A. Industrial Allocation
10/30 factories (non fixed) to naval materials: 10,000 tons created for Q3/1927 plus 430 tons stockpiled from Q2/27 plus 1,830 tons transfered from Chile in Q2/1927 for "12,260" total tons.
12,260 tons used for ship building, 0 tons stockpiled for next quarter.
15/30 factories (fixed) to infrastructure development: 1.5 points for Q2/1927
5/30 factories (non fixed) to infrastructure development: 0.5 points for Q2/1927
Total 2.0 infrastructure points created
B. Infrastructure Development
2.0 points added to ports at Phelleus, Lycabettus, Cleito, Maracaibo and Illissus
0.5 points added to 1 type 2 slip at Duecalion
0.5 points added to 1 type 1 slip at Illissus
0.5 points added to 1 type 1 slip at Illissus
0.3 points added to 1 type 0 slip at Maracaibo
0.2 points added to 1 type 0 slip at Maracaibo
C. Naval Construction
At Cleito Type 4 port (7/9)
Class 4 Slip #1 -CV Alioth building, 7000 tons used, 1000 tons added
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - completed
Class 0 Slip #3 - completed
Class 0 Slip #4 - completed
5x 22 ton Landing Craft Infantry
At Eridanus Type 4 port (8/9)
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
5x 22 ton Landing Craft Infantry
At Duecalion type 3 port (6/7)
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - under construction, 1.0 points used, 0.5 points added
Class 2 Drydock #1 - Idle
AC Cape Verde
moved from drydock freefloating
At Illissus type 3 port (7/7)
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Chilean CL Atacama building, 9,747 tons needed, 5,490 tons used, 1830 tons added
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - begins construction, 0.5 points added
Class 1 Slip #4 - begins construction, 0.5 points added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
5x 22 ton Landing Craft Infantry
At Phelleus type 5 port (9/11)
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - completed
Class 0 Slip #4 - completed
AC Venezuela
moved from drydock freefloating
At Lycabettus type 4 port (8/9)
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - CA Medusa begins convertion (rebuild) to CL, 3,748 tons needed, 1644 tons used, 1,000 tons added
Class 2 Drydock #2 - CA Minotaur begins convertion (rebuild) to CL, 3,748 tons needed, 1644 tons used, 1,000 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - Idle
5x 22 ton Landing Craft Infantry
At Maracaibo type 3 port (5/7)
Class 3 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - begins construction, 0.3 points added
Class 0 Slip #4 - begins construction, 0.2 points added
At Safi type 2 port (4/5)
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - Idle
Launched ships/freefloating ships being completed:
CA Astyanax completed, begin trials
CA Sarpedon completed, begin trials
CL Ares, 7,973 tons needed, 6,000 tons used, 1,000 tons added
CL Oceanus, 7,973 tons needed, 6,000 tons used,1,000 tons added
CL Persephone, 7,973 tons needed, 6,000 tons used,1,000 tons added
CL Artemis, 7,973 tons needed, 6,000 tons used,1,000 tons added
Transports Scythia, Nineveh, Gadir and Tanais refitting, 1305 tons needed for each, 500 tons added to Scythia, Nineveh, Gadir, 490 tons added to Tanais (1,990 total this quarter)
MPSS ship Efficax, 7,914 tons needed, 6,914 tons used, 1000 tons added
AC Venezuela converting to training ship, 4,800 tons needed, 3,903 tons used,
construction halted , moored at Phelleus
AC Cape Verde converting to training ship, 4,800 tons needed, 3,903 tons used,
construction halted , moored at Duecalion
Ships completed and on trials
BB Aggamemnon converted to gunnery training ship, on trials
CA Astyanax completed, begin trials
CA Sarpedon freefloating, begin trials
Admiraly type 1 destroyers Uproar, Upstart, Upstage, Unruly, Uncouth, Unorthodox, Unity and Underhand on trials
Summary of ship building/repairs/rebuilds and convertions.
AC's Cape Verde and Venezuela converting to training ships, work suspended.
CV Alioth building
CA's Astyanax and Sarpedon launched, building
CL #1 building for Chile, name unavailable at present
4xAres class CL's building
MPSS Efficax building
D. Transactions
Float Plane Carriers Praia and Mindelo sold to Chile
Subchasers SC 1-12 sold to Chile
675 tons recieved from Chile for payment of Floatplane Carrier and Subchaser Purchase.
Total cost is 2700 tons of materials
Deal made to purchase a pair of floatplane carriers and 12 subchasers from Atlantis. Delivery of items:
AV-1 Michimalonco (ex Praia) delivered.
SC 1-6 delivered.
AV-3 Lautaro (ex-Mindelo)= delivered
SC 7-12 delivered
Second deal with Atlantis for a trio of "light cruisers" with the potential for a pair of "heavy cruisers" based on the same hull. 1,830 tons of material transfered to Atlantis for the building down of "light cruiser" (CL-6). Second "light cruiser" will be built locally. Third will be built in Atlantis. Should the "heavy cruisers" come about, the first will be built in Atlantis, the second in Chile.
E. Other Notes
BB Aggamemnon and AC's *Cape Verde and *Venezuela converting to gunnery training ships.
*conversions susspended
F. Updated Order of Battle, 7/1/27
Note:
Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB: 9(1)0 * BB Aggamemnon converting to gunnery training ship *
BC: 2(0)0
CV: 3(0)1
CA: 12(0)2
CAE:0(0)0
CL: 49(0)4
DD: 122(
0
Training ships: 0(1)0 * BB Aggamemnon converting to gunnery training ship *
Torpedo boats: N/A
Sloops: N/A
Frigates: N/A
Moniters:2(0)0
Torpedo gunboats: 32(0)0
Gunboats: 12(0)0
Patrol vessels: 50(0)0
Mine sweepers: 24 (0) 0
Sub chasers: 312(0)0
Motor torpedo boats: 0(0)0
Fleet Submarine: 20(0)0
Coastal Submarine: 72(0)0
Floatplane carrier/tenders: 2(0)0
Destroyer depot ships: 2(0)0
Submarine depot ships: 3(0)1
Repair ships 2(0)0
Transports: 6(4)0
Landing Craft Infantry 0(0)20
Infantry launches 38(0)0
Auxillary's N/A