Romania Q2,1933
A. Factories
3/5 factories = 3000t produced + 4000t stockpiled + 1000 transferred = 8000t
7000t used, 1000t stockpiled
2/5 factories (committed) = 0.2IP’s
0/5 factories (flexible)
B. Infrastructure Development
Factory R6 (8.9P used, 1.1P to complete)
C. Naval Development and Construction
at Galatz:
1 Type 0 slip Idle
1 Type 0 drydock Idle
at Constanta:
1 Type 1 slip- DD Vz31 number 3 laid down April 01 33, 1000t delivered (1317t to complete)
1 Type 1 slip- DD Vz31 number 4 laid down April 01 33, 1000t delivered (1317t to complete)
3 Type 0 slips Idle
1 Type 2 drydock building Cruiser vz31 5000t used(13000t of 13000t) ship launched, will be completed Q4 1933.
1 Type 1 drydock Idle
1 Type 0 drydock Idle
D. Transactions
1000t transferred from Yugoslavia
E. Other Notes
Ships laid down this quarter: 2 VZ31 destroyers
F. Scrappage Report
none
G. Updated Order of Battle, 30 June 1933
BB 1(0)+0
CA 0(0)+1
CL 1(0)+0
DD 12(0)+2
TB 13(0)+0
GB 7(0)+0
M 7(0)+0
Subs 2(0)+0
This post has been edited 2 times, last edit by "perdedor99" (Jun 6th 2007, 1:11am)