[SIZE=5]Q4 1942[/size]
[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 4t from Stockpile
- 3,750t in from Transactions
- 0t out in Transactions
- 13,754t Total materials available
- 13,274t used
- 480t stored for Q1/1943
[size=3]Infrastructure Development[/size]
Souda Bay:
- 0.5 IP (dedicated) + 0.5 IP (year end bonus) added to construct Type 3 Drydock at Souda Bay. 2.0 IP remaining.
[SIZE=3]Naval Construction[/SIZE]
Attica:
D3: Idle
D3: - C-41 ex-Chapra Construction resumes July 1st, 1942. 10,183 tons required; 1333 / 10183 added Q4/42 for a total 2663 / 10183. 7,520 tons remaining.
D2: Idle
S2: - C-43 Hephaestus laid down July 2nd, 1942. 9,000 tons required; 1700 / 9000 added Q4/42 for a total 2700 / 9000. 6,300 tons remaining.
S2: - C-44 Dionysis laid down July 1st, 1942. 9,000 tons required; 1700 / 9000 added Q4/42 for a total 2700 / 9000. 6,300 tons remaining.
S2: - C-45 Hera laid down July 3rd, 1942. 9,000 tons required; 1700 / 9000 added Q4/42 for a total 2700 / 9000. 6,300 tons remaining.
S1: Idle
S0: - X-217 and X-218 laid down October 2nd, 1942. 360 tons required; 360 / 360 added Q4/42 for a total 360 / 360. 0 tons remaining. Completes November 4th, 1942. Begins trials November 5th, 1942. Completes trials December 6th, 1942.
S0: - X-219 and X-220 laid down October 2nd, 1942. 360 tons required; 360 / 360 added Q4/42 for a total 360 / 360. 0 tons remaining. Completes November 4th, 1942. Begins trials November 5th, 1942. Completes trials December 6th, 1942.
Dockside:
- C-40 Artemis laid down October 4th, 1941. 15,000 tons required; 1875 / 15000 added Q4/42 for a total 9375 / 15000. 5,625 tons remaining. Ship launched July 22nd, 1942.
- Fleet Support Tanker Apollonis laid down April 4th, 1942. 1,950 tons required; 487.5 / 1950 added Q4/42 for a total of 1462.5 / 1950. 487.5 tons remaining. Ship launched August 16th, 1942.
Paros:
D1: Idle
D0: Idle
Dockside:
- Fleet Tug Boat T4202 laid down April 3rd, 1942. 685 tons required; 171 / 685 added in Q4/42 for a total of 513 / 685. 172 tons remaining. Launched July 30th, 1942.
Patra:
D1: Idle
S1: Idle
D0: Idle
Dockside:
- Fleet Support Tanker Cephisso laid down April 4th, 1942. 1,950 tons required; 487.5 / 1950 added Q4/42 for a total of 1462.5 / 1950. 487.5 tons remaining. Ship launched August 16th, 1942.
Salamis:
D1: Idle
Dockside:
- Begin Major Refit for Life Extension Purposes of 8 Delphinos class Submarines (S-39 through S-46) on October 1st, 1942. 970 tons required; 970 / 970 added in Q4/42 for a total of 970 / 970. 0 tons remaining. Completes on November 16th, 1942. Post refit trials begin Novermber 18th, 1942. Completes trials December 18th, 1942.
- Fleet Tug Boat T4203 laid down April 3rd, 1942. 685 tons required; 171 / 685 added in Q4/42 for a total of 513 / 685. 172 tons remaining. Launched July 30th, 1942.
Souda Bay:
D4: Idle
D3: - Under construction. Began April 1st, 1942. 4.0 IP required; 1.0 / 4.0 added in Q4/42 for a total of 2.0 / 4.0. 2.0 IP remaining.
S2: Idle
D2: Idle
D1.5: Idle
D1.5: Idle
D1.5: Idle
Dockside:
Thessaloniki:
D0: Idle
S0: - Small Landing Craft (SLC) #11 and #12 (65t each) laid down October 2nd, 1942. 130 tons required; 130 / 130 added in Q4/42 for a total 130 / 130. 0 tons remaining. Completes November 3rd, 1942. Begins trials November 4th, 1942. Completes trials December 5th, 1942.
- Small Landing Craft (SLC) #13 and #14 (65t each) laid down November 10th, 1942. 130 tons required; 130 / 130 added in Q4/42 for a total 130 / 130. 0 tons remaining. Completes December 11th, 1942. Begins trials December 12th, 1942. Completes trials January 13th, 1943.
S0: Idle
Dockside:
- Fleet Tug Boat T4201 laid down April 3rd, 1942. 685 tons required; 171 / 685 added in Q4/42 for a total of 513 / 685. 172 tons remaining. Launched July 30th, 1942.
Volos:
D1: Idle
Dockside:
Limassol:
D3: - C-42 ex-Chiplun Construction resumes July 1st, 1942. 10,183 tons required; 1333 / 10183 added Q4/42 for a total 2663 / 10183. 7,520 tons remaining.
D1: Idle
Dockside:
From factories:
- HL-19 HL65 class 65t Harbour Launch/Net Tender
- HL-20 HL65 class 65t Harbour Launch/Net Tender
- HL-21 HL65 class 65t Harbour Launch/Net Tender
On Trials:
- C-37 Hydra Begins trails April 12th, 1942. Completes trails October 12th, 1942.
- B-2 Salamis Begins post-refit trials April 20th, 1942. Completes trials October 20th, 1942.
- B-3 Navarino Begins post-refit trials April 20th, 1942. Completes trials October 20th, 1942.
- Nestor class Destroyers D-64 through D-73 Began post refit trials on July 24th, 1942. Completed trials October 24th, 1942.
- L-5 Karcharías Began trials June 30th, 1942. Completes trials December 30th, 1942.
- L-6 Tombazis Began trials June 30th, 1942. Completes trials December 30th, 1942.
- C-39 Apollo Begins trials September 30th, 1942. Completes trials March 31st, 1943.
- L-7 MiaouIis Begins trials Semtember 30th, 1942. Completes trials March 31st, 1943.
- L-8 Kodrington Begins trials September 30th, 1942. Completes trials March 31st, 1943.
- M-14 Ligeia Begins trials September 30th, 1942. Completes trials March 31st, 1943.
- M-15 Leucosia Begins trials September 30th, 1942. Completes trials March 31st, 1943.
[size=3]Transactions[/size]
- Received 1,750t from China towards purchase of 6 Athinai class Escort Cruisers and 6 Deliyannis class Destroyers. Payment 2 of 4.
- Received 2,000t from Mexico towards purchase of 17 total destroyers of the Doxa, Kondouriotis, and Makriyannis class. Payment 2 of 3.
[size=3]Other Notes[/size]
- 6 Nemesis class Submarines decommissioned and transferred to the Imperial Brazilian Navy.
[size=3]Order of Battle (Greek Navy) end of Q3 1942[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Fleet Combatants
Battleships 5(0)+0
Heavy Cruisers 3(0)+3
Medium Cruisers 2(0)+0
Light Cruisers 16(0)+3
Aircraft Carriers 2(0)+0
Flotilla Leaders 8(0)+0
Class "A" Destroyers 52(0)+0
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 13(8)+0
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 12(0)+0
Small Combatants
Subchasers (150t) 56(0)+0
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (165t) 0(0)+0
Harbour Launches (65t) 18(0)+3
MTB 96(0)+0
MGB 27(0)+0
MMS 22(0)+0
Auxiliaries
Special transports 5(0)+0
Large Landing Craft (200t) 48(0)+4
Small Landing Craft (65t) 12(0)+4
Tenders 4(0)+0
Fleet Train 6(0)+2
Fleet Tugs 0(0)+3
Harbour Tugs 0(0)+0
Training Squadron
Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0
This post has been edited 4 times, last edit by "Sachmle" (Dec 29th 2012, 9:54pm)