Report for Q4/1945
Industrial Allocation
- 25.5 / 27.5 factories producing 25,500t materials.
- 2/27.5 factories producing infrastructure
- 334t from stockpile.
- 2,379t from transactions.
- 5158t from scrapping.
- 33,371t materials total.
- 30,964t used.
- 2407t stored for Q1/46.
Infrastructure Development
Two factories dedicated to infrastructure. 0.2 IP + 0.2 bonus IP added to lengthen Type 1 drydock in Nouvelle-Calédonie.
Naval Construction
Arsenal de La Rochelle (Cl 5)
Class 4.5 Slip #1 - Aircraft carrier Foudroyant laid down January 1st, 1945. 38,800 tons required. 2000 tons added in Q4/1945 for a total of 8000 / 38800 tons. 30800 / 38800 tons remaining. Launched September 18th, 1946. Completed December 25th, 1948.
Class 4 Slip #1 - Idle
Class 3 Slip #1 - Contre-Torpillieur de Sercey (Forbin class) laid down September 1st, 1945. 2,500 tons required. 625 tons added in Q4/1945 for a total of 835 / 2500 tons. 1665 / 2500 tons remaining. Launched January 19th, 1946. Completed August 15th, 1946.
Class 3 Slip #2 - Idle.
Class 3 Slip #3 - Idle.
Class 3 Slip #4 - Heavy cruiser Saint Louis laid down January 1st, 1945. 13,850 tons required. 3000 tons added in Q4/1945 for a total of 5575 / 13850 tons. 8275 / 13850 tons remaining. Launched December, 1945. Completed November 30th, 1946.
Class 2 Slip #1 - Contre-Torpillieur Tartu (Forbin class) laid down July 1st, 1945. 2,500 tons required. 625 tons added in Q4/1945 for a total of 1250 / 2500 tons. 12505 / 2500 tons remaining. Launched November 19th, 1945. Completed June 15th, 1946.
Class 2 Slip #2 - Contre-Torpillieur Allemand (Forbin class) laid down November 1st, 1945. 2,500 tons required. 625 tons added in Q4/1945 for a total of 625 / 2500 tons. 1875 / 2500 tons remaining. Launched March 19th, 1946. Completed March 15th, 1946.
Class 1 Slip #1 - Escorteur rapide Le Corse laid down July 1st, 1945. 1,185 tons required. 350 tons added in Q4/1945 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched November 3rd, 1945. Completed May 6th, 1945.
Class 1 Slip #2 - Escorteur rapide Le Calaisien laid down July 1st, 1945. 1,185 tons required. 350 tons added in Q4/1945 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched November 3rd, 1945. Completed May 6th, 1945.
Class 1 Slip #3 - Escorteur rapide Le Basque laid down July 1st, 1945. 1,185 tons required. 350 tons added in Q4/1945 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched November 3rd, 1945. Completed May 6th, 1945.
Class 1 Slip #4 - Escorteur rapide Le Dijonnais laid down July 1st, 1945. 1,185 tons required. 350 tons added in Q4/1945 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched November 3rd, 1945. Completed May 6th, 1945.
Class 0 Slip #1 - Idle.
Class 0 Slip #2 - Idle.
Class 0 Slip #3 - Idle.
Class 0 Slip #4 - Idle.
Dockside:
- Export Battleship Tapae laid down for Romania January 1st, 1943. 34,448 tons required. 2,379 tons added in Q4/1945 for a total of 28549 / 34448 tons. 5900 / 34448 tons remaining. Launched June, 1944. Completion planned for September 9th, 1946.
- Contre-Torpillieur L'Implacable (Forbin class) laid down November 1st, 1944. 2,500 tons required. 0 tons added in Q4/1945 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched March 19th, 1945. Completed October 15th, 1945.
- Contre-Torpillieur Maillé-Brézé (Forbin class) laid down January 1st, 1945. 2,500 tons required. 625 tons added in Q4/1945 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched May 19th, 1945. Completed December 15th, 1945.
- Contre-Torpillieur Jurien (Forbin class) laid down May 1st, 1945. 2,500 tons required. 625 tons added in Q4/1945 for a total of 1875 / 2500 tons. 625 / 2500 tons remaining. Launched September 19th, 1945. Completed April 15th, 1946.
- Escorteur rapide Le Picard laid down January 1st, 1945. 1,185 tons required. 135 tons added in Q4/1945 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched May 3rd, 1945. Completed November 6th, 1945.
- Escorteur rapide L'Alsacien laid down January 1st, 1945. 1,185 tons required. 135 tons added in Q4/1945 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched May 3rd, 1945. Completed November 6th, 1945.
- Escorteur rapide Le Audois laid down January 1st, 1945. 1,185 tons required. 135 tons added in Q4/1945 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched May 3rd, 1945. Completed November 6th, 1945.
- Escorteur rapide Le Brestois laid down January 1st, 1945. 1,185 tons required. 135 tons added in Q4/1945 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched May 3rd, 1945. Completed November 6th, 1945.
- Submarine Emeraude (Emeraude class) laid down January 1st, 1945. 1750 tons required. 0 tons added in Q4/1945 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched May 9th, 1945. Completed November 23rd, 1945.
- Submarine Opale (Emeraude class) laid down January 1st, 1945. 1750 tons required. 0 tons added in Q4/1945 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched May 9th, 1945. Completed November 23rd, 1945.
DCNS Brest (Cl 5)
Class 3 Drydock #1 - Idle.
Class 2 Drydock #1 - Submarine Grenat (Emeraude class) laid down July 1st, 1945. 1750 tons required. 600 tons added in Q4/1945 for a total of 1200 / 1750 tons. 550 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
Class 1 Drydock #1 - Submarine Agate (Emeraude class) laid down July 1st, 1945. 1750 tons required. 600 tons added in Q4/1945 for a total of 1200 / 1750 tons. 550 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
Class 0 Drydock #1 - Idle.
Dockside:
- Merchant tanker Messidor converting to naval auxiliary. 260 tons added Q4/1945. 260 / 260 tons added. Conversion complete.
- Merchant tanker Aube converting to naval auxiliary. 1451 tons required. 1451 tons added Q4/1945. 0 / 1451 tons remaining. Conversion complete.
- Merchant tanker Essone converting to naval auxiliary. 1451 tons required. 1451 tons added Q4/1945. 0 / 1451 tons remaining. Conversion complete.
- Submarine Rubis (Emeraude class) laid down January 1st, 1945. 1750 tons required. 0 tons added in Q4/1945 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched May 9th, 1945. Completed November 23rd, 1945.
- Submarine Saphir (Emeraude class) laid down January 1st, 1945. 1750 tons required. 0 tons added in Q4/1945 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched May 9th, 1945. Completed November 23rd, 1945.
Société Nouvelle des Forges et Chantiers de la Méditerranée, Marseilles (Cl 5)
Class 4.5 Drydock #1 - Aircraft carrier Formidable laid down October 1st, 1945. 38,800 tons required. 3000 tons added in Q4/1945 for a total of 3000 / 38800 tons. 35800 / 38800 tons remaining. Launched June 18th, 1947. Completed September 25th, 1949.
Class 3 Slip #1 - Submarine Améthyste (Emeraude class) laid down July 1st, 1945. 1750 tons required. 600 tons added in Q3/1945 for a total of 600 / 1750 tons. 1150 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
Class 3 Slip #2 - Submarine Jaspe (Emeraude class) laid down July 1st, 1945. 1750 tons required. 600 tons added in Q3/1945 for a total of 600 / 1750 tons. 1150 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
Class 2 Drydock #1 - Idle.
Class 1 Slip #1 - Submarine Obsidienne (Emeraude class) laid down July 1st, 1945. 1750 tons required. 600 tons added in Q4/1945 for a total of 1200 / 1750 tons. 550 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
Class 1 Slip #2 - Submarine Perle (Emeraude class) laid down July 1st, 1945. 1750 tons required. 600 tons added in Q4/1945 for a total of 1200 / 1750 tons. 550 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Dockside:
- Aircraft Carrier Zélé laid down January 1st, 1944. 14,550 tons required. 2550 tons added in Q4/1945 for a total of 14550 / 14550 tons. 0 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
- Aircraft Carrier Héros laid down January 1st, 1944. 14,550 tons required. 2550 tons added in Q4/1945 for a total of 14550 / 14550 tons. 0 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
- Battleship Richelieu undergoing major refit beginning July 1st 1945. 8577 tons required. 2400 tons added Q4/1945 for a total of 4800 / 8577 tons. 3777 / 8577 tons remaining until completion. Refit finishes June 1st 1946. No drydock time required.
- Submarine Topase (Emeraude class) laid down January 1st, 1945. 1750 tons required. 0 tons added in Q4/1945 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched May 9th, 1945. Completed November 23rd, 1945.
- Submarine Turquoise (Emeraude class) laid down January 1st, 1945. 1750 tons required. 0 tons added in Q4/1945 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched May 9th, 1945. Completed November 23rd, 1945.
Arsenal de Cayenne (Cl 5)
Class 3 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Dockside:
N/A
Arsenal de Abidjan (Cl 5)
Class 3 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Arsenal de Oran (Cl 5)
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Dockside:
N/A
Arsenal de Tunis (Cl 5)
Class 4 Drydock #1 - Idle.
Class 3 Slip #1 - Idle.
Class 1 drydock #1 - Idle.
Dockside:
N/A
Arsenal de Beiruit (Cl 5)
Class 3 Drydock #1 - Idle.
Dockside:
N/A
Arsenal de Djibouti (Cl 2)
Class 2 Drydock #1 - Idle.
Class 1 Drydock - Idle.
Class 1 Drydock #1 - Idle.
Dockside:
- None
Base Navale, Dakar
Class 1 Floating Drydock #1 - Idle.
Forges et Chantiers de Indochine, Saigon (Cl 5)
Class 4 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Class 0 Slip #1 - Subchaser Qhi Nhan (Cam Ranh class) laid down October 1st, 1945. 125 tons required. 125 tons added in Q4/1945 for a total of 125 / 125 tons. 0 / 0 tons remaining. Launched complete October 31st, 1945.
Class 0 Slip #2 - Idle.
Dockside:
- N/A
Forges et Chantiers de Indochine, Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle.
Forges et Chantiers de Nouvelle-Calédonie (Cl 5)
Class 4 Drydock #1 - Idle.
Class 2 Drydock #1 - Idle.
Class 1 Drydock #1 - Expanding to Type 1.5 drydock. 0.5 IP of 0.5 IP added. 0.0 IP remain.
Class 0 Drydock #1 - Idle.
Class 1 Slip #1 - Idle.
Class 0 Slip #1 - Aviso Kabyle (Arabe class) laid down July 1st, 1945. 634 tons required. 190 tons added in Q4/1945 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched November 27th, 1945. Completed April 19th, 1945.
Class 0 Slip #2 - Aviso Marocain (Arabe class) laid down July 1st, 1945. 634 tons required. 190 tons added in Q4/1945 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched November 27th, 1945. Completed April 19th, 1945.
Class 0 Slip #3 - Idle.
Dockside:
- Aviso Bambara (Arabe class) laid down January 1st, 1945. 634 tons required. 64 tons added in Q4/1945 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched May 27th, 1945. Completed October 19th, 1945.
- Aviso Tuy Dong (Arabe class) laid down January 1st, 1945. 634 tons required. 64 tons added in Q4/1945 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched May 27th, 1945. Completed October 19th, 1945.
At Papeete (Cl 3)
Class 3.5 Drydock - Idle.
Dockside:
- None
On Trials:
Many, many things.
From Factories
- N/A
Transactions
- 2,379 tons from Romania for Export Battleship (construction costs).
Other Notes
None
Ships being scrapped
No ships being scrapped this quarter.
- Total tonnage in recycling until Q4/1945: (2x626) + (4x616) + (8x172) + (1x66) = 5158
- Total tonnage in recycling until Q1/1946: (2x418) + (4x513) + (1x66) = 2954
Updated Order of Battle, End of Q3/1945
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping
The Fleet
Battleships: 7(0)+1
Battlecruisers: 4(0)+0
Aircraft Carriers: 13(0)+2
Heavy Cruisers: 9(0)+1
Light Cruisers: 26(0)+0
Coast Defense Ships: 1(0)+0
Destroyers: 89(0)+6
Frigates: 4(0)+0
Corvettes: 10(0)+0
Escorteurs Rapides: 16(0)+0
Avisos: 14(0)+3
Fleet Submarines: 32(0)+6
Coastal Submarines: 55(0)+0
Motor Torpedo Boats: 38(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Submarine Chasers: 100(0)+0
Light Patrol Boats: 8(0)+0
River Gunboats: 34(0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0
Fleet Train
Replenishment Ships: 16(0)+0
Light Oiler Tankers: 7(0)+0
Gasoline Tankers: 3(0)+0
Oil Transport Tankers: 9(0)+0
Fleet Tenders: 4(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 2(0)+0
Light Repair Ships: 4(0)+0
Ammunition Ships: 2(0)+0
Transports: 8(0)+0
Aircraft Transports: 2(0)+0
Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 12(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 0(0)+0
Research Ship: 5(0)+0
Research Submarine: 1(0)+0
Amphibious Forces:
Dock Landing Ship: 2(0)+0
Vehicle Landing Ship: 4(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 10(0)+0
Infantry Landing Craft Large (EDA-L): 6(0)+0
Tank Landing Craft (EDA): 17(0)+0
Infantry Assault Craft Small (EA): 33(0)+0
Minor Craft:
Bateau de Service: 72(0)+0
Patrouilleur de Port: 54(0)+0
Hydroglisseurs: 32(0)+0
Patrouille Navale Indochinoise:
Frigates: 1(0)+0
Avisos: 4(0)+0
Minesweepers: 16(0)+0
Survey Craft: 1(0)+0
Civil Support Ships: 1(0)+0
Tank Landing Craft (EDA): 8(0)+0
Infantry Assault Craft (EA): 8(0)+0
Submarine Chasers: 54(0)+0
Motor Torpedo Boats: 4(0)+0
Vedettes: 24(0)+0
Light Patrol Boats: 4(0)+0
Bateau de Service: 12(0)+0
Patrouilleur de Port: 4(0)+0