You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, December 19th 2004, 11:35pm

Philippines Q4/25

Added ship names...


Marina de Filipinas
1925 Fourth Quarter Report
1 October-31 December


A. Factories

6/11 factories = 6,000t of material + 6t stockpiled + 958t from scrapping = 6,964t available
6464t are used, and 500t transferred, leaving a stockpile of 0t.
(680t transferred in placed directly to contracted rebuild)

5/11 factories (committed) = 0.5 infrastructure pts + 0.5 bonus points
0/11 factories (flexible) = 0.0 pts = 1.0 pts available

B. Infrastructure Development

Completed Type 2 slip at Butuan
0.7 points alotted = 2 total/2 needed = complete

Began construction of Factory #12. 0.3 points added. Current status: 0.3 points.

C. Naval Development and Construction

at Manila:
S4: BC Samal receives 2324t, balance 18535t, completes 6 Mar 28
S3: idle
S1: idle
D2: PD Fernando begins refit 26 Dec; receives 46t, balance 3348t, completes 1 Jun 26
D1: DD Irrequieto begins refit 9 Oct; receives 186t, completed 18 Dec
Dockside: DD Martinete receives 26t, commissioned 16 Oct
Dockside: GB Bataan launched 1 Oct; receives 158t, commissioned 16 Nov

at Butuan:
S2: idle
S1: idle
S0: idle
S0: idle
S0: SC Alta laid down 1 Oct; receives 199t, balance 85t, completes 10 Feb 26
S0: SC Baja laid down 1 Nov; receives 136t, balance 148t, completes 10 Mar 26
D3: CL Cíudad Rodrigo refitting; receives 907t, completed 26 Dec
Dockside: SC Colorado launched 1 Oct; receives 85t, commissioned 10 Nov

at San Fernando:
S2: idle
D1: Chinese PC Ying Jui begins rebuild 1 Oct; receives 680t, balance 638t, completes 27 Mar 26
D0: idle
Dockside: CDS Panabo receives 1657t, balance 1604t, completes 19 May 26
Dockside: All five Ajo-class DE receive 2 x .50 MG @ 1t each = 5t

at Puerto Princesa:
S0: GB Kudarat laid down 1 Oct; receives 320t, balance 156t, completes 15 Feb 26
Dockside: GB Isabela launched 26 Jul; receives 33t, commissioned 16 Oct

Commericial shipyards:
one 191t coastal minesweeper, one 191t minelayer

D. Transactions

500 tons of material transferred to Italy to build 10 MAS da 38m torpedo boats.

680 tons of material received from China to rebuild PC Ying Jui.

E. Other Notes

CL Cíudad Rodrigo renamed Calayan

Ships laid down this quarter: one gunboat and two subchasers.

DD Rabijunco, SC Sierra, AO Bambu complete shakedown cruises.

DD Insidioso, Impavido complete post-refit shakedown.

DD Cormorán continues shakedown cruise.

DD Martinete, GB Isabela, Bataan, SC Colorado, ML Norte, MS
Tifãn begin shakedown cruises.

CL Calayan, DD Irrequieto begin post-refit shakedown.

TB T-M11 to T-M20 on shakedown in the Mediterranian, begin transport home January.

F. Scrappage Report

647 tons of material recovered from scrapping will become available in Q1/26
881 tons of material recovered from scrapping will become available in Q2/26

Stockpiled Guns
in turrets: 1 2x6" Mk 12
singles: 8 x 6" Mk VI, 16 x 3" Mk VI

G. Updated Order of Battle, 31 December 1925

Note: X(Y)+Z = completed (under repair/refit) + under construction

Second class battleships 2(1)+0
Coast defense battleships 0(0)+1
Battlecruisers 1(0)+1
Armoured cruisers 1(0)+0
Light cruisers 1(0)+0
Escort cruisers 3(0)+0
Destroyers 8(0)+0
Destroyer Escorts 9(0)+0
Subchasers 2(0)+2
Submarines 1(0)+0
Torpedo boats 3(0)+0
Fast torpedo craft 20(0)+0 (+20 on order from Italy)
Gunboats 3(0)+1
Patrol boats 2(0)+0
Assault Transports 0(0)+1 building in Japan
Minesweepers (coastal) 10(0)+0
Minelayers 3(0)+0
Oilers 1(0)+0

------------