*To be revised if nessassary*
A. Industrial Allocation
3/6 factories to naval materials: 3,000 tons created for Q2/1926 + 48 tons stockpiled from Q1/26 = 3048 tons, 3040 tons used, 8 tons stockpiled for next quarter
2/6 factories (fixed) to infrastructure development: 0.2 points for Q2/1926
1/6 factories (non-fixed) to infrastructure development: 0.1 points for Q2/1926
B. Infrastructure Development
0.0 points put into new factory # 7, 9.2 points needed, 0.8 points used, 0.0 points added, construction suspended
0.3 points put into upgrading Type 2 port at Istambul, 0.9 points needed, 0.1 points used
C. Naval Construction
Istambul Type 2 port (4/5)
type 2 drydock #1 - upgrading to type 3
type 1 drydock #1 - PB 7 building, 303 tons needed, 130 tons used , 130 tons added
type 0 slip #1 - PB 8 building, 303 tons needed, 130 tons used, 130 tons added
type 0 slip #2 - PB 9 laid down, 303 tons needed, 130 tons used, 130 tons added
Izmit Type 3 Port
type 3 drydock #1 - Idle
type 1 drydock #1 - PB 10 building, 303 tons needed, 130 tons used, 130 tons added
Samsun
type 3 drydock #1 - completes upgrade from type 2
type 0 drydock #1 - PB 5 building, 173 tons needed, 260 tons used, 130 tons added
type 0 drydock #2 - PB 6 building, 173 tons needed, 260 tons used, 130 tons added
Icel Type 1 Port (3/3)
type 0 slip #1 - PB 11 laid down, 303 tons needed, 130 tons used, 130 tons added
type 0 slip #2 - PB 12 laid down, 303 tons needed, 130 tons used, 130 tons added
type 0 drydock #1 - Idle
Trabzon Type 1 port (1/3)
type 1 drydock #1 - Idle
Launched ships being completed:
Patrol boats PB 1-4
Patrol boats PB 5-12 building
Ships completed and on trials
4x Turkish Bush-class minesweepers on trials
Summary of ship building/repairs/rebuilds and convertions.
AC Ulic Ali Reis undergoing rebuild in Italian yard
4x Turkish Bush-class minesweepers complete trials
Patrol boats PB 1-4 on trials
Patrol boats PB 5-12 building
D. Transactions
Transfer of 1000 tons of warship Materials to Italy for rebuild of AC Ulic Ali Reis
BB Dante Alighieri and AC San Marco leased from Italy, total cost to be payed by the end of Q4/26 is 2,992 tons of warship materials, 1000 tons transfered this quarter.
Total of 2000 tons transfered to Italy this Quarter.
Summary of deals with Italy
Ulic Ali Reis rebuild, cost: 6312, ammount payed as of this quarter: 3000
BB/AC lease deal, Cost 2992, Ammount payed as of this quarter: 2000
Total amount owed: 9304, total amount payed as of this quarter: 5000
E. Other Notes
4x Turkish Bush-class minesweepers complete trials.
Armoured cruiser Muin-I-Zaffer scrapping
Gunboats Marmaris and Malatia scrapping
F. Updated Order of Battle, 1/4/26
Note:
Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB: 2(0)0 *Dante Alighieri leased from Italy*
BC: 1(0)0
PD: 2(0)0
AC: 1(1)0 *San Marco leased from Italy*
CA: 0(0)0
CL: 6(0)0
DD: 16(0)0
Torpedo boats: 6(0)0
Sloops: 7(0)0
Frigates: 0(0)0
Moniters:0(0)0
Torpedo gunboats: 0(0)0
Gunboats 8(0)0
Patrol vessels 4(0)8
Mine sweepers 6(0)0
Sub chasers 24(0)0
Motor Launches 9(0)0
Fleet Submarine: 0(0)0
Coastal Submarine:0(0)0
Floatplane carrier/tenders 0(0)0
destroyer depot ships 2(0)0
Submarine depot ships 0(0)0
Auxillary's N/A