Danish Naval Developments Q4 1930
a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts + 0.2 bonus pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Dry Dock No.1 (Type 2) at Copenhagen extending to Type 3 receives 0.4 IP = Total 1.0 IP points, upgrade completed
c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Kára, CL, laid down 02/01/30, receives 1,170 tons, balance 1072 tons
No.2 type 2 slip – Sváva, CL, laid down 02/04/30, receives 1,170 tons, balance 2242 tons
No.3 type 1 slip – Lavender , SL, laid down 02/07/30, receives 349 tons, balance 486 tons
No.4 type 1 slip – Orchid , SL, laid down 02/07/30, receives 349 tons, balance 486 tons
No.1 type 2 drydock – EXTENDING
Dock side – Carnation, SL, laid down 02/01/30, receives 137 tons to complete
Dock side – Bluebell, , SL, laid down 02/01/30, receives 137 tons to complete
Aarhus-
No.1 type 3 slip – Sigrún, CL, laid down 01/10/30. receives 1170 tons, balance 4582 tons
No.2 type 2 slip – Mist, CL, laid down 01/10/30. receives 1170 tons, balance 4582 tons
No.3 type 1 slip – Idle
No.4 type 1 slip – Idle
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
Dock side – Rodso, GB, laid down 02/07/1930, receives 133 tons to complete
Dock side – Tjele Langso, GB, laid down 02/07/1930, receives 133 tons to complete
Dock side - Róta, CL laid down 01/10/29, receives 1,072 tons to complete
Aalborg-
No.1 type 1 slip – Jasmine, SL, laid down 01/07/30, receives 349 tons, balance 486 tons
No.2 type 1 slip – Dahlia, SL, laid down 01/07/30, receives 349 tons, balance 486 tons
No.3 type 1 slip – Kalorm, MWS, laid down 15/10/1930, receives 245 tons, balance 555 tons
No.4 type 1 slip - Tusindben, MWS, laid down 15/10/1930, receives 245 tons, balance 555 tons
Dock side – Myre, MWS, laid down 02/01/1930, receives 65 tons to complete
Dock side – Bi, MWS, laid down 02/01/1930, receives 65 tons to complete
Dock side – Bille, MWS, laid down 15/05/1930, receives 245 tons, balance 65 tons
Dock side – Sommerfugl, MWS, laid down 15/05/1930, receives 245 tons, balance 65 tons
Bangkok-
No.1 type 1 slip – Sunflower, SL, laid down 02/06/30, receives 349 tons, balance 486 tons
No.2 type 0 slip – Idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side – Marigold, SL, laid down 02/01/30, receives 137 tons to complete
d/ Transactions
None
e/ Other Notes
KDM Gunnr commissions on 15/12/1930
KDM Stormose commissions on 10/11/1930
KDM Snaebum So commissions on 10/11/1930
KDM Klejtrup So commissions on 10/11/1930
KDM Haerup So commissions on 10/11/1930
KDM Tulip continues sea trials until 29/01/31
KDM Daffodil continues sea trials until 29/01/31
KDM Myre commences sea trials on 23/10/1930
KDM Bi commences sea trials on 23/10/1930
KDM Carnation commences sea trials on 03/11/1930
KDM Bluebell commences sea trials on 03/11/1930
KDM Marigold commences sea trials on 03/11/1930
KDM Rodso commences sea trials on 11/11/1930
KDM Tjele Langso commences sea trials on 11/11/1930
KDM Róta commences sea trials on 17/12/1930
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 219 tons
f/ Order of Battle
Note:
Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 03 (0) + 0/0 (0)
AC = 00 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 0/0 (0)
CL = 15 (0) + 5/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 26 (0) + 0/0 (0)
SL = 07 (0) + 10/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 21 (0) + 2/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 07 (0) + 6/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)