Industrial Allocation
- 8/9 factories producing 8,000t materials.
- 1,574 tons from stockpile.
- 716 tons from scrapping
- 10,290 tons materials total.
- 9,200 tons used.
- 1,090 tons stored for Q3/46.
- 0/9 factories dedicated to infrastructure.
Infrastructure Development
1 factory dedicated to producing infrastructure. 0.1 IP created, added to lengthen S1 slip in Talcahuano.
Naval Construction
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: Light Cruiser
Picunches refitting between October 1st 1945 and July 3rd, 1946. 4598 tons required to complete. 1500 tons added Q2/46 for a total of 4500 / 4598 tons. 98 / 4598 tons remaining.
S3.5: CLAA-16
Araucanía laid down January 1st, 1946. 1,500 tons added Q2/46 for a total of 3000 / 8000 tons. 5000 / 8000 tons remaining. Ship launched July 25th, 1946 and completed on May 31st, 1947.
D2.5: Destroyer
Torres del Paine refitting between April 1st 1946 and June 28th. 1945. 676 tons required to complete. 676 tons added Q2/46 for a total of 676 / 676 tons. 0 / 676 tons remaining. Refit completed.
S2.5: CLAA-17
Los Lagos laid down January 1st, 1946. 1,500 tons added Q2/46 for a total of 3000 / 8000 tons. 5000 / 8000 tons remaining. Ship launched July 25th, 1946 and completed on May 31st, 1947.
D2: Destroyer
Teniente Ibarra refitting between April 1st 1946 and June 19th. 1945. 362 tons required to complete. 362 tons added Q2/46 for a total of 362 / 362 tons. 0 / 362 tons remaining. Refit completed.
S1: Expanding to S1.5, 0.2 of 0.5 IP added at the end of quarter. 0.3 IP remaining.
D0: Idle.
Dockside:
- PA-04
Patria laid down July 1st, 1944. 2,200 tons added Q2/46 for a total of 17600 / 20000 tons. 2400 / 20000 tons remaining. Ship launched June 18th, 1945 and completed on December 1st, 1946.
- Dock landing ship
Disembarkment of Pisagua laid down April 2nd, 1945. 5250 tons required. 850 tons added Q2/1946 for a total of 5250 / 5250. Ship launched September 21st, 1945 and completed on June 8th, 1946.
ASMAR - Astillero de Valparaíso (Valparaiso):
S1: Idle.
S1: Idle.
D1: Destroyer
Teniente Requelme refitting between April 1st 1946 and June 19th. 1945. 362 tons required to complete. 362 tons added Q2/46 for a total of 362 / 362 tons. 0 / 362 tons remaining. Refit completed.
Dockside:
N/A
ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Idle.
S0: Submarine chaser
Cisnes laid down April 1st, 1946. 250 tons added Q2/1946 for a total of 250 / 250. Ship launched May 20th, 1946. Ship completed on August 8th, 1946.
Dockside:
- Submarine chaser
Azopardo laid down January 1st, 1946. 0 tons added Q2/1946 for a total of 250 / 250. Ship launched February 20th, 1946. Ship completed on May 8th, 1946.
ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle.
Dockside:
None
from factories:
- N/A
On Trials
- Cruiser
O'Higgins continues six months of builders trials.
- Submarine
Marlin completes six months of builders trials.
- Submarine
Esturión completes six months of builders trials.
- Submarine
Bonito completes six months of builders trials.
- Subchaser
Tinguiririca completes three months of builder's trials.
Scrapping
- Total tonnage in recycling until Q1/46: (2x179) = 352 tons
- Total tonnage in recycling until Q2/46: (4x179) = 716 tons
Transactions
None
Other Notes
Technology development and investigatory committees are working on the following projects:
- Proyecto-O: Proposed replacement for
Marina Guardia Hyatt.
Six destroyers (
Reserve Hull 011 through
Reserve Hull 016) are disarmed and parked in Talcahuano awaiting free drydocks for scrapping.
Order of Battle (Armada de Chile) June 30th, 1946
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Primary Combatants:
Battlecruisers: 3(0)+0
Aircraft Carriers: 3(0)+1
Heavy Cruiser: 3(0)+0
Light Cruisers: 6(0)+2
Helicopter Cruisers: 1(0)+0
Large Destroyers: 8(0)+0 {3,000 tons std and up}
Medium Destroyers: 50(0)+0 {1,200-3,000 tons std}
Light Destroyers (Corvettes): 8(0)+0 {under 1,200 tons std}
Destroyer Escorts: 14(0)+0
Minelayer: 2(0)+0
Torpedo Boats: 25(0)+0
Submarines: 11(0)+0
Subchasers: 20(0)+1
Minesweepers: 27(0)+0
Arctic Patrol Vessel: 3(0)+0
Fleet Train:
Destroyer Tenders: 4(0)+0
Subchaser Tenders: 2(0)+0
Submarine Tenders: 1(0)+0
General Fleet Tenders: 4(0)+0
Fleet Oilers: 12(0)+0
Colliers: 1(0)+0
Auxiliaries:
Sail Training Sloop: 2(0)+0
Transports: 2(0)+0
Fleet Tugs: 4(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 2(0)+0
Oceanic Research Ship: 1(0)+0
Pilot Boats: 6(0)+0
Training Yawls: 6(0)+0
Amphibious Forces:
Landing Ship Vehicle: 1(0)+0
Landing Ship Dock: 0(0)+1
Beach Discharge Lighter: 1(0)+0
Attack Transports: 4(0)+0
Landing Ship Infantry (Med): 2(0)+0
Landing Ship Tank: 2(0)+0
Landing Ship Mechanized: 2(0)+0
Landing Craft Tank: 2(0)+0
Landing Craft Mechanized: 11(0)+0
Landing Craft Assault: 54(0)+0
Emergency Use:
Patrol Boats: 4(0)+0
Naval Trawlers: 16(0)+0
Transports: 12(0)+0
Museum Ships: 1(0)+0
Foreign Orders and Exports (Totals):
Fleet Tugs: 6(0)+0 (to China)
Light Harbour Tugs: 20(0)+0 (to China)