You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, December 29th 2012, 7:37pm

Kingdom of Greece Q4/1942

[SIZE=5]Q4 1942[/size]

[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 4t from Stockpile
- 3,750t in from Transactions
- 0t out in Transactions
- 13,754t Total materials available
- 13,274t used
- 480t stored for Q1/1943

[size=3]Infrastructure Development[/size]
Souda Bay:
- 0.5 IP (dedicated) + 0.5 IP (year end bonus) added to construct Type 3 Drydock at Souda Bay. 2.0 IP remaining.

[SIZE=3]Naval Construction[/SIZE]

Attica:
D3: Idle
D3: - C-41 ex-Chapra Construction resumes July 1st, 1942. 10,183 tons required; 1333 / 10183 added Q4/42 for a total 2663 / 10183. 7,520 tons remaining.
D2: Idle
S2: - C-43 Hephaestus laid down July 2nd, 1942. 9,000 tons required; 1700 / 9000 added Q4/42 for a total 2700 / 9000. 6,300 tons remaining.
S2: - C-44 Dionysis laid down July 1st, 1942. 9,000 tons required; 1700 / 9000 added Q4/42 for a total 2700 / 9000. 6,300 tons remaining.
S2: - C-45 Hera laid down July 3rd, 1942. 9,000 tons required; 1700 / 9000 added Q4/42 for a total 2700 / 9000. 6,300 tons remaining.
S1: Idle
S0: - X-217 and X-218 laid down October 2nd, 1942. 360 tons required; 360 / 360 added Q4/42 for a total 360 / 360. 0 tons remaining. Completes November 4th, 1942. Begins trials November 5th, 1942. Completes trials December 6th, 1942.
S0: - X-219 and X-220 laid down October 2nd, 1942. 360 tons required; 360 / 360 added Q4/42 for a total 360 / 360. 0 tons remaining. Completes November 4th, 1942. Begins trials November 5th, 1942. Completes trials December 6th, 1942.

Dockside:
- C-40 Artemis laid down October 4th, 1941. 15,000 tons required; 1875 / 15000 added Q4/42 for a total 9375 / 15000. 5,625 tons remaining. Ship launched July 22nd, 1942.
- Fleet Support Tanker Apollonis laid down April 4th, 1942. 1,950 tons required; 487.5 / 1950 added Q4/42 for a total of 1462.5 / 1950. 487.5 tons remaining. Ship launched August 16th, 1942.

Paros:
D1: Idle
D0: Idle

Dockside:
- Fleet Tug Boat T4202 laid down April 3rd, 1942. 685 tons required; 171 / 685 added in Q4/42 for a total of 513 / 685. 172 tons remaining. Launched July 30th, 1942.

Patra:
D1: Idle
S1: Idle
D0: Idle

Dockside:
- Fleet Support Tanker Cephisso laid down April 4th, 1942. 1,950 tons required; 487.5 / 1950 added Q4/42 for a total of 1462.5 / 1950. 487.5 tons remaining. Ship launched August 16th, 1942.

Salamis:
D1: Idle

Dockside:
- Begin Major Refit for Life Extension Purposes of 8 Delphinos class Submarines (S-39 through S-46) on October 1st, 1942. 970 tons required; 970 / 970 added in Q4/42 for a total of 970 / 970. 0 tons remaining. Completes on November 16th, 1942. Post refit trials begin Novermber 18th, 1942. Completes trials December 18th, 1942.
- Fleet Tug Boat T4203 laid down April 3rd, 1942. 685 tons required; 171 / 685 added in Q4/42 for a total of 513 / 685. 172 tons remaining. Launched July 30th, 1942.

Souda Bay:
D4: Idle
D3: - Under construction. Began April 1st, 1942. 4.0 IP required; 1.0 / 4.0 added in Q4/42 for a total of 2.0 / 4.0. 2.0 IP remaining.
S2: Idle
D2: Idle
D1.5: Idle
D1.5: Idle
D1.5: Idle

Dockside:

Thessaloniki:
D0: Idle
S0: - Small Landing Craft (SLC) #11 and #12 (65t each) laid down October 2nd, 1942. 130 tons required; 130 / 130 added in Q4/42 for a total 130 / 130. 0 tons remaining. Completes November 3rd, 1942. Begins trials November 4th, 1942. Completes trials December 5th, 1942.
- Small Landing Craft (SLC) #13 and #14 (65t each) laid down November 10th, 1942. 130 tons required; 130 / 130 added in Q4/42 for a total 130 / 130. 0 tons remaining. Completes December 11th, 1942. Begins trials December 12th, 1942. Completes trials January 13th, 1943.
S0: Idle

Dockside:
- Fleet Tug Boat T4201 laid down April 3rd, 1942. 685 tons required; 171 / 685 added in Q4/42 for a total of 513 / 685. 172 tons remaining. Launched July 30th, 1942.

Volos:
D1: Idle

Dockside:

Limassol:
D3: - C-42 ex-Chiplun Construction resumes July 1st, 1942. 10,183 tons required; 1333 / 10183 added Q4/42 for a total 2663 / 10183. 7,520 tons remaining.
D1: Idle

Dockside:

From factories:
- HL-19 HL65 class 65t Harbour Launch/Net Tender
- HL-20 HL65 class 65t Harbour Launch/Net Tender
- HL-21 HL65 class 65t Harbour Launch/Net Tender

On Trials:
- C-37 Hydra Begins trails April 12th, 1942. Completes trails October 12th, 1942.
- B-2 Salamis Begins post-refit trials April 20th, 1942. Completes trials October 20th, 1942.
- B-3 Navarino Begins post-refit trials April 20th, 1942. Completes trials October 20th, 1942.
- Nestor class Destroyers D-64 through D-73 Began post refit trials on July 24th, 1942. Completed trials October 24th, 1942.
- L-5 Karcharías Began trials June 30th, 1942. Completes trials December 30th, 1942.
- L-6 Tombazis Began trials June 30th, 1942. Completes trials December 30th, 1942.
- C-39 Apollo Begins trials September 30th, 1942. Completes trials March 31st, 1943.
- L-7 MiaouIis Begins trials Semtember 30th, 1942. Completes trials March 31st, 1943.
- L-8 Kodrington Begins trials September 30th, 1942. Completes trials March 31st, 1943.
- M-14 Ligeia Begins trials September 30th, 1942. Completes trials March 31st, 1943.
- M-15 Leucosia Begins trials September 30th, 1942. Completes trials March 31st, 1943.

[size=3]Transactions[/size]
- Received 1,750t from China towards purchase of 6 Athinai class Escort Cruisers and 6 Deliyannis class Destroyers. Payment 2 of 4.
- Received 2,000t from Mexico towards purchase of 17 total destroyers of the Doxa, Kondouriotis, and Makriyannis class. Payment 2 of 3.

[size=3]Other Notes[/size]
- 6 Nemesis class Submarines decommissioned and transferred to the Imperial Brazilian Navy.

[size=3]Order of Battle (Greek Navy) end of Q3 1942[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Fleet Combatants
Battleships 5(0)+0
Heavy Cruisers 3(0)+3
Medium Cruisers 2(0)+0
Light Cruisers 16(0)+3
Aircraft Carriers 2(0)+0
Flotilla Leaders 8(0)+0
Class "A" Destroyers 52(0)+0
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 13(8)+0
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 12(0)+0

Small Combatants
Subchasers (150t) 56(0)+0
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (165t) 0(0)+0
Harbour Launches (65t) 18(0)+3
MTB 96(0)+0
MGB 27(0)+0
MMS 22(0)+0

Auxiliaries
Special transports 5(0)+0
Large Landing Craft (200t) 48(0)+4
Small Landing Craft (65t) 12(0)+4
Tenders 4(0)+0
Fleet Train 6(0)+2
Fleet Tugs 0(0)+3
Harbour Tugs 0(0)+0

Training Squadron
Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0

This post has been edited 4 times, last edit by "Sachmle" (Dec 29th 2012, 9:54pm)