Dear visitor, welcome to WesWorld.
If this is your first visit here, please read the Help. It explains in detail how this page works.
To use all features of this page, you should consider registering.
Please use the registration form, to register here or read more information about the registration process.
If you are already registered, please login here.
Italy Q3/1929
|
Source code
|
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
|
[SIZE=3][b]Report on Italian naval construction Q3 1929[/b][/SIZE]
Available Factories; 5 producing 5,000t of material
[SIZE=3][b]Ships under construction[/b][/SIZE]
[SIZE=1.5]
Ship Name:Aquila
Laid down:01/07/27 Completion:18/01/30 Launched:08/07/28
Amount built:21000 Amount added:0 Amount Needed:0
Ship Name:Europa
Laid down:01/07/27 Completion:Unknown Launched:08/07/28
Amount built:9000 Amount added:3000 Amount Needed:10092
Ship Name:Graculus - Complete
Laid down:01/07/28 Completion:14/09/29 Launched:24/12/28
Amount built:3000 Amount added:0 Amount Needed:0
Ship Name:Baleno - Complete
Laid down:01/10/28 Completion:12/08/29 Launched:04/02/29
Amount built:1500 Amount added:0 Amount Needed:0
Ship Name:DL-29A
Laid down:01/01/29 Completion:18/12/29 Launched:21/05/28
Amount built:2729 Amount added:0 Amount Needed:0
Ship Name:DL-29B
Laid down:01/01/29 Completion:18/12/29 Launched:21/05/28
Amount built:2729 Amount added:0 Amount Needed:0
Ship Name:DL-29C
Laid down:01/01/29 Completion:18/12/29 Launched:21/05/28
Amount built:1337 Amount added:1392 Amount Needed:0
Ship Name:DL-29D
Laid down:01/01/29 Completion:18/12/29 Launched:21/05/28
Amount built:0 Amount added:608 Amount Needed:2121
Genoa, Ansaldo yard
1 Type 3 Slipway –
1 Type 3 Slipway –
1 Type 3 Drydock -
1 Type 3 Drydock -
Europa
DL-29D
La Spezia Naval yard
1 Type 1 Slipway -
1 Type 1 Drydock -
Taranto Naval Headquarters
1 Type 4 Slipway -
1 Type 4 Drydock -
1 Type 3 Slipway -
1 Type 3 Drydock -
1 Type 3 Drydock -
1 Type 1 Slipway -
1 Type 1 Drydock -
Napoli di Castellammare
1 Type 3 Slipway -
1 Type 3 Drydock -
1 Type 1 Slipway -
1 Type 1 Drydock -
Aquila
Venezia, Naval yard
1 Type 3 Slipway -
1 Type 3 Slipway -
1 Type 3 Drydock -
1 Type 1 Slipway -
1 Type 1 Drydock -
Trieste, Ansaldo yard
1 Type 4 slipway – Pampas (Argentina)
1 Type 4 slipway – Patagonia (Argentina)
Messina, Naval yard
1 Type 4 Drydock -
1 Type 3 Slipway -
1 Type 3 Slipway -
1 Type 3 Drydock -
1 Type 1 Slipway -
DL-29A
DL-29B
Cagliari, Naval yard
Type 3 Drydock -
Type 1 Drydock -
DL-29C [/SIZE]
5 factories produce 5,000t of material
0t used from stockpile
5000tons of material needed
New stockpile of 0tons
13 Factories produce 1.3 Infrastructure points
0.2 Infrastructure points transferred from EAS
1.5pts spent on upgrading Type 2 Port at Massawa
Construction on Type 3 Port of Massawa needs 0.5pts to complete
[b]Fleet Strength[/b]
BB. 8(0)+0
CV. 1(0)+2
CA. 5(0)+0
CL. 33(0)+0
CDA. 4(0)+0
DD. 52(0)+4
TB. 33(0)+0
Submarines. a) 15(0)+0
b) 29(0)+0
Escorts. 20(0)+0
MAS. 157(0)+0
[SIZE=3][b]EAS Q3 1929[/b][/SIZE]
[size=1.5]2 Factories produce 0.2 Infrastructure Points
[b]Massawa[/b] -
1 Type 1 Slipway -
1 Type 1 Drydock -
[b]Mogadishu[/b] -
1 Type 1 Drydock -
1 Trade Protection Cruiser begins shakedown cruise
0.2 Infrastructure points transferred to Italy
Factory No.3 requires 7.0pts to complete
[b]Fleet Strength[/b]
1(0)+0 Cruisers
2(0)+0 Coastal Defence ships[/size]
|