You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, August 6th 2007, 3:48am

Colombia Q4/34

Columbia

A. Industrial Allocation

2/4 factories (non fixed) to naval materials: 2,000 tons created for Q4/1934 + 0 tons stockpiled from Q3/34

Total warship materials: 2,000

2,000 tons used for ship building, 0 tons stockpiled for next quarter.

1/4 factory's (fixed) to infrastructure development: 0.1 points for Q4/1934 + 0.1 bonus points
1/4 factory's (non fixed) to infrastructure development: 0.1 points for Q4/1934
0.5 IP's recieved from Atlantis in Q4/1934

Total: 0.8 infrastructure points created for Q4/34

B. Infrastructure Development

0.8 points added to new type 3 slip at Cartagena

C. Naval Construction

Cartagena:
Class 3 Slip #1 - under construction, 3.0 points needed, 2.0 points used, 0.8 points added
Class 2 Slip #1 - Idle
Class 1 Slip #1 - DD San Marcos laid down, 1,583 tons needed, 400 tons added
Class 1 Slip #2 - DD San Martin laid down, 1,583 tons needed, 400 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

MGB-27 and MGB-28 completed, begin trials

Buenaaventura:
Class 2 Slip #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - idle
Class 0 Slip #4 - Idle
Class 3 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

MGB's 29 through 31 completed, begin trials

Launched ships being completed:

None

Ships completed/transfered and on trials

5x611 type MGB's

Building summary

2xSan Onefre class DD's laid down (800 tons)

D. Transactions

0.3 IP's recieved from Atlantis

315 tons transfered to Atlantis for modified Zerberus class CLAA plans, 685 tons already transfered
885 tons transfered for 24 Type 4 subchasers, 2,220 tons needed, 10 boats transfered, 12 building and 2 ordered.


E. Other Notes

Armoured cruisers Cali and Medellin taken out of service to provide crews for Atlantean CL's
4 J class DD's ordered, 2 to be built in Atlantis, 2 in Colombia.

F. Miscellaneous Works

None

F. Updated Order of Battle, 10/1/34

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Battleships:................................0(0)0
Pre dreadnoughts:.......................2(0)0
Armoured Cruisers:.....................2(0)0
Light Cruisers.............................2(0)0
Destroyers:.................................8(0)2 * In Atlantis
Torpedo boats:............................5(0)0
escorts:......................................0(0)0
Gunboats:..................................6(0)0
River Gunboats...........................2(0)0
Submarines:...............................0(0)0
Patrol vessels:............................1(0)0 Armed Tug Jose Felix Ribas
Mine warfare ships:.....................0(0)0
Sub chasers:.............................22(0)2 *type 4's building in Atlantis
Motor Gun Boats:......................25(0)5
Motor Launches:........................5(0)0
Motor Torpedo boats:.................40(0)0
Coastal Motor Torpedo Boats:....40(0)0 * purchased from Atlantis
Depot ships:..............................0(0)0
Auxillary's:................................0(0)0