[SIZE=4]SAE Quarterly Reports[/SIZE]
No. 55 - July to September 1934
[SIZE=3]Transfers[/SIZE]
2.000ts transferred from Peru
[SIZE=3]Factories: [/SIZE]
26 factories total can be used.
Fixed factories
4 factory will be fixed to produce infrastructure points for 1934.
Flexible factories
653ts material transferred from Q2 (incl. material recovered from scrapyard).
21,632ts material necessary to be produced in this quarter (22 factories).
0 factories will produce infrastructure points this quarter.
Infrastructure points used this quarter:
0,4pts put into factory #27 for a total of 2pts at the end of Q3/34.
[SIZE=3]Ships:[/SIZE]
Minor vessels
Completed Units
48x UJ26-class ASW launch
36x UJ30-class ASW launch
48x R28-class motor launch
24x R31-class motor launch
8x Tree-class minesweeper (Type 16)
13x Bush-class minesweeper (Type 21)
16x Cactus-class minesweeper (Type 28)
8x S-class sloops
4x Circe-class sloops
2x Polar II-class sloops
16x River-class frigate
8x Pleiades-class light destroyers
8x Planet-class light destroyers
5x Guard-class patrol crafts
On Trials
2x Bush-class minesweeper
- Syringa running trials until July 34
- Hazel running trials until November 34
2x Polar-class sloop
- Polar Flake II running trials until August 34
- Polar-White II running trials until September 34
8x S34-class motor torpedo boat
- S1-S4 running trials until July 34
- S5-S8 running trials until September 34
Ordered Units
4x S34-class motor torpedo boat (1 month á 60ts material necessary per unit)
- S9-S12 laid down in Lüderitz in August, completed in August 34
Rebuilds/Refits
1x Bush-class minesweeper (2 month á 65ts/month material necessary per unit)
- Barberry entering a Type 0 dock in Douala in June. Leaving the dock in June, the minesweeper will stay in the yard until July 34
Scrapping
None
Destroyers
Completed Units
12x Cat-class torpedoboat (Type 16)
12x Hound-class torpedoboat (Type 21)
12x Hound-class torpedoboat (Type 26)
12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
4x Snake-class destroyer (Type 32)
8x Weapon-class destroyer leader (Type 28)
5x Weapon-class destroyer leader (Type 32)
On Trials
2x DD32-class destroyer
- Monatheris running trials until August 34
- Lachesis running trials until November 34
2x DL32-class destroyer
- Longsword trials until July 34
- Epee trials until November 34
Ordered Units
2x DD32-class destroyer (11 month á 145ts material necessary per unit)
- Sidewinder laid down in Durban on a Type 1 slip in April, completed in February 35
- Pit Viper laid down in Durban on a Type 1 slip in April, completed in February 35
1x DL32-class destroyer (11 month á 180ts material necessary per unit)
- Rapier laid down in Durban on a Type 2 slip in October, completed in August 34
Rebuilds
None
Scrapping
None
Class B Cruisers
Completed Units
2x Nampula-class light cruiser (Type 08)
6x Port Shepstone-class light cruiser (Type 13)
6x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
2x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
4x Aurora-class light cruiser (Type 24)
4x Arion-class light cruiser (Type 27)
4x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
5x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
On Trials
1x CL21-class light cruiser
- Libreville running trials until September 34
1x CL33-class light cruiser
- Antenor running trials until December 34
Ordered Units
3x DL34C-class destroyer leader (11 month á 239ts material necessary per unit)
- Diana laid down in Mar del Plata on a Type 2 slip in April, completed in March 35
- Daphne laid down in Cape Town on a Type 2 slip in July, completed in August 35
- Dione laid down in Montevideo on a Type 2 slip in July, completed in August 35
Rebuilds/Refits
1x CL21-class light cruiser (4 month á 334ts/month material necessary per unit)
- Maroua entering a Type 2 dock in Durban in April. Leaving the dock in May, the cruiser will stay in the yard until July 34
Scrapping
None
Class A Cruisers
Completed Units
1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
2x Dragon-class (Type 29)
On Trials
None
Ordered Units
1x Hero-class heavy cruiser (21 month á 555ts material necessary per unit)
- Abderos laid down in Buenos Aires on a Type 3 slip in January, completed in September 34
2x CA34F-class heavy cruiser (26 month á 666ts material necessary per unit)
- Radiance laid down in Port Elizabeth on a Type 4 slip in April, completed in May 36
- Brilliance laid down in Durban on a Type 4 slip in July, completed in August 36
Refits
None
Scrapping
None
Capital Units
Completed Units
2x Hertog-class
4x Koning-class
2x Mauritius-class
0x South Africa-class
2x Mocambique-class
2x Ophion-class
On Trials
2x BC31-class battle cruiser
- Triumph running trials until September 34
- Victory running trials until December 34
1x South Africa-class battleship
- South Africa running trials until September 34
Ordered Units
2x BB29O-class battleship (47 month á 800ts material necessary per unit)
- Imperator laid down in Durban on a Type 4 slip in January, completed in November 34
- Conqueror laid down in Montevideo on a Type 4 slip in January, completed in November 34
2x BB33Lh-class battleship (48 month á 796ts material necessary per unit)
- Monarch laid down in Montevideo on a Type 4 slip in January, completed in December 36
- Sovereign laid down in Buenos Aires on a Type 4 slip in January, completed in December 37
Rebuilds/Refits
1x South Africa-class battleship (22 month á 753ts/month material necessary per unit)
- Cameroon entering a Type 4 dock in Montevideo in April. Leaving the dock in December 33, the capital ship will stay in the yard until January 35
Scrapping
None
Coastal Defence Units
Completed Units
1x Nagelring-class
1x Tyrfing-class
1x Gungnir-class
2x LCDS-class
2x LCDS-2-class
On Trials
None
Ordered Units
None
Carriers
Completed Units
1x Hammer-class fleet carrier (Type 25B)
1x Forge-class fleet carrier (Type 26)
2x Anvil-class light fleet carrier (Type 30)
On Trials
None
Ordered Units
1x CV34-class carrier (30 month á 687ts material necessary per unit)
- Thomas van Deen laid down in Durban on a Type 3 slip in April, completed in September 36
Rebuilds/Refits
None
Class A Submarines
Completed Units
11x E-class submarine
15x F-class submarine
4x J-class submarine
2x L-class submarine
On Trials
None
Ordered Units
None
Class B Submarines
Completed Units
15x I-class submarine
12x H-class submarine
16x K-class submarine
On Trials
None
Ordered Units
None
Scrapping
None
Non-combatants
Completed Units
1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
0x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 19)
4x Bay-class tender (Type 23)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
4x Mimir-class floatplane carriers
2x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
1x FV32-class fleet support ship
On Trials
2x St Francis Bay-class tender
- St Francis Bay running trials until July 34
- St Helena Bay running trials until July 34
Ordered Units
None
Rebuilds/Refits
None
--------------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
84 ASW launches
72 motor launches
37 minesweepers
51 small patrol crafts
106 TB/DD/DLs of less than 2,000ts
44 cruisers category b
9 cruisers category a
12 capital units
7 costal defence ships
4 fleet carrier
43 submarines category b
32 submarines category a
8 floatplane carriers
19 armed tenders
plus numerous auxiliary vessels of all kind.