You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, March 5th 2013, 8:15pm

Ireland, Q3/1943

[SIZE=3]Industrial Allocation [/SIZE]
- 1/2 factories producing 1,000t materials.
- 1/2 factories producing IP.
- 1318 tons from stockpile.
- 0 tons from transactions.
- 0 tons from scrapping.
- 1,888 tons materials total.
- 400 tons used.
- 1918 tons stockpiled for Q4/43.

[SIZE=3]Infrastructure Development[/SIZE]
1 factory dedicated to IP, produces 0.1 IP.

[SIZE=3]Naval Construction[/SIZE]
Gallagher, Burke & Sons, Galway:
Type 1 drydock #1 - Idle
Type 0 drydock #1 - Idle

Dockside:
- Underway Replenishment Ship Banba laid down October 1st, 1942. 2536 tons required. 0 tons added Q3/43 for a total of 2536 / 2536. Completed Q3/1943.
- Utility Landing Craft Slieve League laid down October 1st, 1942. 400 tons required. 0 tons added Q3/43 for a total of 400 / 400. Completed Q3/1943.

Irish Shipbuilding Company, Rushbrooke Shipyard (Cobh):
Type 1 slip #1 - Upgrading to Type 1.5 Slip, 0.3 IP added of 0.5 IP required.

Dockside:
N/A

Haulbowline Naval Yard:
1 Type 2 drydock #1 - Idle
1 Type 1 drydock #1 - Idle

Dockside:
- Oceanic Patrol Ship Aisling laid down January 1st, 1943. 1370 tons required. 400 tons added Q3/43 for a total of 1200 / 1370. 170 / 1370 remaining until completion in Q4/1943. Launched.

From factories:
N/A

On Trials:
- Patrol ship Maeve running trials until Q4/43.
- Auxiliary Banba running trials until Q1/44.
- Auxiliary Slieve League running trials until Q1/44.

[SIZE=3]Transactions[/SIZE]
- N/A

[SIZE=3]Scrapping[/SIZE]
- 264 tons in recycling until Q1/43.

[SIZE=3]Other Notes[/SIZE]
- None

[SIZE=3]Order of Battle (Irish Naval Service) as of September 30th, 1943[/SIZE]
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction - scrapping.
Cruisers:...............................1(0)+0
Destroyers:...........................4(0)+0
Frigates:...............................7(0)+0
Fishery Patrol Sloops:.............3(0)+1
Submarines:.........................10(0)+0
MGB's:.................................16(0)+0
MTB's:.................................16(0)+0
Mine Sweepers:....................0(0)+0
Submarine Chasers:..............8(0)+0
Motor Lifeboat:.....................1(0)+0
Landing Craft:......................1(0)+0
Auxiliaries:...........................4(0)+0
Armed Naval Tugs:...............2(0)+0

[SIZE=3]Summary[/SIZE]
The Haulbowline Dockyard continues work on the oceanic patrol sloop Aisling. The expansion of the Rushbrooke Dockyard continues. The fleet support ship Banba and the utility landing ship Slieve League are completed in Galway and begin working up.

Inter-Commonwealth Lending Program
Totals loaned to date:
- To UK: 4,508 tons
- To Canada: 747 tons + 1,000 tons non-sim purchases.
- To Australia: 680 tons