You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, April 12th 2004, 5:07pm

Houkokusho Taisho 9 Nen 12 Getsu 31 Nichi

(Well, I certainly hope I made no errors in this report (fat chance). When It was almost finished, I forgot that I had to add 5 more ships to the building program. Originally I shifted the whole lot, but In the end I decided to fill up everything I had and take the tonnages needed from the Zuiho and Shoho. Also, I f**ked up a few of the earlier reports so that the calculations for the tonnages (which are correct) needed to construct the Zuiho and Shoho no longer matched the reports (which I messed up))

========================================

Fourth Quarter of Ninth year of the Emperor Taisho report of Japan.

Submitted by Nakamura Shoda to the Shogun. Taisho 9 Nen 12 Getsu 30 Nichi

Tokugawa-dono,

Attached is a list of the 4th quarter of the Ninth year of the Reign of Emperor Taisho.
The budget of the Imperial Navy for this year was 5.5 billion yen. We went over the limit by 620 million. I shuffled the funds a bit so that we could still finance the ships (after all, I am good at that and that is why you have assigned me to this job).

Your loyal servant and secretary,
Nakamura Shoda

======================================

Factory assignment:

Of the 26 factories available to the empire, Factories I to XII are used for the infrastructure (fixed for the year. Note: Factory XIII was released for warship materials during the 2nd quarter) for 1.2 +1.2 = 2.4 points in the quarter. Factories XIII to XXVI are assigned to produce materials to be used in the warships for a total of 14000 tons in the quarter.

Transactions

No transactions at the moment.

Infrastructure construction:

The infrastructure points are used in the construction on Factory XXVII (3.6 points at end of 4th quarter).

Warships:

I) Ships already under construction.

Thirty-two vessels were under construction on October 1, 1922. The carriers Zuiho (ex Kaga) and Shoho (ex Tosa), the Light Cruiser Kameko-chan, the Gunboats G-II-1 and G-II-2, and 3rd class Destroyers Machi, Kyo, Lele-Sha, Andoromeda, Spallituda, Achilles, Icarus, Teata, Karakaline, Euphrosyne, Kale, Pasithea, Aglaia, Thalia, Auxo, Alecto, Megaera, Tisiphone, Upandlah, Atropos, Lachesis, Clotho, Ladios Sopp, Voards Viewlard, Potar, Philetto, Shearasuta, Ahurochuun, Sorutiaru, Kurappu, Parusuetto, Esu-Esu-Eru, Beruda, Turanshu, Meiran, Kurikkaku, Teku, Esuto, Syucha and Paracha.


October 1, 1922 status
Zuiho: 31.5 months, 24,570 tons. 2280 tons used this quarter.
Shoho: 26.5 months 20,890 tons. 2445 tons used this quarter.
Kameko-chan: 15 months, 7,117 tons, 653 tons used this quarter.
Machi: 9 months, 522 tons, 59 tons used this quarter.
Kyo: 9 months, 522 tons, 59 tons used this quarter.
Rere-Sha: 9 months, 522 tons, 59 tons used this quarter.
Andoromedaa: 9 months, 522 tons, 59 tons used this quarter.
Suparichuuta: 9 months, 522 tons, 59 tons used this quarter.
Akiresu: 9 months, 522 tons, 59 tons used this quarter.
Ikarosu: 9 months, 522 tons, 59 tons used this quarter.
Tiita: 9 months, 522 tons, 59 tons used this quarter.
Kurakarain: 9 months, 522 tons, 59 tons used this quarter.
Efuroshuune: 9 months, 522 tons, 59 tons used this quarter.
Kare: 9 months, 522 tons, 59 tons used this quarter.
Pashitea: 9 months, 522 tons, 59 tons used this quarter.
Aguraia: 9 months, 522 tons, 59 tons used this quarter.
Tairea: 9 months, 522 tons, 59 tons used this quarter.
Aukusoo: 9 months, 522 tons, 59 tons used this quarter.
Arekutoo: 9 months, 522 tons, 59 tons used this quarter.
Megaera: 9 months, 522 tons, 59 tons used this quarter.
Teisuhoon: 9 months, 522 tons, 59 tons used this quarter.
Yuupandara: 9 months, 522 tons, 59 tons used this quarter.
Atorobosu: 9 months, 522 tons, 59 tons used this quarter.
Rakishisu: 9 months, 522 tons, 59 tons used this quarter.
Kuroosoo: 9 months, 523 tons, 58 tons used this quarter.
Ladios Sopp: 4 month, 232 tons, 174 tons used this quarter.
Voards Viewlard: 4 month, 232 tons, 174 tons used this quarter.
Potaru: 4 month, 232 tons, 174 tons used this quarter.
Firetto: 4 month, 232 tons, 174 tons used this quarter.
G-II-1: 4 month, 818 tons, 443 tons used this quarter.
G-II-2: 4 month, 817 tons, 444 tons used this quarter.
Shearasuta: 3 months, 174 tons, 174, 174 tons used this quarter.
Ahurochuun: 3 months, 174 tons, 174, 174 tons used this quarter.
Sorutiaru: 3 months, 174 tons, 174, 174 tons used this quarter.
Kurappu: 3 months, 174 tons, 174, 174 tons used this quarter.
Parusuetto: 3 months, 174 tons, 174, 174 tons used this quarter.
Esu-Esu-Eru: 3 months, 174 tons, 174, 174 tons used this quarter.
Beruda: 3 months, 174 tons, 174, 174 tons used this quarter.
Turanshu: 3 months, 174 tons, 174, 174 tons used this quarter.
Meiran: 3 months, 174 tons, 174, 174 tons used this quarter.
Kurikkaku: 3 months, 174 tons, 174, 174 tons used this quarter.
Teku: 3 months, 174 tons, 174, 174 tons used this quarter.
Esuto: 3 months, 174 tons, 174, 174 tons used this quarter.
Syucha: 3 months, 174 tons, 174, 174 tons used this quarter.
Paracha: 3 months, 174 tons, 174, 174 tons used this quarter.

II) Ships started in the third quarter.

The 3rd class destroyers Ulicul (NBF-XVII), Elma (NBF-XVIII), Ananda (NBF-XIX), Linsa (NBF-XX), Salome (SBF-XXI), Concord (NBF-XXII), Puula (NBF-XXIII), Ochestro (NBF-XXIV), Wilma (NBF-XXV), Build (NBF-XXVI), Elala (NBF-XXVII) of the FSS: F class were laid down on 10/1/1922. Each ship requires 581 tons and 10 months construction time. It is expected that they will be launched Early February 1923 and will be ready Late July 1923.
The 3rd class destroyers Melcorr Litra, King Lader VIII Emperor Colus III and Empress Elmelah Colus of the FSS: OC class were laid down on 10/2/1922.
The 3rd class destroyers Queen Lizard Meistner of the FSS: OC class was laid down on 11/1/1922
Amaterasu-no-Mikoto, Amaterasu-no-Mikado, Mission Rouath, Lord Ballanka, Queen ÁËÌÅÁÉÏÓ, Roados Dragoon, Decors Weissmel, Grard Sydmian, Dr. Chrome Ballanche, Dr. Prisen Corks, Dr. Morard Carbyte, Dr. Steel Koop, Aisha Codante, Landwand Spacorn, Falk U. Rogner, Lie Ex, Spector, Dr. Dippa Dorpos, Hind Kill, and Leopard Crytharis of the FSS: OC class were laid down on 11/15/1922.
Each ship requires 573 tons and 10 months construction time. It is expected that they will be launched Early February (Group I), Early March (Group II) and Late March (Group III) and will be ready Late July (Group I) Late August (Group II) and Early September (Group III) 1923.

III) Status of ships under construction at the end of the first quarter.
Of the 14,000 tons, the Zuiho will receive 3x500 = 1500 tons, the Shoho will receive 2x500 and 1x485 = 1485 tons, and Kameko-chan will receive 1x653 = 653 tons. Machi, Kyo, Rere-Sha, Andoromedaa, Suparichuuta, Akiresu, Ikarosu, Tiita, Kurakarain, Efuroshuune, Kare, Pashitea, Aguraia, Tairea, Aukusoo, Arekutoo, Megaera, Teisuhoon, Yuupandara, Atorobosu, and Rakishisu will each receive 1x59 = 59 tons. Kuroosoo will receive 1x58 = 58 tons. G-II-1 will receive 2x145 and 1x153 = 443 tons and G-II-2 will receive 2x145 and 1x154 = 444 tons. Ladios Sopp, Voards Viewlard, Potaru, Firetto, Shearasuta, Ahurochuun, Sorutiaru, Kurappu, Parusuetto, Esu-Esu-Eru, Beruda, Turanshu, Meiran, Kurikkaku, Teku, Esuto, Syucha, Paracha, Ulicul, Elma, Ananda, Linsa, Salome, Concord, Puula, Ochestro, Wilma, Build, Elala, Melcorr Litra, King Lader VIII, Emperor Colus III and Empress Elmelah Colus will each receive 3x58 = 174 tons., Queen Lizard Meistner, Amaterasu-no-Mikoto, Amaterasu-no-Mikado, Mission Rouath, Lord Ballanka, Queen ÁËÌÅÁÉÏÓ, Roados Dragoon, Decors Weissmel, Grard Sydmian, Dr. Chrome Ballanche, Dr. Prisen Corks, Dr. Morard Carbyte, Dr. Steel Koop, Aisha Codante, Landwand Spacorn, Falk U. Rogner, Lie Ex, Spector, Dr. Dippa Dorpos, Hind Kill, and Leopard Crytharis will each receive 2x58 = 116 tons.

Zuiho at 80%. Still requires 6,520 tons and 8.75 months.
Shoho at 73%. Still requires 8,265 tons and 10.25 months.
G II-1 at 74%. Still needs 453 tons and 2 months
G II-2 at 74%. Still need 453 tons and 2 months
Ladios Sopp and Voards Viewlard at 71 %. Still need 167 tons and 3 month
Potaru and Firetto at 70%. Still need 175 tons and 3 months
Shearasuta, Ahurochuun, Sorutiaru, Kurappu, Parusuetto, Esu-Esu-Eru, Beruda, Turanshu, Meiran, Kurikkaku, Teku, Esuto, Syucha, and Paracha at 60%. Still need 233 tons and 4 months.
Ulicul, Elma, Ananda, Linsa, Salome, Concord, Puula, Ochestro, Wilma, Build, Elala at 30%. Still need 407 tons and 7 months
Melcorr Litra, King Lader VIII, Emperor Colus III and Empress Elmelah Colus at 30%. Still need 399 tons and 7 months
Queen Lizard Meistner at 20%. Still needs 457 tons and 8 months
Amaterasu-no-Mikoto, Amaterasu-no-Mikado, Mission Rouath, Lord Ballanka, Queen ÁËÌÅÁÉÏÓ, Roados Dragoon, Decors Weissmel, Grard Sydmian, Dr. Chrome Ballanche, Dr. Prisen Corks, Dr. Morard Carbyte, Dr. Steel Koop, Aisha Codante, Landwand Spacorn, Falk U. Rogner, Lie Ex, Spector, Dr. Dippa Dorpos, Hind Kill, and Leopard Crytharis at 20%. Still need 457 tons and 8.5 months

IV) Finished ships
The 3rd Class Destroyers Machi, Kyo, Rere-Sha, Andoromedaa, Suparichuuta, Akiresu, Ikarosu, Tiita, Kurakarain, Efuroshuune, Kare, Pashitea, Aguraia, Tairea, Aukusoo, Arekutoo, Megaera, Teisuhoon, Yuupandara, Atorobosu, Rakishisu, and Kuroosoo were competed on October 30. They set sail on November 4 for their shakedown cruise.
The Light Cruiser Kameko-chan was completed on November 28. She set sail on December 5 for her shakedown cruise.

V) Planned projects.
Kii class Battleships. Unknown number of hulls. Data still unknown at this point. Unnamed class Heavy cruiser. Unknown number of hulls. Data still unknown at this point.

Current fleet:
At the end of the 4th Quarter
Limited warships:
- Battleships (6): 4 Fuso class and 2 Nagato class active. None under construction.
- Carriers (1+2): 1 Hosho class active. 2 Zuiho class under construction.
- Heavy/Armored Cruisers (8+0): 4 Asama and 4 Jakumo class active. None under construction.
- Light Cruisers (13+1): 2 Tenryu class, 5 Kuma class, and 6 Nagara class and Kameko-chan active. None under construction.
- 1st Class Destroyers (0+0): None active. None under construction.
- 2nd Class Destroyers (22+0): 13 Minekaze class and 9 Kamikaze class active. None under construction.
- CDS (3+0): 3 Atsusa class active. None under construction.
- Submarines (7+0): 2 Ie Ichi class and 5 Ie Ni class active. None under construction.
Atsusa, Zansho and Asasamu finished shakedown cruise on December 7.
Kameko-chan started shakedown cruise on December 5.

Unlimited warships:
Sloops (0): None active..
Gunboats (24+2): 24 Go-ichi class active. 2 Go-ni class under construction.
Minelayer (27): 27 Ri-ichi class active.
Minesweeper (18): 18 Mu-ichi class active.
Small submarine chaser (42): 42 Shi-ichi class active.
Destroyer class 3 (81+54): 45 Ki-ichi class and 36 FSS: F class active. 27 FSS:F class and 27 FSS: OC class under construction.
Corvette (30): 30 Fu-ichi class active.
Large submarine chaser (30): 30 Ao-ichi class active.
Kuun, Paruteno, Majeru, Chandana, Niimu, Ietta, Odetto, Aarora, Jiseru, Bakusuchuaru, Dai-mon, Vitta-Shasse, and Toki finished shakedown cruise on December 15.
Shizu on shakedown cruise.
Machi, Kyo, Rere-Sha, Andoromedaa, Suparichuuta, Akiresu, Ikarosu, Tiita, Kurakarain, Efuroshuune, Kare, Pashitea, Aguraia, Tairea, Aukusoo, Arekutoo, Megaera, Teisuhoon, Yuupandara, Atorobosu, Rakishisu, and Kuroosoo started shakedown cruise on November 4.

Construction/Repair activity:

I) Construction on Slips/in Docks at:
Kure Navy Yard, Kure (Honshu)
Slip V-1A => Kurappu under construction and launched (Oct 31). Lord Ballanka laid down and under construction (Nov 15).
Slip I-1A => Urikuru laid down and under construction.
Dock V-1A => Emperor Colus III laid down and under construction.
Yokosuka Navy Yard, Yokosuka (Honshu)
Slip V-2A => Parusuetto under construction and launched (Oct 30). Queen ÁËÌÅÁÉÏÓ laid down and under construction (Nov 15).
Slip I-2A => Eruma laid down and under construction.
Kawasaki Co, Kobe (Honshu)
Slip V-3A => Esu-Esu-Eru under construction and launched (Oct 30). Roados Dragoon laid down and under construction (Nov 15).
Slip II-3A => Paracha under construction and launched (Oct 30). Aisha Codante laid down and under construction (Nov 15).
Dock II-3A => King Lader VIII laid down and under construction.
Mitsubushi Co, Nagasaki (Kyushu)
Slip V-4A => Beruda under construction and launched (Oct 30). Amaterasu-no-Mikoto laid down and under construction (Nov 15).
Slip II-4A => Shearasuta under construction and launched (Oct 30). Landwand Spacorn laid down and under construction (Nov 15).
Dock II-4A => Puura Laid down and under construction.
Fukuoka Navy Yard, Fukuoka (Kyushu)
Slip III-5A => Turanshu under construction and launched (Oct 30). Decors Weissmel laid down and under construction (Nov 15).
Slip II-5A => Ahurochuun under construction and launched (Oct 30). Falk U. Rogner laid down and under construction (Nov 15).
Slip I-5A => Ananda laid down and under construction.
Dock III-5A => Empress Elmelah Colus laid down and under construction.
Hakodate Navy Yard, Hakodate (Hokkaido)
Slip III-6A => Meiran under construction and launched (Oct 30). Grard Sydmian laid down and under construction (Nov 15).
Slip II-6A => Sorutiaru under construction and launched (Oct 30). Lie Ex laid down and under construction (Nov 15).
Slip I-6A => Rinsa laid down and under construction.
Aomori Navy Yard, Aomori (Honshu)
Slip III-7A => Kurikkaku under construction and launched (Oct 30). Dr. Chrome Ballanche laid down and under construction (Nov 15).
Slip I-7A => Go II-1 under construction and launched (Oct 26). Spector laid down and under construction (Nov 15).
Dock I-7A => Ochesutoro laid down and under construction.
Kagoshima Navy Yard, Kagoshima (Kyushu)
Slip III-8A => Teku under construction and launched (Oct 30). Dr. Prisen Corks laid down and under construction (Nov 15)
Slip I-8A => Go II-2 under construction and launched (Oct 27). Dr. Dippa Dorpos laid down and under construction (Nov 15)
Dock I-8A => Uiruma laid down and under construction.
Wakayama Navy Yard, Wakayama (Honshu)
Slip III-9A => Esuto under construction and launched (Oct 30). Dr. Morard Carbyte laid down and under construction (Nov 15)
Slip I-9A => Ladios Sopp under construction and launched (Oct 30), Hind Kill laid down and under construction (Nov 15).
Dock I-9A => Birudo laid down and under construction.
Tokushima Navy Yard, Tokushima (Shikoku)
Slip III-10A => Syucha under construction and launched (Oct 30). Dr. Steel Koop laid down and under construction (Nov 15).
Slip I-10A => Voards Viewlard under construction and launched (Oct 30). Leopard Crytharis laid down and under construction (Nov 15)
Dock I-10A => Erara laid down and under construction.
Niigata Navy Yard, Niigata (Honshu)
Slip I-11A => Queen Lizard Meistner laid down and under construction.
Slip I-11B => Sarome laid down and under construction.
Dock III-11A => Konkoodo laid down and under construction.
Niihama Navy Yard, Niihama (Shikoku)
Slip I-12A => Potaru under construction and launched (Oct 30). Amaterasu-no-Mikado laid down and under construction (Nov 15)
Slip I-12B => Firetto under construction and launched (Oct 30). Mission Rouath laid down and under construction (Nov 15)
Dock III-12A => Melcorr Litra laid down and under construction.

II) Free-floating construction at:

Kure Navy Yard, Kure (Honshu)
- Aguraia completed
- Machi completed
Yokosuka Navy Yard, Yokosuka (Honshu)
- Tairea completed
- Kyo completed
Kawasaki Co, Kobe (Honshu)
- Zuiho under construction
- Aukusoo completed
- Kuroosoo completed
Mitsubushi Co, Nagasaki (Kyushu)
- Shoho completed
- Arekuto completed
Fukuoka Navy Yard, Fukuoka (Kyushu)
- Megaera completed
- Rere-Sha completed
Hakodate Navy Yard, Hakodate (Hokkaido)
- Teisuhoon completed
- Andoromedaa completed
Aomori Navy Yard, Aomori (Honshu)
- Yuupandara completed
- Suparichuuta completed
Kagoshima Navy Yard, Kagoshima (Kyushu)
- Atorobosu completed
- Akiresu completed
Wakayama Navy Yard, Wakayama (Honshu)
- Kameko-chan completed
- Ikarosu completed
Tokushima Navy Yard, Tokushima (Shikoku)
- Rakishisu completed
- Tiita completed
Niigata Navy Yard, Niigata (Honshu)
- Kurakarain completed
- Efuroshuune completed
Niihama Navy Yard, Niihama (Shikoku)
- Kare completed
- Pashitea completed

2

Monday, April 12th 2004, 5:10pm

Fourth Quarter attachment I

Subject: Progress on the Dowager Eisho class Japanese Ocean Liner.

Tokugawa-dono,

Here is this quarter’s report from the Civilian Shipbuilding Department …

========================================
Report from the Civilian Shipbuilding Department
From: CSD
To: Nakamura Shoda
Subject: Dowager Eisho Class progress report 4th Quarter 1922


Nakamura-sama,
Here is the information for the 4th Quarter:

Factories XIII to XXVI produce 7000 tons of civilian materials in the quarter.
The Empress Asako was laid down on October 5 and will require 48 months construction time and 38,997 tons of materials.
Of the 7,000 tons produced, the Empress Yoshiko gets 2000 tons and the Empress Yasuko and Empress Asako will each get 2500 tons.
The Empress Yoshiko still requires 33 months and 19,247 tons of materials at the end of the fourth quarter.
The Empress Yasuko still requires 39 months and 29,747 tons of materials at the end of the fourth quarter.
The Empress Yasuko still requires 45 months and 36,497 tons of materials at the end of the fourth quarter.

Konoye Fumimaro
Director of the Civillian Shipbuilding Department


========================================

Your loyal servant and secretary,
Nakamura Shoda

3

Monday, April 12th 2004, 5:58pm

Fourth Quarter attachment II

Year report of 1922

Budget assigned to navy: 5.5 billion yen + 0.01 left from 1921
Budget used: 6.13 billion yen
We went 620 million yen over the Naval budget with our building plan. This has been taken from the Bakufu reserve funds and wages (for it was their fault that only 5.5 billion was assigned to the Navy). It is vital that you convince them to increase the budget even more for next year.

Sips laid down: 78 (2 GB, 76 DD-3)
Ships launched: 44 (1 CL, 2 GB, 41 DD-3)
Ships completed: 40 (3 CDS, 1 CL, 36 DD-3)

Warship materials produced: 53,000 tons
Warship materials acquired: 1,000 tons (Kobe Protocol)
Warship materials used: 54,000 tons

Infrastructure points produced: 6.1
Infrastructure points used: 6.1