*subject to editing*
A. Industrial Allocation
3/6 factories (non-fixed) to naval materials: 3,000 tons created for Q3/1935 plus 1,222 tons transfered from Bulgaria = 4,222 tons
3,505 tons used, 717 tons stockpiled for next quarter
1/6 factories (fixed) to infrastructure development: 0.1 points for Q3/1935
2/6 factories (non-fixed) to infrastructure development: 0.2 points for Q3/1935
Total 0.3 points created for Q3/35 for total of 0.3 IP's for use
B. Infrastructure Development
0.3 points added to one Type 0 drydock at Istambul
C. Naval Construction
Istambul
Type 1 slip #1 - DD Bartin laid down, 1,878 tons needed, 578 tons added
Type 1 slip #2 - DD Bafra laid down, 1,878 tons needed, 578 tons added
Type 1 slip #3 - DDL Togrul laid down 2,848 tons needed, 848 tons added
Type 1 slip #4 - completed
Type 0 slip #1 - Idle
Type 0 slip #2 - Idle
Type 0 drydock #1 under construction, 0.2 IP's used, 0.3 IP's added
DD's Bozcaada and Bodrum, freefloating, 1,878 tons needed (each), 1,408 tons used (each), 70 tons added to each
Izmit
Type 3 drydock #1 - Idle
Type 2 slip #1- DDL Seljuk launched, 2,848 tons needed, 1,823 tons used, 625 tons added, Bulgarian CL Maritsa laid down, 436 tons added
Type 1 drydock #1 - Idle
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
Samsun
Type 3 drydock #1 - Idle
Type 1 drydock #1 - Idle
Type 0 drydock #2 - Idle
Icel
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
Type 3 drydock #1 - completed
Type 0 slip #1 - Idle
Type 0 drydock #1 - Idle
DD's Bandirma and Beykoz, freefloating, 1,878 tons needed (each), 1,408 tons used (each), 170 tons added to each
Trabzon
Type 1 drydock #1 - Idle
Launched ships being completed:
DD's Bozcaada, Bodrum, Bandirma and Beykoz (70 tons each)
Ships completed/transfered and on trials
none
Summary of ship building/repairs/rebuilds and convertions.
DDL Seljuk launched, building
DDL Togrul laid down
DD's Bartin and Bafra laid down
DD's Bozcaada, Bodrum, Bandirma and Beykoz freefloating, complete at end of quarter
D. Transactions
- 787 tons transferred from Bulgaria for payment for light cruiser design
- 435 tons transferred from Bulgaria 08/35 for construction of CL-2 (Maritsa) in September (one month's construction materials)
E. Other Notes
None
F. Updated Order of Battle, 1/1/35
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB:..................................3(0)0
BC:..................................1(0)0
PD:..................................1(0)0 *taken out of service*
AC:..................................1(0)0
CA:..................................1(0)0
PC:..................................2(0)0
CL:...................................4(0)1 *For Bulgaria
DDL:................................6(0)2
DD:..................................19(0)6
Torpedo boats:..................24+*7(0)0 *taken out of service
Sloops:.............................1(0)0 *taken out of service*
Frigates:...........................0(0)0
Moniters:..........................0(0)0
Torpedo gunboats:.............2(0)0
Gunboats:.........................8(0)0
Patrol vessels:...................24(0)0
MTB's:.............................18(0)0
Mine sweepers:.................6+*2(0)0 *Kirsund and Intibah taken out of service*
Minelayers:.......................0(0)0
Mine warfare ships:............5(0)0
Sub chasers:.....................36(0)0
Motor Launches:................39(0)0 *9 transfered to Byzantium
Motor Launche/minlayers:..10(0)0
Fleet Submarine:...............0(0)0
Coastal Submarine:...........0(0)0
Floatplane carrier/tenders:..0(0)0
destroyer depot ships:........2(0)0
Submarine depot ships:......0(0)0
Auxillary's:.........................N/A