[SIZE=3]SAE Quarterly Reports [/SIZE]
No. 30 – April to June 1928
[SIZE=3]Transfers: [/SIZE]
None
[SIZE=3]Factories:[/SIZE]
26 factories total can be used.
Fixed factories
2 factory will be fixed to produce infrastructure points for 1928.
Flexible factories
839ts material transferred from Q1 (incl. material recovered from scrapyard).
23,857ts material necessary to be produced in this quarter (24 factories).
0 factory will produce infrastructure points this quarter.
Infrastructure points used this quarter:
0,2pts put into a new Type 1 Dock in Victoria for a total of 1,5pts at the end of Q2.
[SIZE=3]Ships: [/SIZE]
Minor vessels
Completed Units
24x UJ26-class ASW launch
10x Flower-class minesweeper
15x Tree-class minesweeper
14x Bush-class minesweeper
1x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops
8x River-class frigate
8x Pleiades-class light destroyers
6x Guard-class patrol crafts
4x Mimir-class floatplane carriers
On Trials
4x River-class frigate
- Rio Santa Lucia running trials until June 28
- Rio Negro running trials until August 28
- Arroyo de la India Muerta running trials until August 28
- Rio Cuarem running trials until September 28
2x Bush-class minesweeper
- Privet running trials until April 28
- Haw running trials until July 28
Ordered Units
4x River-class frigate (10 month á 60ts material necessary per unit)
- Rio Olimer Grande laid down in Montevideo on a Type 1 slip in May, completed February 29
- Rio Cebolatti laid down in Buenos Aires on a Type 1 slip in April, completed January 29
- Rio Tacuari laid down in Mar del Plata on a Type 1 slip in April, completed January 29
- Rio Daymàn laid down in St. Helena on a Type 1 slip in June, completed March 29
3x MS28-class minesweeper (Type 28 - 10 month á 56ts material necessary per unit)
- MS28-1 laid down in St. Helena on a Type 0 slip in March, completed December 28
- MS28-3 laid down in Montevideo on a Type 0 slip in June, completed March 29
- MS28-2 laid down in Buenos Aires on a Type 0 slip in May, completed February 29
3x R28-class (1 month á 92ts material necessary per unit)
- R1 build in Lüderitz in April
- R2 build in Lüderitz in May
- R3 build in Lüderitz in June
Rebuilds
None
Scrapping
6x MS12-class (4 month total, 1 month in Type 0 dock)
- Physalis scrapping in Mar del Plata starting in June, finished in September – 63ts received from hull for Q2/1928
- Lily scrapping in St. Helena starting in April, finished in July – 63ts received from hull for Q2/1928
- Bougainville scrapping in St. Helena starting in September, finished in December – 63ts received from hull for Q3/1928
- Magnolia scrapping in Mar del Plata starting in November, finished in March 28 – 63ts received from hull for Q4/1928
- Rose scrapping in Buenos Aires starting in March, finished in June 28 – 63ts received from hull for Q1/1929
- Lotus scrapping in Buenos Aires starting in May, finished in August 28 – 63ts received from hull for Q2/1929
- Tulip scrapping in St. Helena starting in April, finished in July 28 – 63ts received from hull for Q2/1929
1x SL09-class (4 month total, 2 month in Type 0 dock)
- Uranus scrapping in Cape Town starting in February, finished in May – 99ts received from hull for Q1/1929
Destroyers
Completed Units
1x Bird-class torpedoboat
10x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
6x Hound-class torpedoboat (Type 26)
12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
On Trials
1x TB16-class torpedo boats
- Parder running trials until June 28
5x Hound-class torpedo boats
- Dalmatian running trials until June 28
- Deerhound running trials until June 28
- Boxer running trials until July 28
- Bouvier running trials until July 28
- Bullterrier running trials until July 28
5x Nymph-class destroyer Type 27
- Kymatolege running trials until May 28
- Kymo running trials until May 28
- Kymodoke running trials until May 28
- Kymothoe running trials until July 28
- Laodameia running trials until September 28
Ordered Units
1x Hound-class torpedo boat (Type 26 - 11 month á 126ts material necessary per unit)
- Briard laid down in Cape Town on a Type 1 slip in June, completed in April 28
5x Nymph-class destroyer (Type 27 - 11 month á 147ts material necessary per unit)
- Leiagora laid down in Daressalam on a Type 1 slip in January, completed in November 28
- Lysianassa laid down in Douala on a Type 1 slip in January, completed in November 28
- Melite laid down in Buenos Aires on a Type 2 slip in February, completed in December 28
- Menippe laid down in Mar del Plata on a Type 2 slip in March, completed in January 29
- Nesaia laid down in Port Elizabeth on a Type 2 slip in May, completed in March 29
4x DL28-class destroyer (11 month á 181ts material necessary per unit)
- Halberd laid down in Durban on a Type 2 slip in January, completed in November 28
- Langdebeve laid down in Daressalam on a Type 2 slip in February, completed in December 28
- DL28-3 laid down in Cape Town on a Type 2 slip in May, completed in March 29
- DL28-4 laid down in Port Louis on a Type 2 slip in April, completed in February 29
Rebuilds
3x TB16-class torpedo boat (6 month á 128ts material necessary per unit)
- Leopard entering a Type 1 dock in Douala in November. Leaving the dock in December, the torpedo boat will stay in the yard until April 28
- Lion entering a Type 1 dock in Montevideo in January. Leaving the dock in February, the torpedo boat will stay in the yard until June 28
- Lynx entering a Type 1 dock in Douala in June. Leaving the dock in July, the torpedo boat will stay in the yard until November 28
Scrapping
2x TB13-class (4 month total, 2 month in Type 1 dock)
- Dove scrapping in Durban starting in February, finished in May – 189ts received from hull for Q1/1929
- Gryphon scrapping in Durban starting in June, finished in September – 189ts received from hull for Q2/1929
Class B Cruisers
Completed Units
11x Insect-class torpedoboat
4x Nampula-class light cruiser
3x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
2x Aurora-class light cruiser
On Trials
2x CL24-class light cruiser
- Carmenta running trials until May 28
- Dira running trials until May 28
1x CL27-class light cruiser
- Arion running trials until September 28
Ordered Units
3x CL27-class light cruiser (15 month á 384ts material necessary per unit)
- Sleipnir laid down in Cape Town on a Type 3 slip in February, completed in April 28
- Pegasus laid down in Durban on a Type 3 slip in May, completed in July 29
- Areion laid down in Cape Town on a Type 3 slip in June, completed in August 29
Rebuilds
5x CL13-class light cruiser (14 month á 145ts/month material necessary per unit)
- Port Shepstone entering a Type 4 dock in Durban in April. Leaving the dock in September 27, the cruiser will stay in the yard until May 28
- Port St. Johns entering a Type 4 dock in Cape Town in July. Leaving the dock in December 27, the cruiser will stay in the yard until August 28
- Port Alfred entering a Type 2 dock in Port Elizabeth in July. Leaving the dock in December 27, the cruiser will stay in the yard until August 28
- Port Nolloth entering a Type 4 dock in Port Louis in January. Leaving the dock in June 28, the cruiser will stay in the yard until February 29
- Port Elizabeth entering a Type 2 dock in Montevideo in January. Leaving the dock in June 28, the cruiser will stay in the yard until February 29
Scrapping
None
Class A Cruisers
Completed Units
1x Colony-class AC
2x General-class AC
4x Cape-class 23 heavy cruiser
1x Cape-class 26 heavy cruiser
On Trials
None
Ordered Units
1x CA26-class heavy cruiser (19 month á 526ts material necessary per unit)
- Cape Agulhas laid down in Buenos Aires on a Type 3 slip in January, completed in July 28
Scrapping
None
Capital Units
Completed Units
1x Sao Tome-class
2x Hertog-class
2x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class
On Trials
1x BB24G-class
- Ophion running trials until May 28
Ordered Units
1x BB24G-class (37 month á 808ts/month material necessary per unit)
- Hyperion laid down on a Type 4 slip in Durban in April 25, completed in February 29
Rebuilds
4x Koning-class battleship (22 month á 576ts/month material necessary per unit)
- Koning Frederik entering a Type 3 dock in Durban in January. Leaving the dock in September 27, the battleship will stay in the yard until October 28
- Koning Hendrik entering a Type 3 dock in Buenos Aires in July. Leaving the dock in March 28, the battleship will stay in the yard until April 29
- Koning Wilhelm entering a Type 3 dock in Cape Town in January. Leaving the dock in September 28, the battleship will stay in the yard until October 29
- Koning Phillip entering a Type 3 dock in Douala in March. Leaving the dock in November 28, the battleship will stay in the yard until December 29
Scrapping
1x Sao Tome-class (10 month total, 4 month in Type 4 dock)
- Principe scrapping in Montevideo starting in January, finished in October – 3.095ts received from hull for Q3/1929, guns of first, second and third battery stored
Coastal Defence Units
Completed Units
1x Nagelring-class
2x LCDS-class
On Trials
None
Ordered Units
1x CDS4-class coast defense ship (17 month á 448ts material necessary per unit)
- Tyrfing laid down in Cape Town on a Type 3 slip in January, completed in May 29
Carriers
Completed Units
1x Wim Kraash-class (converted freighter, rated as experimental, to be replaced by CV25B)
1x CV25B-class
On Trials
None
Ordered Units
1x CV26-class fleet carrier (29 month á 690ts material necessary per unit)
- Forge laid down in Montevideo on a Type 4 slip in March, completed in July 28
Class A Submarines
Completed Units
12x E-class submarine
16x F-class submarine
4x J-class submarine
Ordered Units
None
Class B Submarines
Completed Units
14x G-class submarine
15x I-class submarine
12x H-class submarine
6x K-class submarine
On Trials
2x K-class submarine
- K9 running trials until June 28
- K7 running trials until July 28
Ordered Units
4x K-class submarine (10 month á 46ts material necessary per unit)
- K10 laid down in Cape Town on a Type 0 slip in July, completed in April 28
- K8 laid down in Prince Eduard Islands on a Type 0 slip in August, completed in May 28
- K11 laid down in Cape Town on a Type 0 slip in February, completed in November 28
- K12 laid down in Prince Eduard Islands on a Type 0 slip in June, completed in March 29
Non-combatants
Completed Units
16x Bay-class tender (several different designs)
On Trials
1x AV28-class submarine (12 month á 168ts material necessary per unit)
- Bölthorn laid down in Majunga on a Type 1 slip in February, completed in January 29
Ordered Units
None.
-----------------------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
24 ASW launches
39 minesweepers
58 small patrol crafts
53 TB/DDs (does not include 11 TBs with 15cm guns)
38 cruisers category b (does include 11 TBs with 15cm guns)
8 cruisers category a
11 capital units
1 fleet carrier
47 submarines category b
32 submarines category a
4 floatplane carriers
16 armed tenders
plus numerous auxiliary vessels of all kind.