Danish Naval Developments Q1 1930
a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Dry Dock No.1 (Type 2) at Copenhagen extending to Type 3 receives 0.2 IP = Total 0.2 IP points, 0.8 IP points to complete
c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Kára, CL, laid down 02/01/30, receives 1,170 tons, balance 4,582 tons
No.2 type 2 slip – Gunnr, CL, laid down 02/04/29, receives 1,170 tons, balance 1,072 tons
No.3 type 1 slip – Carnation, SL, laid down 02/01/30, receives 349 tons, balance 835 tons
No.4 type 1 slip – Bluebell, , SL, laid down 02/01/30, receives 349 tons, balance 835 tons
No.1 type 2 drydock – EXTENDING
Dock side – Vali, BB, laid down 15/01/27, receives 921 tons to complete
Dock side – Idle
Aarhus-
No.1 type 3 slip – Róta, CL laid down 01/10/29, receives 1170, balance 3,412 tons
No.2 type 2 slip – Sigrdrifa, CL, laid down 02/01/29, receives 1072 tons to complete
No.3 type 1 slip – Lake (c), GB, laid down 02/01/1930, receives 283 tons, balance 133 tons
No.4 type 1 slip – Lake (d), GB, laid down 02/01/1930, receives 283 tons, balance 133 tons
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
Dock side – Tyr, BB, laid down 02/01/27, receives 921 tons to complete
Dock side – Idle
Aalborg-
No.1 type 1 slip – Tulip, SL, laid down 01/10/29, receives 349 tons, balance 486 tons
No.2 type 1 slip – Daffodil, SL, laid down 01/10/29, receives 349 tons, balance 486 tons
No.3 type 1 slip – Myre, MWS, laid down 02/01/1930, receives 245 tons, balance 555 tons
No.4 type 1 slip - Bi, MWS, laid down 02/01/1930, receives 245 tons, balance 555 tons
Dock side – Violet, SL, laid down 02/01/29, receives 137 tons to complete
Dock side – Daisy, SL, laid down 02/01/29, receives 137 tons to complete
Bangkok-
No.1 type 1 slip – Marigold, SL, laid down 02/01/30, receives 349 tons, balance 835 tons
No.2 type 0 slip – Lake (a), GB, laid down 02/01/1930, receives 283 tons, balance 133 tons
No.3 type 0 slip – Lake (b), GB, laid down 02/01/1930, receives 283 tons, balance 133 tons
No.1 type 2 drydock –Idle
Dock side – Idle
d/ Transactions
None
e/ Other Notes
KDM Brynhildr continues sea trials until 28/04/1930
KDM Rose continues sea trials until 02/05/1930
KDM Lily continues sea trials until 02/05/1930
KDM Violet continues sea trials until 02/05/1930
KDM Daisy continues sea trials until 02/05/1930
KDM Tyr commences se trials on 27/01/1930
KDM Vali commences sea trials on 09/02/1930
KDM Sigrdrifa commences sea trials 20/03/1930
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 157 tons
f/ Order of Battle
Note:
Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 01 (0) + 2/0 (0)
AC = 00 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 0/0 (0)
CL = 12 (0) + 5/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 26 (0) + 0/0 (0)
SL = 03 (0) + 9/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 13 (0) + 4/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 07 (0) + 2/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)