[SIZE=5]Report for Q2/1942[/SIZE]
[SIZE=3]
Industrial Allocation[/SIZE]
- 22/27 factories producing 22,000t materials.
- 5/27 factories producing infrastructure
- 4,099t from stockpile.
- 0t from transactions.
- 660t from scrapping.
- 26,759t materials total.
- 22,832t used.
- 3,927t stored for Q4/42.
[SIZE=3]
Infrastructure Development [/SIZE]
5 factories dedicated to IP, producing 0.5 IP. 1.5 IP added to half-factory, 3.5 IP remaining.
[SIZE=3]
Naval Construction [/SIZE]
At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Aircraft Carrier
Vengeur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q3/1942 for a total of 21000 / 33000 tons. 12000 / 33000 tons remaining. Launched June 24th, 1942. Completion planned for May 1st, 1944.
Class 4 Slip #1 - Aircraft Carrier
Pacificateur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q3/1942 for a total of 21000 / 33000 tons. 12000 / 33000 tons remaining. Launched June 24th, 1942. Completion planned for May 1st, 1944.
Class 3 Slip #1 - Heavy Cruiser
Jean Bart laid down January 1st, 1942. 17,700 tons required. 250 tons added in Q31942 for a total of 750 / 17700 tons. 16,950 / 17700 tons remaining. Launch planned for June 24th, 1943. Completion planned for March 10th, 1944.
Class 3 Slip #2 - Heavy Cruiser
Jeanne d'Arc laid down January 1st, 1942. 17,700 tons required. 250 tons added in Q31942 for a total of 750 / 17700 tons. 16,950 / 17700 tons remaining. Launch planned for June 24th, 1943. Completion planned for March 10th, 1944.
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 1 Slip #1 - Contre-Torpillieur
Navarin (
Sabre class,
Barfleur subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Slip #2 - Contre-Torpillieur
Fou-Tchéou (
Sabre class,
Barfleur subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Slip #3 - Contre-Torpillieur
Grand Port (
Sabre class,
Barfleur subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Slip #4 - Contre-Torpillieur
Bévéziers (
Sabre class,
Barfleur subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 0 Slip #1 - CDIC-200 landing craft
C5 laid down July 1st, 1942. 145 tons required. 145 tons added in Q3/1942 for a total of 145 / 145 tons. 0 / 145 tons remaining. Launched complete July 31st, 1942. Completed.
Class 0 Slip #2 - CDIC-200 landing craft
C6 laid down July 1st, 1942. 145 tons required. 145 tons added in Q3/1942 for a total of 145 / 145 tons. 0 / 145 tons remaining. Launched complete July 31st, 1942. Completed.
Class 0 Slip #3 - Infantry landing craft
Fantassin laid down July 1st, 1942. 179 tons required. 105 tons added in Q3/1942 for a total of 105 / 179 tons. 0 / 145 tons remaining. Launched September 1st, 1942. Will complete December 1942.
Class 0 Slip #4 - Infantry landing craft
Tirailleur laid down July 1st, 1942. 179 tons required. 105 tons added in Q3/1942 for a total of 105 / 179 tons. 0 / 145 tons remaining. Launched complete September 1st, 1942. Will complete December 1942.
Dockside:
- Contre-Torpillieur
Barfleur (
Sabre class,
Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur
La Rochelle (
Sabre class,
Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur
Cap Lézard (
Sabre class,
Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur
Baie de Chesapeake (
Sabre class,
Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Merchant ship
Chaîne des Puys converted into transport. 211 tons required. 211 tons added in Q3/42 for a total of 211 / 211 tons. 0 / 211 tons remaining; conversion completes.
- Salvage Tug
Sagittaire refitted. 223 tons required. 223 tons added in Q3/42 for a total of 223 / 223 tons. 0 / 223 tons remaining; conversion completes.
- Light Repair Ship
Ophiuchus acquired as naval auxiliary. 73 tons required. 73 tons added in Q3/42 for a total of 73 / 73 tons. 0 / 73 tons remaining; conversion completes.
At Brest (Cl 5)
Class 3 Drydock #1 - Heavy Cruiser
Duquesne undergoing partial reconstruction. 4,857 tons requred. 1,500 tons added in Q3/1942 for a total of 4500 / 4857. 357 / 4857 tons remaining. Reconstruction will complete October 11th, 1942.
Class 2 Drydock #1 - Contre-torpilleur
L'Indomptable undergoes major refit. 428 tons required. 428 tons added in Q3/1942 for a total of 428 / 428. 0 / 428 tons remaining. Reconstruction completed August 23rd, 1942.
Class 1 Drydock #1 -
Eagle class submarine #1 scrapping. 151.4 tons recovered Q3/1942.
Dockside:
- Escorteur rapide
Le Breton laid down January 1st, 1942. 1,185 tons required. 350 tons added in Q3/1942 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched May 3rd, 1942. Completed November 6th, 1942.
- Freighter
211 acquired as naval auxiliary. 211 tons required. 211 tons added in Q3/42 for a total of 211 / 211 tons. 0 / 394 tons remaining; conversion completes.
At Abidjan (Cl 5)
Class 3 Drydock #1 -
Eagle class submarine #2 scrapping. 151.4 tons recovered Q3/1942.
Eagle class submarine #3 scrapping. 151.4 tons recovered Q3/1942.
Eagle class submarine #4 scrapping. 151.4 tons recovered Q3/1942.
Class 1 Drydock #1 -
Eagle class submarine #5 scrapping. 151.4 tons recovered Q3/1942.
At Marseilles (Cl 5)
Class 4 Drydock #1 - Battleship
Bretagne scrapping. 10 months to scrap. 939 tons recovered Q3/42 for total of 1878 / 3129 tons recovered. 1251 tons remaining.
Class 3 Slip #1 - Contre-Torpillieur
Glaive (
Sabre class,
Cimeterre subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 3 Slip #2 - Contre-Torpillieur
Poignard (
Sabre class,
Cimeterre subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 2 Drydock #1 - Light cruiser
Roncevaux begins partial reconstruction. 1,930 tons requred. 1100 tons added in Q3/1942 for a total of 1100 / 1930. 830 / 1930 tons remaining. Reconstruction completes December 14th, 1942.
Class 1 Slip #1 - Contre-Torpillieur
Pique (
Sabre class,
Cimeterre subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Slip #2 - Contre-Torpillieur
Épieu (
Sabre class,
Cimeterre subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Drydock #1 -
Eagle class submarine #6 scrapping. 151.4 tons recovered Q3/1942.
Class 0 Drydock #1 - Harbor tug
Étang de Biscarosse refitting. 27 tons added Q3/1942 for a total of 27 / 27 tons. Refit completed.
Dockside:
- Aircraft Carrier
Bucentaure laid down Q1/39. 35,000 tons required. 1000 tons added Q3/1942 for total of 35000 / 35000 tons. 0 / 35000 tons remaining. Completed on August 30th, 1942.
- Contre-Torpillieur
Cimeterre (
Sabre class,
Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur
Dague (
Sabre class,
Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur
Cognée (
Sabre class,
Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur
Arquebuse (
Sabre class,
Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
At Oran (Cl 5)
Class 1 Drydock #1 -
Eagle class submarine #7 scrapping. 151.4 tons recovered Q3/1942.
Class 0 Drydock #1 -
Eagle class submarine #8 scrapping. 151.4 tons recovered Q3/1942.
Dockside:
- Freighter
Le Drâa acquired as naval auxiliary (destroyer tender). 394 tons required. 394 tons added in Q3/42 for a total of 394 / 394 tons. 0 / 394 tons remaining; conversion completes.
At Tunis (Cl 5)
Class 4 Drydock #1 - Battleship
Provence scrapping. 10 months to scrap. 939 tons recovered Q3/42 for total of 1878 / 3129 tons recovered. 1251 tons remaining.
Class 3 Slip #1 - Idle
Class 1 drydock #1 -
Eagle class submarine #9 scrapping. 151.4 tons recovered Q3/1942.
Dockside:
- Aircraft Carrier
Conquérant laid down Q2/39. 35,000 tons required. 1000 tons added Q3/1942 for total of 34000 / 35000 tons. 1000 / 35000 tons remaining until completion on November 30th, 1942.
- Coastal oiler
Romainville acquired as naval auxiliary. 100 tons required. 100 tons added in Q3/42 for a total of 100 / 100 tons. 0 / 100 tons remaining; conversion completes.
- Coastal oiler
Villeneuve-Saint-Georges acquired as naval auxiliary. 100 tons required. 100 tons added in Q3/42 for a total of 100 / 100 tons. 0 / 100 tons remaining; conversion completes.
At Beiruit (Cl 5)
Class 3 Drydock #1 - Light cruiser
Jules Michelet scrapping. 1159 tons recoverable. 632 / 1159 tons recovered Q3/42.
Class 1 Drydock #1 -
Eagle class submarine #10 scrapping. 151.4 tons recovered Q3/1942.
Dockside:
- None
At Djibouti (Cl 2)
Class 2 Drydock #1 - Light cruiser
Edgard Quinet scrapping. 1159 tons recoverable. 632 / 1159 tons recovered Q3/42.
Class 1 Drydock -
Eagle class submarine #11 scrapping. 151.4 tons recovered Q3/1942.
Class 1 Drydock #1 -
Eagle class submarine #12 scrapping. 151.4 tons recovered Q3/1942.
Dockside:
- None
At Saigon (Cl 5)
Class 4 Drydock #1 - Light cruiser
Waldeck Rousseau scrapping. 1159 tons recoverable. 632 / 1159 tons recovered Q3/42.
Class 1 Drydock #1 -
Eagle class submarine #13 scrapping. 151.4 tons recovered Q3/1942.
Class 0 Drydock #1 -
Eagle class submarine #14 scrapping. 151.4 tons recovered Q3/1942.
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down July 1st; 8 tons added Q3/42. Completed July 31st, 1942, launched. Vedette FOM 11m laid down July 1st; 8 tons added Q3/42. Completed July 31st, 1942, launched
Class 0 Slip #2 - Idle
Dockside:
- Freighter
Aitné acquired as naval auxiliary. 163 tons required. 163 tons added in Q3/42 for a total of 163 / 163 tons. 0 / 163 tons remaining; conversion completes.
Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle
At New Caledonia (Cl 5)
Class 4 Drydock #1 - Light cruiser
Ernest Renan scrapping. 1159 tons recoverable. 632 / 1159 tons recovered Q3/42.
Class 2 Drydock #1 - Contre-torpilleur
Desaix undergoes major refit. 428 tons required. 428 tons added in Q3/1942 for a total of 428 / 428. 0 / 428 tons remaining. Reconstruction completed August 23rd, 1942.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 -
Eagle class submarine #15 scrapping. 151.4 tons recovered Q3/1942.
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Dockside:
- None
At Papeete (Cl 3)
Class 3.5 Drydock - Idle
Dockside:
- None
On Trials:
- BB
Libertie
- BB
Justice
- CV
Bucentaure
- CL
Turpin
- DD
Bouclier
- DD
Rapière
- DD
Sagaie
- DD
Casque
- LSD
Châteaurenault
[SIZE=3]
From Factories[/SIZE]
- 8x EA-13 landing craft built; 104 tons total (13t each).
[SIZE=3]
Transactions[/SIZE]
8x EA-13s transferred to Indochina Patrouille Navale.
[SIZE=3]
Other Notes [/SIZE]
None
[SIZE=3]
Ships being scrapped [/SIZE]
- 2
Bretagne class battleships (3129 tons per ship)
- 15
Eagle class fleet submarines (151.4 tons per ship)
- Total tonnage in recycling until Q2/1942: (10x66) = 660
- Total tonnage in recycling until Q3/1942: (10x66) = 660
- Total tonnage in recycling until Q4/1942: (9x136 + 15x141) = 3339
- Total tonnage in recycling until Q1/1943: (2x939) = 1878
- Total tonnage inrecycling until Q2/1942: (2x939 + 15x151.4+4x632) = 6677
[SIZE=3]
Updated Order of Battle, End of Q3/1942[/SIZE]
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping
The Fleet
Battleships: 7(0)+0-2
Battlecruisers: 4(0)+0
Aircraft Carriers: 8(0)+3
Heavy Cruisers: 12(1)+2
Light Cruisers: 25(1)+0-4
Coast Defense Ships: 5(0)+0
Destroyers: 64(0)+16
Corvettes: 20(0)+0
Escorteurs Rapides: 0(0)+1
Avisos: 8(0)+0
Fleet Submarines: 24(0)+0
Coastal Submarines: 64(0)+0
Motor Torpedo Boats: 12(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Light Patrol Boats: 8(0)+0
River Gunboats: 34 (0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0
Fleet Train
Fast Oilers: 10(0)+0
Slow Oilers: 5(0)+0
Gasoline Tankers: 3(0)+0
Fleet Tenders: 3(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 1(0)+0
Light Repair Ships: 3(0)+0
Ammunition Ships: 2(0)+0
Transports: 6(0)+0
Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 7(0)+0
Light Harbour Tugs: 3(0)+0
Netlayers: 0(0)+0
Oceanic Research Ship: 2(0)+0
Amphibious Forces:
Dock Landing Ship: 1(0)+0
Vehicle Landing Ship: 2(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 6(0)+0
Infantry Landing Craft Large (EDA-L): 0(0)+2
Tank Landing Craft (EDA): 9(0)+0
Infantry Assault Craft Small (EA): 29(0)+0
Patrouille Navale:
Tank Landing Craft (EDA): 2(0)+0
Infantry Assault Craft (EA): 8(0)+0
Motor Torpedo Boats: 2(0)+0
Vedettes: 6(0)+0
Light Patrol Boats: 4(0)+0