Poland Q3 1936
A. Factories
3/4 factories = 3000t produced + 238t stockpiled =3238t
3211t used, 27t stockpiled
1/4 factories (committed) = 0.1IP’s
0/4 factories (flexible)
B. Infrastructure Development
Factory P5 (.1IP used, 2.4IP to complete)
C. Naval Development and Construction
at Danzig:
1 Type 2 slip Idle
1 Type 1 slips Idle
1 Type 1 slips Idle
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 1 drydock DD Pilsudski 1 laid down January 01 36, launched July 01 36 617t used (496t to complete)
at Koszalin
1 Type 1 slips DD Pilsudski 2 laid down January 01 36, launched July 01 36 617t used (496t to complete)
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 3 drydock BC Mindano laid down February 01 35, 850t used (16777t to complete)
Type 0 drydocks idle
Free Floating: SS A1 laid down April 01 36, launched May 23 36 127t used (0t to complete) complete August 13 36
D. Transactions
1000t transferred to Romania
1000t from Philippines for BC Mindano. 850 applied to ship, rest as rental fees
MTB 6 to 10 transferred from Italy
E. Other Notes
A1 Submarine begins shake-down cruise.
Peggy Brown 7 and 8 continue shake-down cruise.
Ships laid down this quarter: none
F. Scrappage Report
none
G. Updated Order of Battle, 30 September 1936
Note: (Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
CDBB: 1(0)+0
CA: 2(0)+0
CL: 1(0)+0
DD: 4(0)+2
FTB: 8(0)+0
AG: 3(0)+0
SS: 9(0)+0
MS: 6(0)+0
GB: 2(0)+0
M: 18(0)+0
MTB: 30(0)+15
This post has been edited 4 times, last edit by "TheCanadian" (Oct 30th 2008, 6:13am)