You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Saturday, September 10th 2005, 10:20am

Quarterly REport #30 for the SAE

[SIZE=3]SAE Quarterly Reports [/SIZE]

No. 30 – April to June 1928



[SIZE=3]Transfers: [/SIZE]

None


[SIZE=3]Factories:[/SIZE]

26 factories total can be used.

Fixed factories

2 factory will be fixed to produce infrastructure points for 1928.

Flexible factories

839ts material transferred from Q1 (incl. material recovered from scrapyard).

23,857ts material necessary to be produced in this quarter (24 factories).

0 factory will produce infrastructure points this quarter.


Infrastructure points used this quarter:

0,2pts put into a new Type 1 Dock in Victoria for a total of 1,5pts at the end of Q2.


[SIZE=3]Ships: [/SIZE]

Minor vessels

Completed Units

24x UJ26-class ASW launch

10x Flower-class minesweeper
15x Tree-class minesweeper
14x Bush-class minesweeper

1x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops

8x River-class frigate

8x Pleiades-class light destroyers

6x Guard-class patrol crafts

4x Mimir-class floatplane carriers

On Trials

4x River-class frigate
- Rio Santa Lucia running trials until June 28
- Rio Negro running trials until August 28
- Arroyo de la India Muerta running trials until August 28
- Rio Cuarem running trials until September 28

2x Bush-class minesweeper
- Privet running trials until April 28
- Haw running trials until July 28

Ordered Units

4x River-class frigate (10 month á 60ts material necessary per unit)
- Rio Olimer Grande laid down in Montevideo on a Type 1 slip in May, completed February 29
- Rio Cebolatti laid down in Buenos Aires on a Type 1 slip in April, completed January 29
- Rio Tacuari laid down in Mar del Plata on a Type 1 slip in April, completed January 29
- Rio Daymàn laid down in St. Helena on a Type 1 slip in June, completed March 29

3x MS28-class minesweeper (Type 28 - 10 month á 56ts material necessary per unit)
- MS28-1 laid down in St. Helena on a Type 0 slip in March, completed December 28
- MS28-3 laid down in Montevideo on a Type 0 slip in June, completed March 29
- MS28-2 laid down in Buenos Aires on a Type 0 slip in May, completed February 29

3x R28-class (1 month á 92ts material necessary per unit)
- R1 build in Lüderitz in April
- R2 build in Lüderitz in May
- R3 build in Lüderitz in June

Rebuilds

None

Scrapping

6x MS12-class (4 month total, 1 month in Type 0 dock)
- Physalis scrapping in Mar del Plata starting in June, finished in September – 63ts received from hull for Q2/1928
- Lily scrapping in St. Helena starting in April, finished in July – 63ts received from hull for Q2/1928
- Bougainville scrapping in St. Helena starting in September, finished in December – 63ts received from hull for Q3/1928
- Magnolia scrapping in Mar del Plata starting in November, finished in March 28 – 63ts received from hull for Q4/1928
- Rose scrapping in Buenos Aires starting in March, finished in June 28 – 63ts received from hull for Q1/1929
- Lotus scrapping in Buenos Aires starting in May, finished in August 28 – 63ts received from hull for Q2/1929
- Tulip scrapping in St. Helena starting in April, finished in July 28 – 63ts received from hull for Q2/1929

1x SL09-class (4 month total, 2 month in Type 0 dock)
- Uranus scrapping in Cape Town starting in February, finished in May – 99ts received from hull for Q1/1929


Destroyers

Completed Units

1x Bird-class torpedoboat
10x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
6x Hound-class torpedoboat (Type 26)

12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)

On Trials

1x TB16-class torpedo boats
- Parder running trials until June 28

5x Hound-class torpedo boats
- Dalmatian running trials until June 28
- Deerhound running trials until June 28
- Boxer running trials until July 28
- Bouvier running trials until July 28
- Bullterrier running trials until July 28

5x Nymph-class destroyer Type 27
- Kymatolege running trials until May 28
- Kymo running trials until May 28
- Kymodoke running trials until May 28
- Kymothoe running trials until July 28
- Laodameia running trials until September 28

Ordered Units

1x Hound-class torpedo boat (Type 26 - 11 month á 126ts material necessary per unit)
- Briard laid down in Cape Town on a Type 1 slip in June, completed in April 28

5x Nymph-class destroyer (Type 27 - 11 month á 147ts material necessary per unit)
- Leiagora laid down in Daressalam on a Type 1 slip in January, completed in November 28
- Lysianassa laid down in Douala on a Type 1 slip in January, completed in November 28
- Melite laid down in Buenos Aires on a Type 2 slip in February, completed in December 28
- Menippe laid down in Mar del Plata on a Type 2 slip in March, completed in January 29
- Nesaia laid down in Port Elizabeth on a Type 2 slip in May, completed in March 29

4x DL28-class destroyer (11 month á 181ts material necessary per unit)
- Halberd laid down in Durban on a Type 2 slip in January, completed in November 28
- Langdebeve laid down in Daressalam on a Type 2 slip in February, completed in December 28
- DL28-3 laid down in Cape Town on a Type 2 slip in May, completed in March 29
- DL28-4 laid down in Port Louis on a Type 2 slip in April, completed in February 29

Rebuilds

3x TB16-class torpedo boat (6 month á 128ts material necessary per unit)
- Leopard entering a Type 1 dock in Douala in November. Leaving the dock in December, the torpedo boat will stay in the yard until April 28
- Lion entering a Type 1 dock in Montevideo in January. Leaving the dock in February, the torpedo boat will stay in the yard until June 28
- Lynx entering a Type 1 dock in Douala in June. Leaving the dock in July, the torpedo boat will stay in the yard until November 28

Scrapping

2x TB13-class (4 month total, 2 month in Type 1 dock)
- Dove scrapping in Durban starting in February, finished in May – 189ts received from hull for Q1/1929
- Gryphon scrapping in Durban starting in June, finished in September – 189ts received from hull for Q2/1929


Class B Cruisers

Completed Units

11x Insect-class torpedoboat
4x Nampula-class light cruiser
3x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
2x Aurora-class light cruiser

On Trials

2x CL24-class light cruiser
- Carmenta running trials until May 28
- Dira running trials until May 28

1x CL27-class light cruiser
- Arion running trials until September 28

Ordered Units

3x CL27-class light cruiser (15 month á 384ts material necessary per unit)
- Sleipnir laid down in Cape Town on a Type 3 slip in February, completed in April 28
- Pegasus laid down in Durban on a Type 3 slip in May, completed in July 29
- Areion laid down in Cape Town on a Type 3 slip in June, completed in August 29

Rebuilds

5x CL13-class light cruiser (14 month á 145ts/month material necessary per unit)
- Port Shepstone entering a Type 4 dock in Durban in April. Leaving the dock in September 27, the cruiser will stay in the yard until May 28
- Port St. Johns entering a Type 4 dock in Cape Town in July. Leaving the dock in December 27, the cruiser will stay in the yard until August 28
- Port Alfred entering a Type 2 dock in Port Elizabeth in July. Leaving the dock in December 27, the cruiser will stay in the yard until August 28
- Port Nolloth entering a Type 4 dock in Port Louis in January. Leaving the dock in June 28, the cruiser will stay in the yard until February 29
- Port Elizabeth entering a Type 2 dock in Montevideo in January. Leaving the dock in June 28, the cruiser will stay in the yard until February 29

Scrapping

None


Class A Cruisers

Completed Units

1x Colony-class AC
2x General-class AC
4x Cape-class 23 heavy cruiser
1x Cape-class 26 heavy cruiser

On Trials

None

Ordered Units

1x CA26-class heavy cruiser (19 month á 526ts material necessary per unit)
- Cape Agulhas laid down in Buenos Aires on a Type 3 slip in January, completed in July 28

Scrapping

None


Capital Units

Completed Units

1x Sao Tome-class
2x Hertog-class
2x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class

On Trials

1x BB24G-class
- Ophion running trials until May 28

Ordered Units

1x BB24G-class (37 month á 808ts/month material necessary per unit)
- Hyperion laid down on a Type 4 slip in Durban in April 25, completed in February 29

Rebuilds

4x Koning-class battleship (22 month á 576ts/month material necessary per unit)
- Koning Frederik entering a Type 3 dock in Durban in January. Leaving the dock in September 27, the battleship will stay in the yard until October 28
- Koning Hendrik entering a Type 3 dock in Buenos Aires in July. Leaving the dock in March 28, the battleship will stay in the yard until April 29
- Koning Wilhelm entering a Type 3 dock in Cape Town in January. Leaving the dock in September 28, the battleship will stay in the yard until October 29
- Koning Phillip entering a Type 3 dock in Douala in March. Leaving the dock in November 28, the battleship will stay in the yard until December 29

Scrapping

1x Sao Tome-class (10 month total, 4 month in Type 4 dock)
- Principe scrapping in Montevideo starting in January, finished in October – 3.095ts received from hull for Q3/1929, guns of first, second and third battery stored


Coastal Defence Units

Completed Units

1x Nagelring-class
2x LCDS-class

On Trials

None

Ordered Units

1x CDS4-class coast defense ship (17 month á 448ts material necessary per unit)
- Tyrfing laid down in Cape Town on a Type 3 slip in January, completed in May 29


Carriers

Completed Units

1x Wim Kraash-class (converted freighter, rated as experimental, to be replaced by CV25B)
1x CV25B-class

On Trials

None

Ordered Units

1x CV26-class fleet carrier (29 month á 690ts material necessary per unit)
- Forge laid down in Montevideo on a Type 4 slip in March, completed in July 28


Class A Submarines

Completed Units

12x E-class submarine
16x F-class submarine
4x J-class submarine

Ordered Units

None


Class B Submarines

Completed Units

14x G-class submarine
15x I-class submarine
12x H-class submarine
6x K-class submarine

On Trials

2x K-class submarine
- K9 running trials until June 28
- K7 running trials until July 28

Ordered Units

4x K-class submarine (10 month á 46ts material necessary per unit)
- K10 laid down in Cape Town on a Type 0 slip in July, completed in April 28
- K8 laid down in Prince Eduard Islands on a Type 0 slip in August, completed in May 28
- K11 laid down in Cape Town on a Type 0 slip in February, completed in November 28
- K12 laid down in Prince Eduard Islands on a Type 0 slip in June, completed in March 29


Non-combatants

Completed Units

16x Bay-class tender (several different designs)

On Trials

1x AV28-class submarine (12 month á 168ts material necessary per unit)
- Bölthorn laid down in Majunga on a Type 1 slip in February, completed in January 29

Ordered Units

None.

-----------------------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

24 ASW launches
39 minesweepers
58 small patrol crafts
53 TB/DDs (does not include 11 TBs with 15cm guns)
38 cruisers category b (does include 11 TBs with 15cm guns)
8 cruisers category a
11 capital units
1 fleet carrier
47 submarines category b
32 submarines category a
4 floatplane carriers
16 armed tenders

plus numerous auxiliary vessels of all kind.