Marina de Filipinas
1927 Second Quarter Report
1 April-30 June
A. Factories
9/11 factories = 9,000t of material + 11t stockpiled = 9,011t available
8947t are used, and 0t transferred, leaving a stockpile of 64t.
(1373t transferred
in placed directly to contract work)
2/11 factories (committed) = 0.2 infrastructure pts +
0/11 factories (flexible) = 0.0 pts = 0.2 pts available
B. Infrastructure Development
Continued upgrade of Type 3 drydock at Butuan to Type 4
0.2 points alotted = 0.6 total/1 needed = 0.4 needed to complete
Continued construction of Type 1 port at Itu Aba
0.0 points alotted = 0.6 total/3.0 needed = 2.4 needed to complete
C. Naval Development and Construction
at Manila:
S4: BC
Bohol receives 2093t, balance 16544t, completes 25 May 29
S3: idle
S1: idle
D2: idle
D1: idle
Dockside: BC
Samal receives 2000t, balance 5305t, completes 6 Mar 28
Dockside: DD
Cigüeña receives 128t, commissioned 10 May
Dockside: CL
Durnaran launched 17 May; receives 995t, balance 764t, completes 10 Dec
Dockside: PD
Manila receives eight 13.7mm MG = 1t
at Butuan:
S2: idle
S1: idle
S0: idle
S0: idle
S0: YT
Aklan laid down 1 Apr; receives 117t, balance 40t, completes 6 Aug
S0: YT
Sorsogon laid down 1 Apr; receives 117t, balance 40t, completes 6 Aug
D3: *upgrading*
Dockside: CDS
Tacloban receives 659t, commissioned 19 May
Dockside: YT
Cadiz launched 1 Apr; receives 43t, commissioned 6 May
Dockside: YT
Antique launched 1 Apr; receives 43t, commissioned 6 May
Dockside: DD
Milano launched 8 May; receives 371t, balance 526t, completes 10 Nov
Dockside: CL
Culion launched 17 May; receives 995t, balance 764t, completes 10 Dec
at San Fernando:
S2: DD
Halcón laid down 1 Apr; receives 371t, balance 897t, completes 10 Feb 28
D1: idle
D0: Water tanker
Apayao laid down 1 Apr; receives 147t, balance 58t, completes 8 Aug
Dockside: Peruvian CDS
Lima receives 1373t, balance 2102t, completes 20 Nov
Dockside: 2 x
Abejorro-class PB rearmed = 6 tons
at Puerto Princesa:
S1: GB
La Union laid down 1 Apr; receives 330t, balance 187t, completes 18 Aug
Dockside: Training ship
Magellan receives 330t, balance 170t, completes 18 Aug
Commericial shipyards:
PB
Tábano constructed - 131 tons
D. Transactions
1373 tons of material received from Peru to construct CDBB
Lima
E. Other Notes
CE Palawan destroyed by magazine explosion.
Constructed one triple 155mm turret for coast defenses = 70t
Ships laid down this quarter: one destroyer, one gunboat, two tugboats, one patrol boat and one water tanker
DD
Cerceta, GB
Mindoro,
Antarctica, SC
Golfo complete shakedown
cruises
BB
San Pablo continues shakedown cruise
CDS
Tacloban, DD
Cigüeña, PB
Tábano, tugs
Cadiz,
Antique begins shakedown cruises
F. Scrappage Report
Stockpiled Guns
in turrets: 1 2x6" Mk 12
singles: 8 x 6" Mk VI, 16 x 3" Mk VI
G. Updated Order of Battle, 30 June 1927
Note:
Y)+Z = completed (under repair/refit) + under construction
-Combat Force-
Second class battleships 3(0)+0
Coast defense battleships 2(0)+0
Battlecruisers 1(0)+2
Second class cruisers 3(0)+2 (+2 awaiting delivery from Germany)
Escort cruisers 2(0)+0
Destroyers 10(0)+2
Destroyer escorts 7(0)+0
Subchasers 12(0)+0
Submarines 1(0)+0
Torpedo boats 3(0)+0
Fast torpedo craft 40(0)+0
Gunboats 8(0)+1
Patrol boats 2(0)+0
Fisheries patrol boats 1(0)+0
Assault transports 1(0)+0
Minelayers 3(0)+0
Minesweepers (coastal) 15(0)+0
-Support Force-
Transports 1(0)+0
Training ships 0(0)+1
Harbour Tugs 2(0)+2
Oilers 1(0)+0
Water tankers 0(0)+1
------------