Report for Q2/1944
Industrial Allocation
- 24/27 factories producing 24,000t materials.
- 3/27 factories producing infrastructure
- 941t from stockpile.
- 2,378t from transactions.
- 880t from scrapping.
- 28,200t materials total.
- 27,297 used.
- 903t stored for Q3/44.
Infrastructure Development
3 factories dedicated to IP, producing 0.3 IP. 4.1 IP added to half-factory, 0.9 IP remaining.
Naval Construction
At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Idle
Class 4 Slip #1 - Export Battleship
Tapae laid down for Romania January 1st, 1943. 34,448 tons required. 2,379 tons added in Q2/1944 for a total of 14274 / 34448 tons. 20174 / 34448 tons remaining. Launched June, 1944. Completion planned for September 9th, 1946.
Class 3 Slip #1 - Heavy Cruiser
Redoubtable laid down July 1st, 1943. 14,275 tons required. 2400 tons added in Q2/1944 for a total of 2700 / 14275 tons. 11575 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
Class 3 Slip #2 - Heavy Cruiser
Renommée laid down July 1st, 1943. 14,275 tons required. 2400 tons added in Q2/1944 for a total of 2700 / 14275 tons. 11575 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
Class 3 Slip #3 - Contre-Torpillieur
Guépratte (
Forbin class) laid down January 1st, 1944. 2,500 tons required. 625 tons added in Q2/1944 for a total of 1250 / 2500 tons. 1250 / 2500 tons remaining. Launched May 19th, 1944. Completed December 15th, 1944.
Class 3 Slip #4 - Contre-Torpillieur
Duperré (
Forbin class) laid down March 1st, 1944. 2,500 tons required. 210 tons added in Q1/1944 for a total of 835 / 2500 tons. 1665 / 2500 tons remaining. Launched July 19th, 1944. Completed March 15th, 1945.
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Contre-Torpillieur
L'Inflexible (
Forbin class) laid down May 1st, 1944. 2,500 tons required. 625 tons added in Q2/1944 for a total of 625 / 2500 tons. 1875 / 2500 tons remaining. Launched September 19th, 1944. Completed April 15th, 1945.
Class 1 Slip #1 - Escorteur rapide
Le Vendéen laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q2/1944 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
Class 1 Slip #2 - Escorteur rapide
Le Bordelais laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q2/1944 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
Class 1 Slip #3 - Escorteur rapide
Le Gascon laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q2/1944 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
Class 1 Slip #4 - Escorteur rapide
Le Savoyard laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q2/1944 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
Class 0 Slip #1 - Submarine
Naiade (
Thetis class) laid down January 1st, 1944. 675 tons required. 300 tons added in Q2/1944 for a total of 600 / 675 tons. 75 / 675 tons remaining. Launched April 30th, 1944. Completed October 21st, 1944
Class 0 Slip #2 - Submarine
Circé (
Thetis class) laid down April 1st, 1944. 675 tons required. 300 tons added in Q2/1944 for a total of 300 / 675 tons. 375 / 675 tons remaining. Launched July 30th, 1944. Completed January 21st, 1945.
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Dockside:
- Aircraft Carrier
Vengeur laid down January 1st, 1941. 33,000 tons required. 1,500 tons added in Q2/1944 for a total of 33000 / 33000 tons. 0 / 33000 tons remaining. Launched June 24th, 1942. Completed May 1st, 1944.
- Aircraft Carrier
Pacificateur laid down January 1st, 1941. 33,000 tons required. 1,500 tons added in Q2/1944 for a total of 33000 / 33000 tons. 0 / 33000 tons remaining. Launched June 24th, 1942. Completed May 1st, 1944.
- Contre-Torpillieur
Chevalier Paul (
Forbin class) laid down May 1st, 1943. 2,500 tons required. 0 tons added in Q2/1944 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched September 19th, 1943. Completed April 15th, 1944.
- Contre-Torpillieur
Vauquelin (
Forbin class) laid down July 1st, 1943. 2,500 tons required. 625 tons added in Q2/1944 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched November 19th, 1943. Completed June 15th, 1944.
- Contre-Torpillieur
D'Estrées (
Forbin class) laid down September 1st, 1943. 2,500 tons required. 625 tons added in Q2/1944 for a total of 2085 / 2500 tons. 415 / 2500 tons remaining. Launched January 19th, 1943. Completed August 15th, 1944.
- Contre-Torpillieur
d'Estaing (
Forbin class) laid down November 1st, 1943. 2,500 tons required. 625 tons added in Q2/1944 for a total of 1875 / 2500 tons. 625 / 2500 tons remaining. Launched March 19th, 1944. Completed October 15th, 1944.
- Contre-Torpillieur
Claymore (
Sabre class,
Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q2/1944 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1943. Completed June 4th, 1944.
- Contre-Torpillieur
Carabine (
Sabre class,
Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q2/1944 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1943. Completed June 4th, 1944.
- Contre-Torpillieur
Épée (
Sabre class,
Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q2/1944 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1943. Completed June 4th, 1944.
- Contre-Torpillieur
Trident (
Sabre class,
Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q2/1944 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1943. Completed June 4th, 1944.
- Submarine
Atalante (
Thetis class) laid down July 1st, 1943. 675 tons required. 0 tons added in Q2/1944 for a total of 675 / 675 tons. 0 / 675 tons remaining. Launched October 31st, 1943. Completed April 21st, 1944.
- Submarine
Calypso (
Thetis class) laid down October 1st, 1943. 675 tons required. 75 tons added in Q2/1944 for a total of 675 / 675 tons. 0 / 675 tons remaining. Launched February 31st, 1943. Completed July 21st, 1944.
- Landing craft
Spahi laid down January 1st, 1944. 179 tons required. 74 tons added in Q2/1944 for a total of 179 / 179 tons. 0 / 179 tons remaining. Launched February 2nd, 1944. Completed May 6th, 1944.
- Landing craft
Chasseur laid down January 1st, 1944. 179 tons required. 74 tons added in Q2/1944 for a total of 179 / 179 tons. 0 / 179 tons remaining. Launched February 2nd, 1944. Completed May 6th, 1944.
- Tanker
Nivôse converted as naval auxiliary. 260 tons required. 260 tons added in Q2/1944. Conversion completed.
At Brest (Cl 5)
Class 3 Drydock #1 - Destroyer
Vautor undergoing minor refit beginning April 1st, 1944. 100 tons required. 100 tons added Q2/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes May 17th.
Class 2 Drydock #1 - Light cruiser
Primauguet begins partial reconstruction on April 1st, 1944. 2797 tons required. 1100 tons added in Q2 for a total of 1100 / 2797 tons. 1697 /2797 tons remaining. Refit completed November 11th, 1944.
Class 1 Drydock #1 - Destroyer
Gerfaut undergoing minor refit beginning April 1st, 1944. 100 tons required. 100 tons added Q2/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes May 17th.
Class 0 Drydock #1 - Idle
Dockside:
N/A
At Cayenne (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Dockside:
N/A
At Abidjan (Cl 5)
Class 3 Drydock #1 -
Audaciaux class destroyer
Topaz scrapping. 178 tons recovered.
Class 1 Drydock #1 - Idle
At Marseilles (Cl 5)
Class 4 Drydock #1 - Idle
Class 3 Slip #1 - Aircraft Carrier
Zélé laid down January 1st, 1944. 14,550 tons required. 100 tons added in Q2/1944 for a total of 200 / 14550 tons. 14350 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
Class 3 Slip #2 - Aircraft Carrier
Héros laid down January 1st, 1944. 14,550 tons required. 100 tons added in Q2/1944 for a total of 200 / 14550 tons. 14350 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
Class 2 Drydock #1 - Frégate de surveillance
Fidji (
Polynésie class) laid down January 1st, 1944. 2,779 tons required. 679 tons added in Q1/1944 for a total of 1358 / 2779 tons. 1421 / 2779 tons remaining. Launched May 22nd, 1944. Completed December 24th, 1944.
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Frégate
Sans Peur laid down January 1st, 1944. 1,400 tons required. 400 tons added in Q2/1944 for a total of 800 / 1400 tons. 600 / 1400 tons remaining. Launched May 5th, 1944. Completed December 12th, 1944.
Class 1 Drydock #1 - Destroyer
Aigle undergoing minor refit beginning April 1st, 1944. 100 tons required. 100 tons added Q2/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes May 17th.
Class 0 Drydock #1 - Idle
Dockside:
- Landing Ship Dock
Destrées (
Châteaurenault class) laid down January 1st, 1943. 7539 tons required. 39 tons added in Q2/1944 for a total of 7539 / 7539 tons. 0 / 7539 tons remaining. Launched July 19th, 1943. Completed May 17th, 1944.
- Submarine
Roland Morillot laid down July 1st, 1943. 1,450 tons required. 100 tons added in Q3/1944 for a total of 1550 / 1450 tons. 0 / 1450 tons remaining. Launched November 6th, 1943. Completed May 15th, 1944.
- Submarine
Charles Drujon laid down July 1st, 1943. 1,450 tons required. 100 tons added in Q3/1944 for a total of 1550 / 1450 tons. 0 / 1450 tons remaining. Launched November 6th, 1943. Completed May 15th, 1944.
At Oran (Cl 5)
Class 1 Drydock #1 - Destroyer
Albatros undergoing minor refit beginning April 1st, 1944. 100 tons required. 100 tons added Q2/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes May 17th.
Class 0 Drydock #1 -
Emilia-class patrouilleur
Carmen refitting. 56 tons required. 56 tons added Q2/44. 0 tons remaining. Refit completed.
Dockside:
N/A
At Tunis (Cl 5)
Class 4 Drydock #1 - Light cruiser
Emile Bertin begins partial reconstruction on January 1st, 1944. 2797 tons required. 1100 tons added in Q2 for a total of 2200 / 2797 tons. 597 /2797 tons remaining. Refit completed August 11th, 1944.
Class 3 Slip #1 - Idle
Class 1 drydock #1 -
Emilia-class patrouilleur
Cathérine refitting. 56 tons required. 56 tons added Q2/44. 0 tons remaining. Refit completed.
Dockside:
N/A
At Beiruit (Cl 5)
Class 3 Drydock #1 - Cargo Ship
Gallieni converted to naval landing ship. 1269 tons required. 369 tons added in Q2/44 for a total of 1269 / 1269 tons. 0 / 1269 tons remaining.
Class 1 Drydock #1 - CS27-class submarine
Q181 scrapping. 66 tons recovered.
Dockside:
N/A
At Djibouti (Cl 2)
Class 2 Drydock #1 - Idle.
Class 1 Drydock - Idle.
Class 1 Drydock #1 - Corvette
Sambre refitting. 80 tons required. 80 tons added Q2/1944. 0 tons remaining. Refit completes May 15th, 1944.
Dockside:
- None
At Dakar
Class 1 Floating Drydock #1 - Setting up for operation
At Saigon (Cl 5)
Class 4 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 -
Emilia-class patrouilleur
Marie refitting. 56 tons required. 56 tons added Q2/44. 0 tons remaining. Refit completed.
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down April 1st; 8 tons added Q2/44. Completed April 30th, 1944, launched. Vedette FOM 11m laid down April 1st; 11 tons added Q2/44. Completed April 30th, 1944, launched.
Class 0 Slip #2 - Subchaser
Thi Nai laid down April 1st; 125 tons added Q2/44. Completed April 30th, 1944, launched.
Thi Nai
Dockside:
- N/A
Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 -
Emilia-class patrouilleur
Bettina refitting. 56 tons required. 56 tons added Q2/44. 0 tons remaining. Refit completed.
At New Caledonia (Cl 5)
Class 4 Drydock #1 - Heavy cruiser
Nouvelle-Calédonie continues total reconstruction. 8601 tons required. 3000 tons added in Q2/1944 for a total of 3600 / 8601 tons. 5001 / 8601 tons remaining. Reconstruction completes Q4/1944.
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Aviso
Annamite (
Arabe class) laid down January 1st, 1944. 634 tons required. 190 tons added in Q2/1944 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched April 27th, 1944. Completed October 19th, 1944.
Class 0 Slip #2 - Aviso
Van Kiep (ex-
Bambara) (
Arabe class) laid down January 1st, 1944. 634 tons required. 190 tons added in Q2/1944 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched April 27th, 1944. Completed October 19th, 1944.
Class 0 Slip #3 - Idle
Dockside:
- Aviso
Arabe (
Arabe class) laid down July 1st, 1943. 634 tons required. 64 tons added in Q2/1944 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched October 27st, 1943. Completed April 19th, 1944.
- Aviso
Chi Lang (ex-
Algérien) (
Arabe class) laid down July 1st, 1943. 634 tons required. 64 tons added in Q2/1944 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched October 27st, 1943. Completed April 19th, 1944.
At Papeete (Cl 3)
Class 3.5 Drydock - Idle
Dockside:
- None
On Trials:
- CA
Jean Bart
- CA
Jeanne d'Arc
- LSD
Destrées
- DD
Claymore
- DD
Carabine
- DD
Épée
- DD
Trident
- AV
Arabe
- AV
Chi Lang
- SS
Thetis
- SS
Nymphe
- SS
Atalante
- LCI
Spahi
- LCI
Chasseur
- FGT
Sans Reproche
- FGT
Tran Nhat Duat
- ER
Le Normand
- ER
Le Boulonnais
- ER
Le Lorrain
From Factories
- 2x
La Combattante II motor torpedo boats built; 320 tons total (160t each).
Transactions
2,379 tons from Romania for Export Battleship (construction costs).
Other Notes
None
Ships being scrapped
One
Audaciaux-class destroyer is being scrapped for 178 tons apiece.
One
CS-27-class submarine is being scrapped for 66 tons apiece.
- Total tonnage in recycling until Q2/1944: (10x88) = 880
- Total tonnage in recycling until Q4/1944: (9x178) + (1x66) = 1668
- Total tonnage in recycling until Q1/1945: (1x178) + (1x66) = 244
Updated Order of Battle, End of Q2/1944
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping
The Fleet
Battleships: 7(0)+1
Battlecruisers: 4(0)+0
Aircraft Carriers: 11(0)+2
Heavy Cruisers: 14(1)+2
Light Cruisers: 24(2)+0
Coast Defense Ships: 5(0)+0
Destroyers: 82(0)+5
Frigate: 2(0)+2
Corvettes: 10(0)+0
Escorteurs Rapides: 4(0)+4
Avisos: 10(0)+2
Fleet Submarines: 26(0)+0
Coastal Submarines: 55(0)+3
Motor Torpedo Boats: 36(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Submarine Chasers: 100(0)+0
Light Patrol Boats: 8(0)+0
River Gunboats: 34 (0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0
Fleet Train
Replenishment Ships: 14(0)+0
Light Oiler Tankers: 7(0)+0
Gasoline Tankers: 3(0)+0
Oil Transport Tankers: 4(0)+0
Fleet Tenders: 4(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 2(0)+0
Light Repair Ships: 4(0)+0
Ammunition Ships: 2(0)+0
Transports: 8(0)+0
Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 10(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 0(0)+0
Research Ship: 3(0)+0
Research Submarine: 1(0)+0
Amphibious Forces:
Dock Landing Ship: 2(0)+0
Vehicle Landing Ship: 4(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 10(0)+0
Infantry Landing Craft Large (EDA-L): 6(0)+0
Tank Landing Craft (EDA): 13(0)+0
Infantry Assault Craft Small (EA): 29(0)+0
Minor Craft:
Bateau de Service: 72(0)+0
Patrouilleur de Port: 54(0)+0
Patrouille Navale:
Frigate: 1(0)+0
Survey Craft: 1(0)+0
Tank Landing Craft (EDA): 8(0)+0
Infantry Assault Craft (EA): 8(0)+0
Submarine Chasers: 53(0)+0
Motor Torpedo Boats: 4(0)+0
Vedettes: 18(0)+0
Light Patrol Boats: 4(0)+0
Bateau de Service: 12(0)+0
Patrouilleur de Port: 4(0)+0