Persia, Q2 1944
Industrial Allocation
1 factories allocated to building warship material
2 factories allocated to production of infrastructure materials
1,000 t produced + 2,051 t stockpiled = 3,051 t available
1,256 t used
1,795 t stockpiled
0.2 + 0.0 bonus IP produced.
Infrastructure Development
0.2 IP used as expansion of Bandar-e Abbas D0-A to D1 continues; 0.5 IP to go.
Construction
At Bushehr (Persian Gulf)
D1: Idle
Free-floating:
Nada
At Bandar-e Abbas (Strait of Hormuz)
S1-A: DD Chabahar receives 500 t, launched, to complete 11/44
S1-B:
S0-A: ASW Launch SC-12 built, receives 100 t
S0-B: E-Boat MTB-34 built, receives 105 t, completed.
S0-C:
D2.5: CL Babr begins scrapping; some material due 4/44
D0-A: [Expanding]
D0-B: Idle
Free-floating:
Sloop Gorg receives 300 t, to complete 7/44
Minesweeper M-11 receives 200 t, completed 5/44
At Bandar-e Anzali (Caspian Sea)
S1: Idle
D1: Idle
Built in factories
2 x 8 t LCVP built
1 x 35 t LCM built
Transactions:
Nothing
Other points of interest
CL Shir deleted from service - to scrap, later 1944..
TB Tehran, Baluchistan deleted from service - to scrap, 1945.
Minesweeper M-1 deleted from service - assuming she hasn't been already.
Updated Order of Battle, End of Quarter
Completed (Under Repair or Refit) + Under Construction
Heavy Cruisers (CA): 1(0) + 0
Light Cruisers (CL): 2(0) + 0
Destroyers (DD): 9(0) + 1
Torpedo Boats (TB): 11(0) + 0
Motor Torpedo Boats (MTB): 66(0) + 0
Submarines (SS): 9(0) + 0
Gunboats and Gunships (GB/GS): 2(0) + 0
Sloops and Escorts (SL/DE): 7(0) + 1
Submarine Chasers (SC): 12(0) + 0
Patrol Boats (PB): 20(0) + 0
Minesweepers (AM): 9(0) + 0
Harbour Tug (AT): 4(0) + 0
Amphibious Forces (AP): 2(0) + 0
Tenders (AD): 4(0) + 0
LCM: 1(0) + 0
LCVP: 2(0) + 0