German Naval Developments – Q4/29, subject to update
A. Industrial Allocation
Factory Allocation:
Warship Material: 3
Infrastructure (Committed): 23 (Bonus production this quarter = 2.3 pts)
Infrastructure (Non-committed): 0
Warship Material Produced: 3000 t
Stockpile: 3575 t
Recycled Scrap: 0 t
Material Used on Construction: 4400 t
Received from sales: 0t
New Stockpile: 2175t
B. Infrastructure Development
Factory 27 receives 2 points, for 5 total.
Factory 28 receives 2 points, for 5 total.
Type 3 slipway at Kiel upgrade to Type 4 receives 0.4 pts, for 1.0 total, complete.
Type 3 slipway at Cuxhaven upgrade to Type 4 receives 0.3 pts, for 0.3 total.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: PD Hessen conversion to target vessel receives 3000t
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
At Cuxhaven
1 Type 3 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: CL Ersatz Amazone receives 1400t
At Kiel
1 Type 3 slipway: Idle
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slips: Idle
1 Type 0 slip: Idel
1 Type 0 drydock: Idle
D. Transactions
None.
E. Other Notes
CL Liepzig continues her shakedown cruise
S-1, S-2, S-3, S-4 complete their shakedown cruises.
F. Updated Order of Battle, 30/12/29
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
CL: 12(0)+1,
DD: 18(0)+0,
SL: 6(0)+0
AM: 10(0)+0
TB: 4(0)+0
Target: 0(0)+1