You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, January 26th 2011, 2:32am

Lithuania, 2Q/39

Q2, 1939

Industrial Allocation
- 0/2 factories producing 0t materials.
- 2/2 factories producing 0.2 IP infrastructure (dedicated)
- 0t from stockpile.
- 0t used, 0t to stockpile.

Infrastructure Development
0.2 IP to new Type 0 Drydock at Palanga. 0.4 IP added to date.

Naval Construction

at Palanga:
D2: Idle
S1: Idle
D0: Under construction, 0.4 IP of 1.0 IP added.
S0: Idle
S0: Idle

Dockside:
NA

From factories:
N/A

On Trials
N/A

Transactions
NA

Other Notes

Order of Battle (Lithuanian Navy) end of Q2 1939
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Coast Defense Ships:..........0(0)0
Destroyers:.......................5(0)0
Minelayers:.......................1(0)0
Submarines:.....................1(0)0
Patrol Gunboats:................4(0)0
Mine sweepers:.................1(0)0
Motor Torpedo Boats:........20(0)0
Auxiliary Icebreakers:.........2(0)0
Tugboats:.........................2(0)0

Summary
Construction continues on new naval base in Palanga (to replace base in Klaipeda lost to the Germans).