German Naval Developments – Q3/30
A. Industrial Allocation
Factory Allocation:
Warship Material: 4
Infrastructure (Committed): 21 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 1
Warship Material Produced: 4000 t
Stockpile: 2552 t
Recycled Scrap: 0 t
Material Used on Construction: 2945 t
New Stockpile: 3607 t
B. Infrastructure Development
Factory 27 receives 1 point, for 8 total.
Factory 28 receives 1 point, for 8 total.
Type 3 slipway at Cuxhaven upgrade to Type 4 receives 0.2 pts, for 0.8 total.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Submarine
U-2 receives 135t, launched
1 Type 0 drydock: Idle
Free-floating: Submarine
U-1 receives 135t
At Bremerhaven
1 Type 3 slip: CA
Ersatz B laid down, receives 1773t
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: DD
Z-214 receives 451t
At Cuxhaven
1 Type 3 slip: Upgrading
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip: DD
Z-215 receives 451t, launched
1 Type 0 slip: Idle
Free-floating: Idle
At Kiel
1 Type 4 slipway: CA
Ersatz A receives 1773t, launched, christened
Admiral Hipper
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle
D. Transactions
Ersatz B laid down at Bremerhaven
E. Other Notes
CL
Nurnberg completes her shakedown cruise
F. Updated Order of Battle, 30/6/30
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
CA: 0(0)+2
CL: 12(0),
DD: 18(0)+2,
SS: 0(0)+2
SL: 6(0)+0
AM: 10(0)+0
TB: 4(0)+0
Target: 1(0)+0