Poland Q4 1936
A. Factories
3/4 factories = 3000t produced + 27t stockpiled + 925t transferred = 3952t
3938t used, 14t stockpiled
1/4 factories (committed) = 0.1IP’s + 0.1 Bonus IP's
0/4 factories (flexible)
B. Infrastructure Development
Factory P5 (.1IP used, 2.2IP to complete)
C. Naval Development and Construction
at Danzig:
1 Type 2 slip Idle
1 Type 1 slips Idle
1 Type 1 slips Idle
1 Type 0 slips SS A2 laid down September 01 36, launched October 23 36, 271t used (127t to complete)
1 Type 0 slips SS A3 laid down September 01 36, launched October 23 36, 271t used (127t to complete)
Type 1 drydock DD Pilsudski 3 laid down September 01 36, 617t used (1730t to complete)
Free Floating: DD Pilsudski 1 laid down January 01 36, launched July 01 36, 496t used (0t to complete) completed December 01 36
at Koszalin
1 Type 1 slips Idle
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 3 drydock BC Mindano laid down February 01 35, 787t used (15990t to complete)
Type 0 drydocks idle
Free Floating: DD Pilsudski 2 laid down January 01 36, launched July 01 36 496t used (0t to complete) complete December 01 36
D. Transactions
1000t transferred to Romania
925t from Philippines for BC Mindano. 787 applied to ship, rest as rental fees
MTB 11 to 15 transferred from Italy
E. Other Notes
A1 Submarine finished shake-down cruise.
Peggy Brown 7 and 8 finished shake-down cruise.
Ships laid down this quarter: DD Pilsudski 3, SS A2
F. Scrappage Report
none
G. Updated Order of Battle, 31 December 1936
Note: (Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
CDBB: 1(0)+0
CA: 2(0)+0
CL: 1(0)+0
DD: 6(0)+1
FTB: 8(0)+0
AG: 3(0)+0
SS: 9(0)+2
MS: 6(0)+0
GB: 2(0)+0
M: 18(0)+0
MTB: 35(0)+10
Note, edited some of the past reports, because I forgot to send ships on shake-down cruise once they were complete.
This post has been edited 2 times, last edit by "TheCanadian" (Nov 8th 2008, 3:02am)