You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, April 28th 2006, 2:17am

Siam, Quarter 4, 1930

Siamese Naval Developments Q4 1930

a/ Industrial Allocation
0/1 factories producing materiel for shipbuilding = 0 tons
1/1 factories (fixed) producing infrastructure materiel = 0.1 points

b/ Infrastructure Development
No.1 type 0 drydock, Phuket, receives 0.1 point balance 0.8 points

c/ Naval Construction
Bangkok-
No.1 type 1 drydock –
Patrol boat, “Witchaya Riddhidej”, laid down 02/07/1930, receives 144 tons to complete
No.2 type 1 drydock -
Patrol boat, “Porntep Bunraksa”, laid down 02/07/1930, receives 144 tons to complete

d/ Transactions
None

e/ Other Notes
RTNS Pacheun Trongsawasdi commissions on 06/10/1930
RTNS Witchaya Riddhidej commences sea trials on 05/12/1930
RTNS Porntep Bunraksa commences sea trials on 05/12/1930

Tonnage Carried Over From This Quarter = 640

f/ Order of Battle
Note: X(Y)+Z = completed (under repair/refit) + building/on order

CDS = 02 (0) + 0/0
DD = 01 (0) + 0/0
GB = 03 (0) + 0/0
PB = 02 (0) + 2/0
MTB = 04 (0) + 0/0
Royal = 01 (0) + 0/0