You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, August 27th 2004, 1:18am

Philippines Q3/24

...well sorta. There's some news coming up later in Q3 that the full report would spoil. So I've censored it. ;)

The complete, uncut report will be posted at the end of Q3...

Marina de Filipinas
1924 Third Quarter Report
1 July-30 September


A. Factories

4/11 factories = 4,000t of material + 392t stockpiled + 116t from scrapping = 4,392t available
3522t are used, and 585t transferred, leaving a stockpile of 325t.

7/11 factories (committed) = 0.7 infrastructure pts +
0/11 factories (flexible) = 0.0 pts = 0.7 pts available
0.4 pts are used, and 0.3 pts transferred, leaving a stockpile of 0.0 pts.

B. Infrastructure Development

Completed upgrade of Type 0 drydock at San Fernando to Type 1
0.3 points alotted = completed 19 September

Continued upgrade of Type 1 slip at Manila to Type 4
0.1 points alotted = 1.2 total/3 needed = 1.8 needed to complete

C. Naval Development and Construction

at Manila:
S3: idle
S1: *being upgraded to Type 4*
S1: DD Rabijunco laid down 1 July; receives 400t, balance 1011t, completes 14 Apr 25
-Uses guns from scrapped D-5; one month subtracted from build time-
D2: DD D-5 completes scrapping 8 Jul; recovered 22t this quarter
D1: DD D-7 begins scrapping 15 Jul, recovered 125t, 39t remaining, finishes 23 Oct
Dockside: DD Pelícano receives 375t, balance 61t, completes 16 Oct
Dockside: CB Basilan launched 4 Sept; receives 960t, *CENSORED*

at Butuan:
S1: idle
S0: idle
S0: idle
S0: PB Avispa receives 140t, balance 445t, completes 10 Feb 25
S0: idle
D3: idle
Dockside: DD Alcatraz receives 321t, commissioned 31 Aug
Dockside: PB Abejorro receives 140t, balance 25t, completes 12 Oct
Dockside: DD Zampullín launched 4 Sep; receives 330t, balance 781t, completes 15 Jan 25

at San Fernando:
S2: idle
D1: *CENSORED*
D0: idle
Dockside: DD Águila launched 19 Jul; receives 450t, balance 476t, completes 6 Nov

at Puerto Princesa:
S0: idle
Dockside: SS Tiburón launched 1 Aug; receives 175t, balance 152t, completes 8 Nov
Beached: TB R-6 begins scrapping 9 Jul, recovered 30t, 12t remaining, finishes 26 Oct

Commercial shipyards:
one 191t coastal minesweeper

D. Transactions

0.3 IP transferred to Italy
585 tons of material to transferred to Italy to build AO Bambú.

E. Other Notes

*CENSORED*

Scrappage Report:

*CENSORED*

Ships laid down this quarter
DD Rabijunco (+1 minesweeper)

Ships decommissioned this quarter (not including transfers):
*CENSORED*

Shakedown cruises:
CL Leyte completes 7 July
MS MSC-7 completes 11 July
CL Panay completes 28 July
CL Mindanao completes 12 August
DD Rabihorcado completes 13 August
MS MSC-8 until 1 October
DD Alcatraz until 3 March 25

F. Updated Order of Battle, 30 September 1924

Note: X(Y)+Z = completed (under repair/refit) + under construction

*CENSORED*


------------


2

Friday, September 17th 2004, 12:45am

"And now, the rest of the story"

Marina de Filipinas
1924 Third Quarter Report
1 July-30 September


A. Factories

4/11 factories = 4,000t of material + 392t stockpiled + 116t from scrapping = 4,392t available
3522t are used, and 585t transferred, leaving a stockpile of 325t.

7/11 factories (committed) = 0.7 infrastructure pts +
0/11 factories (flexible) = 0.0 pts = 0.7 pts available
0.4 pts are used, and 0.3 pts transferred, leaving a stockpile of 0.0 pts.

B. Infrastructure Development

Completed upgrade of Type 0 drydock at San Fernando to Type 1
0.3 points alotted = completed 19 September

Continued upgrade of Type 1 slip at Manila to Type 4
0.1 points alotted = 1.2 total/3 needed = 1.8 needed to complete

C. Naval Development and Construction

at Manila:
S3: idle
S1: *being upgraded to Type 4*
S1: DD Rabijunco laid down 1 July; receives 400t, balance 1011t, completes 14 Apr 25
-Uses guns from scrapped D-5; one month subtracted from build time-
D2: DD D-5 completes scrapping 8 Jul; recovered 22t this quarter
D1: DD D-7 begins scrapping 15 Jul, recovered 125t, 39t remaining, finishes 23 Oct
Dockside: DD Pelícano receives 375t, balance 61t, completes 16 Oct
Dockside: CB Basilan launched 13 Sept; receives 960t, *damaged beyond repair 15 Sept*

at Butuan:
S1: idle
S0: idle
S0: idle
S0: PB Avispa receives 140t, balance 445t, completes 10 Feb 25
S0: idle
D3: idle
Dockside: DD Alcatraz receives 321t, commissioned 31 Aug
Dockside: PB Abejorro receives 140t, balance 25t, completes 12 Oct
Dockside: DD Zampullín launched 4 Sep; receives 330t, balance 781t, completes 15 Jan 25

at San Fernando:
S2: idle
D1: idle
D0: idle
Dockside: DD Águila launched 19 Jul; receives 450t, balance 476t, completes 6 Nov

at Puerto Princesa:
S0: idle
Dockside: SS Tiburón launched 1 Aug; receives 175t, balance 152t, completes 8 Nov
Beached: TB R-6 begins scrapping 9 Jul, recovered 30t, 12t remaining, finishes 26 Oct

Commercial shipyards:
one 191t coastal minesweeper

D. Transactions

0.3 IP transferred to Italy
585 tons of material to transferred to Italy to build AO Bambú.

E. Other Notes

"R-1" class torpedo boats reclassified as Destroyers

DD R-10 sunk in firefight with pirates in Spratly Islands in Aug.
AC Mindoro sunk by sabotage 15 Sept.
CB Basilan damaged beyond repair by sabotage 15 Sept.
CL Mindanao constructive total loss by sabotage 15 Sept.

Scrappage Report:
2 x 3" guns recovered from scrapping will become available in Q4
2 x 4" guns recovered from scrapping will become available in Q4
164 tons of material recovered from scrapping will become available in Q4
164 tons of material recovered from scrapping will become available in Q1/25
164 tons of material recovered from scrapping will become available in Q2/25
155 tons of material recovered from scrapping will become available in Q3/25

Ships laid down this quarter
DD Rabijunco (+1 minesweeper)

Ships decommissioned this quarter (not including transfers):
DD D-7
DD R-6

Shakedown cruises:
CL Leyte completes 7 July
MS MSC-7 completes 11 July
CL Panay completes 28 July
CL Mindanao completes 12 August
DD Rabihorcado completes 13 August
MS MSC-8 until 1 October
DD Alcatraz until 3 March 25

F. Updated Order of Battle, 30 September 1924

Note: X(Y)+Z = completed (under repair/refit) + under construction

Acorazados de segunda clase 2(0)+0
Cruceros de batalla 0(0)+0 (+1 incomplete to be scrapped)
Cruceros de primera clase 1(0)+0 (+1 to be scrapped)
Cruceros de segunda clase 4(0)+0 (+1 to be scrapped)
Destructores 12(0)+4
Submarinos 0(0)+1
Torpederos 3(0)+0
Artes de patrulla 0(0)+2
Dragaminas costeros 8(0)+0
Minadores 1(0)+0
Petroleros 0(0)+1 building in Italy


------------