Yugoslavia Q3,1930
2-factories
1-fix on infrastructure Biding 0,1IP on Type 1 slip 40%completed
1-bilding warship material 1000t produced transferd to Italy
at Belgrade:
1 Type 0 slip Idle
1 Type 0 drydock Idle
at Bar
1 Type 0 slip upgrading
2 Type 0 slips Idle
1 Type 1 drydock Idle
1 Type 0 drydock Idle
OOB
CL 1(0)+0
DD 6(0)+0
DE 0(0)+6
SC 2(0)+0
TB 15(0)+0
M/ML 9(0)+0
Romania Q3,1930
5 -factories
4-fix on Infrastructure 0,4IPBilding Factory6(22%completed)
1-not fixed bilding 0,1IP stransferd to Yugoslavia
at Galatz:
1 Type 0 slip Idle
1 Type 0 drydock Idle
at Constanta:
1 Type 1 slips bilding vr30 500t used 1000total
1 Type 1 slips bilding vr30 500t used 1000total
3 Type 0 slips Idle
1 Type 2 drydock Idle
1 Type 1 drydock Idle
1 Type 0 drydock Idle
OOB
BB 1(0)+0
CL 1(0)+0
DD 8(0)+2
TB 13(0)+0
GB 7(0)+0
M 7(0)+0
Subs 2(0)+0
4 factories
1 fix on infrastructure 0,1IP Bilding Factory
(8%Completed)
3 bilding Warship material 3000t
Warship Material Produced: 3000 t
Stockpile: 2614 t
Recycled Scrap: 0 t
Material Used on Construction: 2150 t
Transferd to Nordmark: 1000t Payment for Submarines now under construction.
Transferd to Romania:1000t
New Stockpile: 1514 t
B. Infrastructure Development
0.7 pts, for bilding factory 5(7% complited)
C. Naval Construction
at Danzig:
1 Type 2 slip Idle
1 Type 1 slips idle
1 Type 1 slips Idle
1 Type 0 slips bilding Chart Class 100t used(200t of 600t)
1 Type 0 slips bilding Chart Class 100t used(200t of 600t)
1 Type 1 drydock Idle
at Koszalin
1 Type 1 slips Idle
1 Type 0 slips bilding Chart Class 100t used(200t of 600t)
1 Type 0 slips bilding Chart Class 100t used(200t of 600t)
1 Type 2 drydock repering B Grunwald 50t used
2 Type 0 drydocks idle
Conrad 400t used
Chart 1 to 4 400t used
Pomocnik 1 to 3 750t used
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 2(1)+0
CL: 0(0)+1
DD: 2(0)+2 in france
FTB: 0(0)+8
AG: 0(0)+3
SS:0(0)+6 in nordmark