You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, April 28th 2006, 2:15am

Iberia, Quarter 4, 1930

Iberian Naval Developments Q4 1930

a/ Industrial Allocation
13/23 factories producing materiel for shipbuilding =13000 tons
10/23 factories (fixed) producing infrastructure materiel =1.0 points + 1.0 bonus points
0/23 factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Factory no. 24 continues construction, receiving 1.0 points = Total 5.6 points
No.2 Type 0 slip, La Coruna, extends to type 1 receives 0.2 pts = Total 0.5pts, completed
No.3 Type 0 drydock, Barreiro, extending to type 1 receives 0.4 pts = Total 1 pt, completed
No.4 Type 0 drydock, Barreiro, extending to type 1 receives 0.4 pts = Total 1 pt , completed

c/ Naval Construction
Cadiz-
No.1 type 5 slip – Idle
No.2 type 4 slip – Idle
No.3 type 3 slip – Sb9, Sb10, Sub, laid down 02/01/30, each receive 69 tons to complete
No.4 type 2 slip – Sb11, Sb12, Sub, laid down 02/01/30, each receive 69 tons to complete
No.5 type 2 slip – Idle
No.6 type 2 slip – Idle

No.1 type 4 drydock – Toledo, CV, laid down 01/10/1928, receives 1827 tons, balance 1,821 tons
No.2 type 3 drydock – Idle


Dock side – Idle
Dock side – Idle

Barreiro-
No.1 type 4 slip – Idle
No.2 type 3 slip – Sb13, Sb14, Sub, laid down 02/01/30, each receive 69 tons to complete
No.3 type 3 slip – Sb15, Sb16, Sub, laid down 02/01/30, each receive 69 tons to complete
No.4 type 1 slip – Idle
No.5 type 1 slip – Idle
No.6 type 1 slip – Idle

No.1 type 5 drydock – Idle
No.2 type 3 drydock – Idle
No.3 type 0 drydock – Idle
No.4 type 0 drydock – Idle

Dock side – Cordoba, CV, laid down 01/10/1928, receives 1827 tons, balance 1,821 tons

Porto-
No.1 type 4 slip – Idle
No.2 type 3 slip – C79, C80, GB, laid down 02/01/30, each receive 311 tons to complete
No.3 type 3 slip – C87, C88, GB, laid down 01/10/30, each receive 511 tons, balance 1,333 tons

Dock side – Idle

La Coruna-

No.1 type 2 slip – Paracels, CL, laid down 01/10/1929, receives 1235 tons, balance 117 tons
No.2 type 0 slip – EXTENDING

No.1 type 2 drydock –Idle
No.2 type 1 drydock –Idle
No.3 type 0 drydock –Idle
No.4 type 0 drydock –Idle

Dock side – Idle

Santander-

No.1 type 3 slip – Islas Baleares, CL, laid down 01/10/1929, receives 1235 tons, balance 117 tons
No.2 type 2 slip – Idle
No.3 type 1 slip – Ide
No.4 type 1 slip – Idle
No.5 type 1 slip – Idle
No.6 type 1 slip – Idle

No.1 type 2 drydock – Idle

Dock side – Idle
Dock side – Idle



Santiago De Cuba-

No.1 type 2 slip – C89, GB, laid down 01/10/30, receive 511 tons, balance 1333 tons
No.2 type 1 slip – C90, GB, laid down 02/10/30, receive 511 tons, balance 1333 tons
No.3 type 1 slip – Idle

No.1 type 4 drydock - Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle

Dock side – C81, GB, laid down 02/01/30, receive 311 tons to complete
Dock side – C82, GB, laid down 02/01/30, receive 311 tons to complete


San Lorenzo-

No.1 type 3 drydock – Idle
No.2 type 0 drydock – Idle

Dock side – Idle

Panama-

No.1 type 2 slip – C91, GB, laid down 01/10/30, receive 511 tons, balance 1,333 tons
No.2 type 1 slip – C92, GB, laid down 01/10/30, receive 511 tons, balance 1,333 tons
No.3 type 1 slip – Idle
No.4 type 1 slip – Idle
No.5 type 1 slip – Idle

No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 0 drydock – Idle

Dock side – C83, GB, laid down 02/01/30, receive 311 tons to complete
Dock side – C84, GB, laid down 02/01/30, receive 311 tons to complete

Luanda-

No.1 type 1 slip – C85, GB, laid down 02/01/30, receive 311 tons to complete
No.2 type 1 slip – C86, GB, laid down 02/01/30, receive 311 tons to complete No.3 type 1 slip – Idle
No.4 type 1 slip – Idle

No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 1 drydock – Idle

Dock side – Idle
Dock side – Idle


San Hainando-

No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle

d/ Transactions
None

e/ Other Notes

Breaking of the following ships:-
None

Re-Fitting (25%) of the following ships:-
None

Re-Building (50%) of the following ships:-
None

Sea trials of the following vessels:-
Sb9 – Sb16 commence sea trials on 24/10/1930
C79 – C86 commence sea trials on 23/11/1930

Commissioning of the following vessels:-
BDT157 – BDT168 commission on 30/10/1930
C77 – C78 commission on 19/11/1930

Tonnage from scrapping = 1564 tons
Tonnage Carried Over From This Quarter = 1010 tons
Total Tonnage Carried Over From This Quarter = 2564 tons

f/ Order of Battle
Note: W(X)+Y(Z) = In Service (under repair/refit) + building/on order (breaking)

BB = 08 (0) + 0/0 (0)
BC = 04 (0) + 0/0 (0)
CDS(CE) = 05 (0) + 0/0 (0)
CA = 10 (0) + 0/0 (0)
CL = 49 (0) + 4/0 (0)
CV = 02 (0) + 2/0 (0)
DD = 99 (0) + 0/0 (0)
FR = 16 (0) + 0/0 (0)
GB = 78 (0) + 14/0 (0)
SUB = 32 (0) + 8/0 (0)
MWS = 32 (0) + 0/0 (0)
BDT = 168 (0) + 12/0 (0)
Note: FR = Frigate
GB = Gun Boat
MWS = Mine Warfare Ship
BDT = Barco Del Torpedo (Torpedo boat)