Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Kaiser Kirk

Lightbringer and former European Imperialist

  • Send private message

1

Sunday, April 27th 2008, 8:49pm

The Netherlands Q1, 1936

Q1 1936 activity
in which we try to reduce management error

Kingdom of the Netherlands & Kingdom of the Kongo

14/15 factories producing naval materials: 14,000 tons created for Q1/36 . 14,000 total tons + 346 stockpiled from previous quarter + 1,157 tons from scrapping = 15,503 tons

15,426 tons used. 180* tons left for Q2/36


*Edits : On actually making SIMs of the refitted AT, DTs and MLs, I discovered reductions in light tonnage of 150, 41, and an addition of 8 tons.
This means I paid (150x 2 x .3) + (41x 4 x .25) -( 8*.15*15) = 90 + 41 - 18 = 113 to much. I have simply added this to stockpile, bringing that from 77 to 180.


1/15 factories committed for 1935 to infrastructure development (TIDE related) = 0.1 ip

B. Infrastructure Development

+0.1 point to NEI , 1.2ip total

C. Naval Construction

Amsterdam:

Class 3 Slip :- Ersatz Ijelsijk, BB 16, laid down October 1st, 1935, launching October 14th, 1936, Completing May 7, 1938, total 22,664 tons, 500 tons committed, 500 tons added this quarter

Class 2 Slip :- Empty
Class 1 Slip :- Empty

Den Helder:

Class 4 Slip:- Piet Heyn laid down February 16, 1935, launching October 20th, 1936, Completing April 28th, 1939, total 42,068 tons, 7,781 tons committed, 500 tons added this quarter


Class 4 dry-dock : - Walcheren laid down July 1st, 1935, launching on April 12, 1936, and completing on June 16, 1937. launching April 12th, 1936, Completing June 16th, 1937, total 14,884 tons, 2,097 tons committed, 500 tons added this quarter

Den Hague:

Class 3 Slip :- Empty

Class 2 Slip :- Ersatz Ijelsijk, BB 17, laid down October 1st, 1935, launching October 14th, 1936, Completing May 7, 1938, total 22,664 tons, 500 tons committed, 500 tons added this quarter

Class 2 Slip :- Empty

Class 3 Dry-dock :- DT 1, Hermaan class, puts in for Major refit October 1st, 1935, Completes on January 19th, 1936, 1278 tons required, 500 tons committed, 778 added this quarter, Complete
Dock clears February 3rdth, ML-1 Class vessel puts in for Major refit, 135tons added, launches Feb 20th, finish March 18th Complete
Dock clears Feb 27th, ML-1 Class vessel puts in for Major refit, 135tons added, launches March 16th, finishes April 12th

Class 2 Dry-dock :- Empty

Class 1 Dry-dock :- Empty

Ijmuiden:

Class 2 Slip :- Empty

Class 2 Dry-dock:- CDS-10 Narden , Boerentange class, laid down July 1st, 3,379 tons received, incomplete and floated into dock Oct. 1st, 1935 for bulging and partial reconstruction (1,670 tons required) prior to continuing construction to 8,400 ton light final form, 3,000 tons added, 3,000 tons balance.

Rotterdam

Class 4 Slip :- Battleship Kortenaer laid down February 16, 1935, launching October 20th, 1936, Completing April 28th, 1939, total 42,068 tons, 7,781 tons committed, 500 tons added this quarter

Class 3 Slip :- Empty

Class 2 Slip :- Empty

Class 2 Dry-dock:- CDS-9 Boerentange , Boerentange class, laid down July 1st, 3,379 tons received, incomplete and floated into dock Oct. 1st, 1935 for bulging and major refit (845 tons required) prior to continuing construction to 8,403 ton final form, 100 tons added, 5,200 tons balance.


Vlissingen:

Class 3 Slip :- Empty

Class 2 Slip :- Empty

Class 1 Slip :- Empty


AT THE EAST INDIES:

Surabaia (Soerabaja Naval Base):

Class 4 Dry-dock:- DT 2, Hermaan class, puts in for Major refit October 1st, 1935, Completes on January 19th, 1936, 1278 tons required, 500 tons committed, 778 added this quarter, Complete
Dock clears February 3rdth, ML-1 Class vessel puts in for Major refit, 135tons added, launches Feb 20th, finish March 18th Complete
Dock clears Feb 27th, ML-1 Class vessel puts in for Major refit, 135tons added, launches March 16th, finishes April 12th
Dock clears March 23rd, ML-1 Class vessel puts in for Major refit, 135 tons added, launches April 10th, finishes May 7th

Class 0 slip : 1 x CMS constructed, 191 tons added, finishes afloat next quarter, Complete


Jakarta:
Class 0 slip : 1 x CMS constructed, 191 tons added, finishes afloat next quarter, Complete


Balikpapan Harbor:
Class 2 Dry-dock:- DT 3, Hermaan class, puts in for Major refit October 1st, 1935, Completes on January 19th, 1936, 1278 tons required, 500 tons committed, 778 added this quarter, Complete
Dock clears February 3rdth, ML-1 Class vessel puts in for Major refit, 135tons added, launches Feb 20th, finish March 18th Complete
Dock clears Feb 27th, ML-1 Class vessel puts in for Major refit, 135tons added, launches March 16th, finishes April 12th

Class 1 Dry-dock:- AT 2 Nicobar puts in for Major Refit (25%) and repairs (+5%) on October 1st, 1935, can complete on February 11th, 1936, 1,668 tons needed, 500 tons allocated, 1,168 added this quarter, Complete
Dock clears February 25th, ML-1 Class vessel puts in for Major refit, 135tons added, launch March 13th, finish April 9th
Dock clears March 20th, ML-1 Class vessel puts in for Major refit, 135tons added, finish May 3rd

Medan (Belawan harbor):
Class 2 Dry-dock:- DT 4, Hermaan class, puts in for Major refit October 1st, 1935, Completes on January 19th, 1936, 1278 tons required, 500 tons committed, 778 added this quarter, Complete
Dock clears February 3rdth, ML-1 Class vessel puts in for Major refit, 135tons added, launches Feb 20th, finish March 18th Complete
Dock clears Feb 27th, ML-1 Class vessel puts in for Major refit, 135tons added, launches March 16th, finishes April 12th

Class 1 Dry-dock:- AT 1 Andaman puts in for Major Refit (25%) and repairs (+5%) on October 1st, 1935, can complete on February 11th, 1936, 1,668 tons needed, 500 tons allocated, 1,168 added this quarter, Complete
Dock clears February 25th, ML-1 Class vessel puts in for Major refit, 135tons added, launch March 13th, finish April 9th
Dock clears March 20th, ML-1 Class vessel puts in for Major refit, 135tons added, finish May 3rd

Small craft construction

Rotterdam (Port) :

Jakarta (Port) : 24 x MAS 501 (24 x 22t = 528t) , 3 x PC Putten (3 x 74t = 222t)

Matabi, Kongo (Port) :

Paramaribo, Suriname (Port) :

=========================Ships afloat: ============================

Amsterdam

Den Helder

The Hague
Fleet Destroyer Z79, laid down February 16th, 1935, launching July 4thth, 1935, Completing January 27th, 1936, total 2,517 tons, 2,387 tons committed, 130 tons added this quarter Complete

O-6, of 0-5 Zwaardfish class, laid down April 2, 1935, Launching July 30, 1935, Completing January 26th , 1936, 999tons total, 909 tons committed, 90 tons added this quarter. Complete

Ijmuiden
Fleet Destroyer Z80, laid down February 16th, 1935, launching July 4thth, 1935, Completing January 27th, 1936, total 2,517 tons, 2,387 tons committed, 130 tons added this quarter Complete

Rotterdam
Fleet Destroyer Z77, laid down February 16th, 1935, launching July 4thth, 1935, Completing January 27th, 1936, total 2,517 tons, 2,387 tons committed, 130 tons added this quarter Complete

Vlissingen

O-7, of 0-5 Zwaardfish class, laid down April 2, 1935, Launching July 30, 1935, Completing January 26th , 1936, 999tons total, 909 tons committed, 90 tons added this quarter. Complete

Oost-Vlieland

Surabaia (Soerabaja)

Paramaribo

Matadi

Jakarta

Balikpapan
Fleet Destroyer Z78, laid down February 16th, 1935, launching July 4thth, 1935, Completing January 27th, 1936, total 2,517 tons, 2,387 tons committed, 130 tons added this quarter Complete


Medan

C. Ships on shakedown cruises:

1st Three Months
Training Battleship Molucca post repairs
K-35
K-36
Training Cruiser Witte de With
ML-1, ML-2

2nd Three Months

D. Transactions

Transfer 4 x CMS to the Kingdom of Siam
Transfer 12 x MAS 1000 to the Kingdom of Siam
Transfer 8 x Putten PC to the Kingdom of Siam

100t to Italy for MAS 501 plans

E. Other Notes

692 tons is allocated to coastal defense guns

214 ~ 2 batteries of 152mm (2 x 8 ) in emplacements at Ambon, Molucca islands, Malay archipelago
107 ~ 1 batteries of 152mm (1 x 8 ) in emplacements at Tjilatjap, Java island, Malay archipelago
107 ~ 1 batteries of 152mm (1 x 8 ) in emplacements at Seram, Java island on Sunda Strait, Malay archipelago
152 ~ 19 batteries of 40mm (19 x 8 ) in emplacements at Soerabaja Naval base, Java island, Malay archipelago
32 ~ 4 batteries of 40mm (4 x 8 ) in emplacements at Seram, Java island on Sunda Strait, Malay archipelago
80 ~ 10 batteries of 40mm (10 x 8 ) in emplacements at Tjilatjap, Java island, Malay archipelago

28 x 155mm removed from the Zeven Provincien Class in refit remain in storage.
Available in Q2 will be 28x 155mm and 8 x twin 280mm turrets from Ijelsijk class.
4x Palembang class, 3,875t light, finished scrapping Q1, 1935. Material recycled Q2,3, 1,157t/Q available Q4 1935, Q1.
2x Ijelsijk class, 21,178t light, finished scrapping Q3, 1935, Material recycled Q4, Q1, 3,176t/Q available Q2 1935, Q3

Post treaty:
The Dutch will provide Section K information to all remaining Cleito participants. Physical inspection of the work in progress to verify dimensions will also be offered during the first quarter of construction.

(1) Battleships of the Kortenaer class : est. 44,000 tons standard, 242m x 33m x 9.8m.
(2) Battlecruisers of the Erzatz Ijelsijk Class class : est. 25,000 tons standard, 170m x 31m x 9m
Coast Defense ships of the Boerentange class : est. 9,000 tons standard, 120m x 24m x 6.5m
Carriers of the Walchern class : est. 16,000 tons standard, 220m x 24.5m x 6.5m
Training cruiser Witte de With class: est. 3,000 tons standard, 120m x 13m x 4.8m
Fleet Destroyers of the Z77 class : est. 2,650 tons standard, 135m x 12.4m x 3.9m
Submarines of the 0-5 class : est 1,000 tons standard, 84m x 6.75m x 4m
Submarines of the K-35 class : est. 600 tons standard, 42m x 8m x 5.33m

(1) Final version differs slightly from that posted in ship design and encyclopedia
(2) Official classification, erroneous.

F. Updated Order of Battle-

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

CV: 3 (0) 1
BB: 5 (0) 2
BC: 2 (0) 4
CDS:1(0) 2
CA: 4 (0) 0
CL: 24 (0) 0
DDA: 16 (0) 0
DD(b) : 42 (0) 0
Fleet Submarine: 9 (0) 0
Coastal Submarine: 32 (0) 0

Unlimited:

Escorts: 85 (0) 0
Gunboats : 36 (0) 0
Patrol craft : 84 (0) 3
Coastal ASW : 14 (0) 0
MAS 1000: 154 (0) 0
MAS 501 : 0 (0) 24

Fleet Minelayers : 3 (12) 0
Fleet Minesweepers: 21 (0) 0
Coastal Minesweepers:38 (0) 2

Training ships : 6 (0) 0
Target ships : 4 (0) 0
Experimental : 3 (0) 0

Seaplane carrier : 2 (0) 0

Tender, Seaplane : 6 (0) 0
Tender, Destroyer : 4 (0) 0
Tender, Sub : 2 (0) 0

Troop Transports : 2 (0) 0
Landing craft : 4x BDA, 10x BDS

Yacht : 1 (0) 0

This post has been edited 4 times, last edit by "Kaiser Kirk" (Apr 28th 2008, 12:26am)


2

Monday, April 28th 2008, 12:16am

8) in = classified?

Kaiser Kirk

Lightbringer and former European Imperialist

  • Send private message

3

Monday, April 28th 2008, 12:20am

No, it means I put a "x 8 )" without the spaces, and so the dratted thing read it as a smiley face. Just had to fix the same thing on my master fortification list.