Q1, 1937
Industrial Allocation
- 0/2 factories producing 0t materials.
- 2/2 factories producing 0.2 IP infrastructure (dedicated)
- 2,000t from stockpile.
- 2,000t used, 0t to stockpile.
Infrastructure Development
0.2 IP to new Type 1 Slip at Palanga.
Naval Construction
at Klaipeda:
D1: ML-1 Jotvingis laid down on October 1st, 1936. 500 tons added in Q1/37. 1200 tons total required; 0 remaining until completion. Ship launches on February 3rd.
S1: DD-5 Aukstatis laid down on October 1st, 1936. 1,000 tons added in Q4/36. 2300 tons total required; 0 remaining until completion. Ship launches on February 15th.
S0: Idle
S0: Submarine S-1 laid down January 1st, 1937. 500 tons added in Q1/37. 500 tons total required; 0 remaining until completion. Ship launches on April 30th.
at Palanga:
D2: (under construction by Germans)
S1: (under construction by Lithuanians)
From factories:
N/A
Dockside:
N/A
On Trials
- DD-3 Gediminaiciu Stulpai on trials from November 1st, 1936, to April 1st, 1937.
- DD-4Tautiska giesme on trials from November 1st, 1936, to April 1st, 1937.
Transactions
NA
Other Notes
Order of Battle (Lithuanian Navy) end of Q1 1937
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Coast Defense Ships:..........0(0)0
Destroyers:.......................4(0)1
Minelayers:.......................0(0)1
Submarines:.....................0(0)1
Patrol Gunboats:................4(0)0
Mine sweepers:.................1(0)0
Motor Torpedo Boats:........20(0)0
Auxiliary Icebreakers:.........2(0)0
Tugboats:.........................2(0)0
Summary
Destroyer Leader Aukstatis and minelayer Jotvingis launched in Klaipeda. Submarine S1 laid down in Klaipeda. Construction begins on new naval base in Palanga (to replace base in Klaipeda lost to the Germans).