 class subs on trials
6 R-98 class subs complete trials
Submarine XSS-3 begins trials

Summary of ship building/repairs/rebuilds and convertions.

2 Neptune class BB's building (5,000 tons)
2 Arcturus class CV's building (4,000 tons)
6 R-98 class subs building (1,470 tons)
2 Santander class BC rebuilding (4,000 tons)
2 Apollo class refit 2,800 tons
Volcan osorno refit, 1,200 tons
Cerasus class refits, 4,000 tons
4 L class, 2,000 tons
8 M class DD 3,200 tons
4 LST 2,000 tons
4 LSD's 6,800 tons
20 LCT's 1,480 tons
4x MTB-404 class MTB's 200 tons
Total: 38,150 tons
4 Warrior class CL's scrapping, tonnage recovered in Q2/43 (4,192 tons)
11 F class DD's scrapped, tonnage recovered in Q4/42 (1,980 tons)
5 F class DD's scrapping, tonnage recovered in Q2/43 (900 tons)

D. Transactions
4,000 tons from Colombia
1,000 tons from Byzantium


E. Other Notes
None
F. Miscellaneous Works
None
G. Updated Order of Battle, 1/12/41
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
Battleships:................................17(0)2
Battlecruisers:.............................4(0)0
CV:............................................7(0)4
Training CV's:..............................2(0)0
Training cruisers:.........................2(0)0
CA:............................................10(3)0
CL:.............................................40(4)0
DD: type A................................16(0)0
DD: type B................................112(0)12 (16 F class scrapping)
DD: (type C/ escorts).................80(0)0
Torpedo boats:...........................N/A
Moniters:...................................2(0)0

Escort Cruisers:..........................2(0)0
Sloops:.......................................N/A
Frigates:.....................................8(0)0
Corvettes:...................................N/A
Torpedo gunboats:......................0(0)0
Gunboats:.................................0(0)0
Mine sweepers:.........................24(0)0
Mine warfare vessels:.................16(0)0

Fleet Submarine:.......................32(0)0 (8 decomissioned)
Coastal Submarine:...................102(0)6 (24 decommisioned)
Experimental submarine:..............1(0)0
Mini subs:...................................12(0)0

Floatplane carrier/tenders:..........2(0)0
Airship tenders:.........................2(0)0
Blimp carrier/tenders:................2(0)0
Destroyer depot ships:...............2(0)0
Submarine depot ships:.............4(0)0
Small craft depot ships:..............4(0)0
Repair ships:.............................2(0)0
Transports:...............................10(0)0

Sub chasers:.............................300(0)0
Coastal Motor Torpedo Boats:.....200(0)0
Motor Gunboats:..........................200(0)0
Motor Torpedo Boats:................400(0)0
Motor Launch's:.........................220(0)0
Motor Launch's/minelayer's:..........40(0)0
Landing Ship Infantry..................0(0)0
Landing ship Tank.......................3(0)4
Landing ship Dock ......................0(0)4
Landing Craft Infantry:................200(0)0
Landing Craft Infantry Fast:..........32(0)12
Landing Craft Mechanized..........20(0)0
landing Craft Tank.....................10(0)20
Infantry Launch's:......................20(0)0

4

Tuesday, March 15th 2016, 11:25am

A. Industrial Allocation

31/31 factories (non fixed) to naval materials: 31,000 tons created for Q4/1942 plus 807 tons stockpiled from Q3/42, plus 2,000 tons transfered from foreign sources (1,000 tons from Colombia, 1,000 tons from Byzantium) plus 1,980 tons from scrap materials collected
Total warship materials: 35,787
35,787 tons used for ship building, 0 tons stockpiled for next quarter.
0/31 factory's (non-fixed) to infrastructure development: 0.0 points
0/31 factory's (fixed) to infrastructure development: 0.0 points

B. Infrastructure Development

None

C. Naval Construction

At Cleito

Class 4 Slip #1 - BB Cronus building 47,516 needed, 15,000 tons used, 2,500 tons added
Class 4 Slip #2 - BB Aggamemnon building 47,516 needed, 15,000 tons used, 2,500 tons added
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
CL's Ceracus and Ithica refitting, 3,757 tons needed (each), 3000 tons used (each), 757 tons added (each)
LST's 4 and 5 building , 1,807 tons needed (each) , 1,500 tons used (each), 307 tons added (each)
2x L class DD's freefloating, 1,681 tons needed (each), 1,500 tons used (each), 181 tons added (each)


At Eridanus

Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - CL Orestes refitting, 3,756 tons needed, 2,000 tons used, 1000 tons added, launched at end of quarter
Class 4 Drydock #2 - CL Atreus refitting, 3,756 tons needed, 2,000 tons used, 1000 tons added, launched at end of quarter
Class 2 Slip #1 - LSD Amuay Bay building, 12,455 tons needed, 5,355 tons used, 1,700 tons added
Class 2 Slip #2 - LSD Playa Blanca building, 12,455 tons needed, 5,355 tons used, 1,700 tons added
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
4xM class DD's freefloating, 1,585 tons needed (each), 1,200 tons used (each), 385 tons added (each)
5 type 2 LCT's completed, 274 tons needed (each), 274 tons used (each)



At Duecalion

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - CL Triumph scrapping, to complete in Q4 42
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 0 slip #1 - Idle
Class 0 slip #2 - Idle
Class 0 slip #3 - Idle
Class 0 slip #4 - Idle
LST's 6 and 7 building , 1,807 tons needed (each) , 1,500 tons used (each), 307 tons added (each)
5 type 2 LCT's completed, 274 tons needed (each) 274 tons used (each)


At Illissus

Class 3 Slip #1 - CV Aleron building, 22,362 tons needed, 16,000 tons used, 2,000 tons added
Class 3 Slip #2 - CV Aurora building, 22,362 tons needed, 16,000 tons used, 2,000 tons added
Class 3 Drydock #1 - CL Concord scrapping, to complete in Q4 42
Class 2 Slip #1 - LSD Playa de las Americas building, 12,455 tons needed, 5,355 tons used, 1,700 tons added
Class 2 Slip #2 - LSD Playa Bonaire building, 12,455 tons needed, 5,355 tons used, 1,700 tons added
Class 2 Drydock #1 - DD Forester scrapping, completes Q4/42
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
CA Volcan Osorno refitting, 4,788 tons needed, 3,600 tons used, 1,188 tons added
4xM class DD's freefloating, 1,585 tons needed (each), 1,200 tons used (each), 385 tons added (each)
5 type 2 LCT's completed 274 tons needed (each), 274 tons used (each)


At Palinerus

Type 2 Drydock #1 - Subs R-123/R-124 launched, 735 tons needed (each), 490 tons used (each), 245 tons added(each)
Type 0 Drydock #1 - Sub R-125 launched, 735 tons needed, 490 tons used, 245 tons added
Type 0 Drydock #2 - Sub R-126 launched, 735 tons needed, 490 tons used, 245 tons added
Type 0 Drydock #3 - Sub R-127 launched, 735 tons needed, 490 tons used, 245 tons added
Type 0 Drydock #4 - Sub R-128 launched, 735 tons needed, 490 tons used, 245 tons added



At Phelleus

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - CL Intrepid scrapping, to complete in Q4 42
Class 3 Drydock #2 - CL Lively scrapping, to complete in Q4 42
Class 5 Drydock #1 - Colombian BC Simon Bolivar rebuild/repair, 14,307 tons needed, 8,000 tons used, 2,000 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
CA Apollo refitting, 5,484 tons needed, 4,200 tons used, 1,284 tons added
2x L class DD's freefloating, 1,681 tons needed (each), 1,500 tons used (each), 181 tons added (each)

At Lycabettus

Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - DD Fame scrapping, completes Q4/41
CA Hector refitting, 5,484 tons needed, 4,200 tons used, 1,284 tons added
10 type 2 LCT's completed, 274 tons needed (each), 274 tons used (each)


At Maracaibo

Class 5 Drydock #1 - Colombian BC Francisco Santander rebuild/repair, 12,334 tons needed, 8,000 tons used, 2,000 tons added
Class 1 drydock #1 - DD Forge scrapping, completes Q4/41
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Salvage tug Pelican building, 1,419 tons needed, 0 tons used, 279 tons added
Class 0 Slip #2 - Salvage tug Cormorant building, 1,419 tons needed, 0 tons used, 277 tons added
Class 0 Slip #3 - Salvage tug Albatross building, 1,419 tons needed, 0 tons used, 277 tons added
Class 0 Slip #4 - Salvage tug Fulmar building, 1,419 tons needed, 0 tons used, 277 tons added
4x MTB-404 class MTB's completed, 50 tons needed (each), 50 tons used (each)


At Safi

Class 2 Drydock #1 - DD Frenzy scrapping, completes Q4/41
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - DD Fortunate scrapping, completes Q4/41
Class 0 Slip #1 - Salvage tug Petrel building, 1,419 tons needed, 324 tons used, 277 tons added
Class 0 Slip #2 - Salvage tug Heron building, 1,419 tons needed, 0 tons used, 277 tons added
Class 0 Slip #3 - Salvage tug Skua, 1,419 tons needed, 0 tons used, 277 tons added
Class 0 Slip #4 - Salvage tug Tern, 1,419 tons needed, 0 tons used, 277 tons added

Launched ships/freefloating ships being completed: None

Ships completed and on trials:

CLAA's Acheron, Nausicaa, Cydoemus and Hysminai on trials
6 R-98 class subs on trials
6 R-98 class subs complete trials
4x MTB-404 class MTB's 200 tons
20 type 2 LCT begin trials
Submarine XSS-3 begins trials

Summary of ship building/repairs/rebuilds and convertions.

2 Neptune class BB's building (5,000 tons)
2 Arcturus class CV's building (4,000 tons)
6 R-98 class subs building (1,470 tons)
2 Santander class BC rebuilding (4,000 tons)
Volcan osorno refit, 1,188 tons
2 Apollo class refit 2,568 tons
Cerasus class refits, 3,512 tons
4 L class, 752 tons
8 M class DD 3,080
4 LST 1,228 tons
4 LSD's 6,800 tons
8 Pelican class salvage tugs 2,189 tons
Total: 35,787


D. Transactions
1,000 tons from Byzantium


E. Other Notes
None
F. Miscellaneous Works
None
G. Updated Order of Battle, 1/12/41
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
Battleships:................................17(0)2
Battlecruisers:.............................4(0)0
CV:............................................7(0)4
Training CV's:..............................2(0)0
Training cruisers:.........................2(0)0
CA:............................................10(3)0
CL:.............................................38(4)8
DD: type A................................16(0)0
DD: type B................................112(0)12
DD: (type C/ escorts).................80(0)0
Torpedo boats:...........................N/A
Moniters:...................................2(0)0

Escort Cruisers:..........................2(0)0
Sloops:.......................................N/A
Frigates:.....................................8(0)0
Corvettes:...................................N/A
Torpedo gunboats:......................0(0)0
Gunboats:.................................0(0)0
Mine sweepers:.........................24(0)0
Mine warfare vessels:.................16(0)0

Fleet Submarine:.......................32(0)0 (8 decomissioned)
Coastal Submarine:...................102(0)6 (24 decommisioned)
Experimental submarine:..............1(0)0
Mini subs:...................................12(0)0

Floatplane carrier/tenders:..........2(0)0
Airship tenders:.........................2(0)0
Blimp carrier/tenders:................2(0)0
Destroyer depot ships:...............2(0)0
Submarine depot ships:.............4(0)0
Small craft depot ships:..............4(0)0
Repair ships:.............................2(0)0
Transports:...............................10(0)0

Sub chasers:.............................288(0)0
Coastal Motor Torpedo Boats:.....240(0)0
Motor Gunboats:..........................200(0)0
Motor Torpedo Boats:................400(0)0
Motor Launch's:.........................220(0)0
Motor Launch's/minelayer's:..........40(0)0
Landing Ship Infantry..................0(0)0
Landing ship Tank.......................3(0)4
Landing ship Dock ......................0(0)4
Landing Craft Infantry:................200(0)0
Landing Craft Infantry Fast:..........32(0)12
Landing Craft Mechanized..........20(0)0
landing Craft Tank.....................10(0)20
Infantry Launch's:......................20(0)0
LCPF-X2 type:.........................24(0)0

5

Thursday, March 17th 2016, 9:49pm

What is building/selling for Byzantium?

6

Friday, March 18th 2016, 1:36pm

Nothing at the moment, in the future however there will be ship transfers, most likely the Torto class escort cruisers, a couple of destroyers and some smaller craft, perhaps even some home grown designs.

7

Friday, March 18th 2016, 2:00pm

I noticed similar transfers in 1941 and 1940, without mention of Byzantium receiving anything. Did I overlook something?

8

Saturday, March 19th 2016, 10:15am

I'm not sure what your getting at but I'll try to explain the situation. Byzantium is transferring its tonnage to Atlantis basically because it has nothing to build and currently no clear vision for a future navy. The tonnage is also basically a way for paying for Atlantean efforts to expand civil infrastructure and army/air force equipment and I'll admit a convenient additional source of tonnage. In the future Atlantis will transfer several ships to give the Byzantean's a small navy (IC I'm sure the Byzantean's what something transferred) but I fear it won't be very large as they really only need to be able to defend a small portion of coastline while the Turks basically control access to the sea of Marmara. They also won't likely have a huge manpower pool to work with to man a navy so that's where the Atlantean navy comes in. As newer ships come on line for Atlantis older vessels will be assigned to Byzantean waters, in fact several already are.

I'm dreadfully behind in quarterly reports so posting news on what's going on is practically impossible right now without slowing down progress, perhaps once I'm close to caught up I can start posting news summary's to explain in more detail. You'll also notice Atlantean deployments are not up to date, with 41 being the last update.

9

Saturday, March 19th 2016, 1:37pm

Thanks for your explanation.

From my perspective, this is a one-sided deal and shouldn't be happening. We frowned on Gavin doing this with Italy and the EAS, after all

10

Saturday, March 19th 2016, 1:59pm

I'm unaware of any rules that prevent tonnage transfers as payments, if there are I'm unaware of them. I've already mentioned the other factors as to why no transfers have occurred for the last 3 sim years (1940 through 1942) from a role playing perspective and a player perspective so if there is some other factor you feel I need to present to justify such a transfer please feel free to present it. I'd like to clarify that I haven't adjusted ship deployment lists since 1941.

11

Saturday, March 19th 2016, 2:47pm

I'm sure there are no rigid rules against this. It's why Gavin was able to do this for so long without consequences. It still does not, from my perspective, make it right.

If you'd like, I will spend some time going through Atlantean sim reports since 1921 and will tally up what Atlantis and Byzantium have gained from this transaction to date.

12

Saturday, March 19th 2016, 4:15pm

I'm sure there are no rigid rules against this. It's why Gavin was able to do this for so long without consequences. It still does not, from my perspective, make it right.

If you'd like, I will spend some time going through Atlantean sim reports since 1921 and will tally up what Atlantis and Byzantium have gained from this transaction to date.


While agree that some of us frowned upon Gavin's action in transferring tonnage from the EAS to Italy, there was no rule against it, and we permitted him to do it without significant disagreement, at least while I was playing. Gavin was guilty of far more serious infractions that we did not catch at the time.

That said, I understand that tonnage transfers of this sort skirt the spirit of our rules. I think that rather than ask Wes to attempt to back out any such transfers back to 1921 (a process which has cost us active Italian players) let us agree to a cut off of say 1942, or perhaps 1943, and go forward with Byzantium engaging in naval construction, rather than just piling up tonnage in a nominal account.

If we are going to look all the way back to game start, I think there would be more than enough anomalies for us to find.

13

Saturday, March 19th 2016, 4:49pm

At this point, I'm raising an issue. I'm certainly not asking for any ret-conning.

14

Saturday, March 19th 2016, 5:17pm

I've long done the same regarding Paraguay's tonnage, but then officially the Paraguayan Navy was merged with the Argentine river fleet as a joint force against RSAN river forces. In return several large units have been built and refits of all vessels undertaken. I also assume the tonnage (1,000 tons per quarter) covers running costs and keeping the sole Paraguayan yard occupied and staffed.
I will probably cease this practice though in future and go for payment when specific work is undertaken.

15

Sunday, March 20th 2016, 8:00am

In the case of Gavin, as I recall things, he had the EAS as a territory with factory's and all and used the tonnage produced from those factory's as anyone else would. What I took issue with was how, while bound by treaty, he was using the EAS as an excuse to build treaty limited ships outside his own and counted their tonnage outside of his own limits, basically increasing his tonnage over and above what Italy was allowing. In addition, IC he was using that fleet to basically control a vital seaway. Byzantium does by geography have a certain level of control over both entrances to the sea of Marmara but their fleet certainly doesn't nor has it ever possessed any treaty restricted ships unless you include the ten destroyer escorts of 435 tons. I've seen similar things in others sim reports, more recently the Hedjaz in 1942 for example had 260 tons being held on their behalf by India to be spent at a later date. Persia has also made an agreement with India in 1946 that gives them full access to Indian infrastructure in exchange for contributing to infrastructure for India. I fail to see how that is any different than Byzantium transferring tonnage (that would otherwise be in sim terms wasted) in exchange for future transfers as well as aircraft and land equipment while still having full and primary use of their slips/drydocks. If there is an issue with this type of practice then it seems odd that one would do something similar while protesting against it.

I'm going to wait for further discussion on the matter before retconning any reports already posted or in the pipeline as well as holding off on posting further reports past 1942, but I'm going to proceed as if that tonnage is not available to me as I continue to work on reports. I'd also request that we discuss this in the proper forum rather than in the reports thread.