Australian Industrial Report – Q1/ 1945
__________________________________
Industrial Allocation
0/10 factories are dedicated to producing infrastructure materials = 0 pts
0/10 factories are producing infrastructure materials = 0 pts
10/10 factories producing warship material = 10000 t.
Stockpiled warship material available = 440t
Stockpiled Industrial points = 0
Total points available = 0
Total warship material available = 10440t
__________________________________
Infrastructure Development
__________________________________
Naval Construction
HMAS Invincible receives 2000t
HMAS Inflexible receives 2000t
HMAS Pegasus receives 2000t
HMAS OFF-17 receives 500t
HMAS OFF-18 receives 500t
HMAS OFF-19 receives 500t
HMAS OFF-20 receives 500t
HMAS Alacrity receives 400t
HMAS Audacity receives 400t
HMAS Adventure receives 400t
HMAS Advantage receives 400t
HMAS Ambush receives 400t
440t surplus
__________________________________
Sydney, NSW (Cockatoo Island)
Type 3 Drydock: HMAS Australia 8000/24000 (Q4/46)
Type 2 Drydock: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 0 Slip: Idle
Dockside: HMAS Murri Q3/45
HMAS OFF-16 receives 500t, completed (Q2/45)
Sydney, NSW (Cook Dock, Garden Island)
Type 3 Drydock: HMAS New Zealand 10000/24000 (Q3/46)
Type 2 Drydock: HMAS Adventure 400/400 3/3 months remaining
HMAS Advantage 400/400 3/3 months remaining
HMAS Ambush 400/400 3/3 months remaining
Type 1 Drydock: HMAS Alacrity 400/400 3/3 months remaining
HMAS Audacity 400/400 3/3 months remaining
Dockside: HMAS Murrawarrii Q3/45
HMAS OFF-17 receives 500t, completed (Q2/45)
Devonport, NZ (Calliope Dock)
Type 2 Drydock: Idle
Dockside: HMAS Pegasus 5910/7410 1/10 months remaining
Perth, WA (Garden Island)
Type 1 Drydock: Idle
Dockside: HMAS OFF-18 receives 500t, completed (Q2/45)
Port Moresby, NG
Type 1 Drydock: Idle
Dockside: HMAS OFF-19 receives 500t, completed (Q2/45)
Darwin, NT
Type 1 Drydock:
Dockside: HMAS OFF-20 receives 500t, completed (Q2/45)
__________________________________
Transactions
None
__________________________________
Other Notes
__________________________________