You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, August 18th 2013, 5:25am

Kingdom of Greece Q2 1944

[SIZE=5]Q2 1944[/size]

[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 805t from Stockpile
- 1,500t in from Transactions
- 0t out in Transactions
- 0t in from Scrap
- 12,305t Total materials available
- 9,668t used
- 2,637t stored for Q3/1944

[size=3]Infrastructure Development[/size]
Thessaloniki:
- 0.5 IP added to construct Type 2 Drydock at Thessaloniki. 1.5 installed, 1.5 IP remaining.

[SIZE=3]Naval Construction[/SIZE]

Attica:
D3: - C-4 Helle begins Partial Reconstruction on January 2nd, 1944. 6,407 tons required; 1602 / 6407 added Q2/44 for a total 3204 / 6407. 3,203 tons remaining.
D3: - C-5 Kriti begins Partial Reconstruction on January 2nd, 1944. 6,407 tons required; 1602 / 6407 added Q2/44 for a total 3204 / 6407. 3,203 tons remaining.
D2: - MS-27 Euxanthios and MS-28 Lycos laid down end-to-end on April 4th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.
S2: Idle
S2: Idle
S2: Idle
S1: - Fleet Support Tanker Borysthenis laid down January 4th, 1944. 1,950 tons required; 487.5 / 1950 added Q2/44 for a total 975 / 1950. 975 tons remaining.
S0: - Fleet Tug T4206 laid down January 5th, 1944. 685 tons required; 170 / 685 added in Q2/44 for a total of 340 / 685. 345 tons remaining.
S0: - MS-29 Lysagora laid down April 2nd, 1944. 550 tons required; 165 / 550 added in Q2/44 for a total of 165 / 550. 385 tons remaining.

Dockside:
- AC-9 Thermopylae begins Major Refit on July 2nd, 1943. 7,120 tons required; 1995 / 7120 added Q2/44 for a total 7120 / 7120. 0 tons remaining. Ship re-launched January 13th, 1944. Completes May 5th, 1944. Begins Post-Refit trials May 8th, 1944. Completes trials November 10th, 1944.

Paros:
D1: Idle
D0: - MS-30 Makelo laid down April 2nd, 1944. 550 tons required; 165 / 550 added in Q2/44 for a total of 165 / 550. 385 tons remaining.

Dockside:

Patra:
D1: Idle
S1: - Fleet Support Tanker Hypate laid down January 3rd, 1944. 1,950 tons required; 487.5 / 1950 added Q2/44 for a total 975 / 1950. 975 tons remaining.
D0: Idle

Dockside:

Salamis:
D1: Idle

Dockside:

Souda Bay:
D4: Idle
D3: Idle
S2: Idle
D2: - MS-25 Damnameneus and MS-26 Dexithea laid down end-to-end on April 14th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.
D1.5: - MS-19 Actaeus and MS-20 Argyron laid down end-to-end on April 8th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.
D1.5: - MS-21 Atabyrius and MS-22 Chalcon laid down end-to-end on April 10th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.
D1.5: - MS-23 Chryson and MS-24 Demonax laid down end-to-end on April 12th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.

Dockside:

Thessaloniki:
D2: - Under construction. Began October 1st, 1943. 3.0 IP required; 0.5 / 3.0 added in Q2/44 for a total of 1.5 / 3.0. 1.5 IP remaining.
D0: Idle
S0: - Fleet Tug T4204 laid down January 5th, 1944. 685 tons required; 172 / 685 added in Q2/44 for a total of 344 / 685. 341 tons remaining.
S0: - Fleet Tug T4205 laid down January 5th, 1944. 685 tons required; 172 / 685 added in Q2/44 for a total of 344 / 685. 341 tons remaining.

Dockside:

Volos:
D1: Idle

Dockside:

Limassol:
D3: Idle
D1: Idle

Dockside:

From factories:
- CML-26 ML200 class 200t Coastal Minelayer
- CML-27 ML200 class 200t Coastal Minelayer
- CML-28 ML200 class 200t Coastal Minelayer
- CML-29 ML200 class 200t Coastal Minelayer
- CML-30 ML200 class 200t Coastal Minelayer

On Trials:
- C-40 Artemis Begins trials October 10th, 1943. Completes trials April 14th, 1944.
- C-43 Hephaestus Begins trials January 10th, 1944. Completes trials July 10th, 1944.
- C-44 Dionysis Begins trials January 10th, 1944. Completes trials July 10th, 1944.
- C-45 Hera Begins trials January 10th, 1944. Completes trials July 10th, 1944.
- C-41 Geryon ex-Chapra Begins trials March 20th, 1944. Completes trials September 23rd, 1944.
- C-42 Typhon ex-Chiplun Begins trials March 20th, 1944. Completes trials September 23rd, 1944.

[size=3]Transactions[/size]
- Received 1,500t from Mexico towards the purchase of 4 Leon class Destroyer Leaders and 7 Kolokotronis class Destroyers. Payment 3 of 3.

[size=3]Other Notes[/size]

[size=3]Order of Battle (Greek Navy) Q1 1943[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Fleet Combatants
Battleships 5(0)+0
Heavy Cruisers 4(2)+0
Medium Cruisers 2(0)+0
Light Cruisers 19(0)+0
Aircraft Carriers 1(1)+0
Flotilla Leaders 4(0)+0
Class "A" Destroyers 45(0)+0
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 17(0)+0
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 12(0)+12

Small Combatants
Subchasers (150t) 56(0)+0
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (200t) 25(0)+5
Harbour Launches (65t) 21(0)+0
MTB 96(0)+0
MGB 27(0)+0
MMS 22(0)+0

Auxiliaries
Special transports 5(0)+0
Large Landing Craft (200t) 52(0)+0
Small Landing Craft (65t) 16(0)+0
Tenders 4(0)+0
Fleet Train 8(0)+2
Fleet Tugs 3(0)+3
Harbour Tugs 0(0)+0

Training Squadron
Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0

This post has been edited 1 times, last edit by "Sachmle" (Aug 18th 2013, 5:26am)