You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, August 15th 2013, 4:10am

France, Q2/1944



Report for Q2/1944
Industrial Allocation
- 24/27 factories producing 24,000t materials.
- 3/27 factories producing infrastructure
- 941t from stockpile.
- 2,378t from transactions.
- 880t from scrapping.
- 28,200t materials total.
- 27,297 used.
- 903t stored for Q3/44.

Infrastructure Development
3 factories dedicated to IP, producing 0.3 IP. 4.1 IP added to half-factory, 0.9 IP remaining.

Naval Construction

At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Idle
Class 4 Slip #1 - Export Battleship Tapae laid down for Romania January 1st, 1943. 34,448 tons required. 2,379 tons added in Q2/1944 for a total of 14274 / 34448 tons. 20174 / 34448 tons remaining. Launched June, 1944. Completion planned for September 9th, 1946.
Class 3 Slip #1 - Heavy Cruiser Redoubtable laid down July 1st, 1943. 14,275 tons required. 2400 tons added in Q2/1944 for a total of 2700 / 14275 tons. 11575 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
Class 3 Slip #2 - Heavy Cruiser Renommée laid down July 1st, 1943. 14,275 tons required. 2400 tons added in Q2/1944 for a total of 2700 / 14275 tons. 11575 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
Class 3 Slip #3 - Contre-Torpillieur Guépratte (Forbin class) laid down January 1st, 1944. 2,500 tons required. 625 tons added in Q2/1944 for a total of 1250 / 2500 tons. 1250 / 2500 tons remaining. Launched May 19th, 1944. Completed December 15th, 1944.
Class 3 Slip #4 - Contre-Torpillieur Duperré (Forbin class) laid down March 1st, 1944. 2,500 tons required. 210 tons added in Q1/1944 for a total of 835 / 2500 tons. 1665 / 2500 tons remaining. Launched July 19th, 1944. Completed March 15th, 1945.
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Contre-Torpillieur L'Inflexible (Forbin class) laid down May 1st, 1944. 2,500 tons required. 625 tons added in Q2/1944 for a total of 625 / 2500 tons. 1875 / 2500 tons remaining. Launched September 19th, 1944. Completed April 15th, 1945.
Class 1 Slip #1 - Escorteur rapide Le Vendéen laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q2/1944 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
Class 1 Slip #2 - Escorteur rapide Le Bordelais laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q2/1944 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
Class 1 Slip #3 - Escorteur rapide Le Gascon laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q2/1944 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
Class 1 Slip #4 - Escorteur rapide Le Savoyard laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q2/1944 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
Class 0 Slip #1 - Submarine Naiade (Thetis class) laid down January 1st, 1944. 675 tons required. 300 tons added in Q2/1944 for a total of 600 / 675 tons. 75 / 675 tons remaining. Launched April 30th, 1944. Completed October 21st, 1944
Class 0 Slip #2 - Submarine Circé (Thetis class) laid down April 1st, 1944. 675 tons required. 300 tons added in Q2/1944 for a total of 300 / 675 tons. 375 / 675 tons remaining. Launched July 30th, 1944. Completed January 21st, 1945.
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Dockside:
- Aircraft Carrier Vengeur laid down January 1st, 1941. 33,000 tons required. 1,500 tons added in Q2/1944 for a total of 33000 / 33000 tons. 0 / 33000 tons remaining. Launched June 24th, 1942. Completed May 1st, 1944.
- Aircraft Carrier Pacificateur laid down January 1st, 1941. 33,000 tons required. 1,500 tons added in Q2/1944 for a total of 33000 / 33000 tons. 0 / 33000 tons remaining. Launched June 24th, 1942. Completed May 1st, 1944.
- Contre-Torpillieur Chevalier Paul (Forbin class) laid down May 1st, 1943. 2,500 tons required. 0 tons added in Q2/1944 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched September 19th, 1943. Completed April 15th, 1944.
- Contre-Torpillieur Vauquelin (Forbin class) laid down July 1st, 1943. 2,500 tons required. 625 tons added in Q2/1944 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched November 19th, 1943. Completed June 15th, 1944.
- Contre-Torpillieur D'Estrées (Forbin class) laid down September 1st, 1943. 2,500 tons required. 625 tons added in Q2/1944 for a total of 2085 / 2500 tons. 415 / 2500 tons remaining. Launched January 19th, 1943. Completed August 15th, 1944.
- Contre-Torpillieur d'Estaing (Forbin class) laid down November 1st, 1943. 2,500 tons required. 625 tons added in Q2/1944 for a total of 1875 / 2500 tons. 625 / 2500 tons remaining. Launched March 19th, 1944. Completed October 15th, 1944.
- Contre-Torpillieur Claymore (Sabre class, Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q2/1944 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1943. Completed June 4th, 1944.
- Contre-Torpillieur Carabine (Sabre class, Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q2/1944 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1943. Completed June 4th, 1944.
- Contre-Torpillieur Épée (Sabre class, Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q2/1944 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1943. Completed June 4th, 1944.
- Contre-Torpillieur Trident (Sabre class, Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q2/1944 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1943. Completed June 4th, 1944.
- Submarine Atalante (Thetis class) laid down July 1st, 1943. 675 tons required. 0 tons added in Q2/1944 for a total of 675 / 675 tons. 0 / 675 tons remaining. Launched October 31st, 1943. Completed April 21st, 1944.
- Submarine Calypso (Thetis class) laid down October 1st, 1943. 675 tons required. 75 tons added in Q2/1944 for a total of 675 / 675 tons. 0 / 675 tons remaining. Launched February 31st, 1943. Completed July 21st, 1944.
- Landing craft Spahi laid down January 1st, 1944. 179 tons required. 74 tons added in Q2/1944 for a total of 179 / 179 tons. 0 / 179 tons remaining. Launched February 2nd, 1944. Completed May 6th, 1944.
- Landing craft Chasseur laid down January 1st, 1944. 179 tons required. 74 tons added in Q2/1944 for a total of 179 / 179 tons. 0 / 179 tons remaining. Launched February 2nd, 1944. Completed May 6th, 1944.
- Tanker Nivôse converted as naval auxiliary. 260 tons required. 260 tons added in Q2/1944. Conversion completed.

At Brest (Cl 5)
Class 3 Drydock #1 - Destroyer Vautor undergoing minor refit beginning April 1st, 1944. 100 tons required. 100 tons added Q2/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes May 17th.
Class 2 Drydock #1 - Light cruiser Primauguet begins partial reconstruction on April 1st, 1944. 2797 tons required. 1100 tons added in Q2 for a total of 1100 / 2797 tons. 1697 /2797 tons remaining. Refit completed November 11th, 1944.
Class 1 Drydock #1 - Destroyer Gerfaut undergoing minor refit beginning April 1st, 1944. 100 tons required. 100 tons added Q2/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes May 17th.
Class 0 Drydock #1 - Idle

Dockside:
N/A

At Cayenne (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

Dockside:
N/A

At Abidjan (Cl 5)
Class 3 Drydock #1 - Audaciaux class destroyer Topaz scrapping. 178 tons recovered.
Class 1 Drydock #1 - Idle

At Marseilles (Cl 5)
Class 4 Drydock #1 - Idle
Class 3 Slip #1 - Aircraft Carrier Zélé laid down January 1st, 1944. 14,550 tons required. 100 tons added in Q2/1944 for a total of 200 / 14550 tons. 14350 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
Class 3 Slip #2 - Aircraft Carrier Héros laid down January 1st, 1944. 14,550 tons required. 100 tons added in Q2/1944 for a total of 200 / 14550 tons. 14350 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
Class 2 Drydock #1 - Frégate de surveillance Fidji (Polynésie class) laid down January 1st, 1944. 2,779 tons required. 679 tons added in Q1/1944 for a total of 1358 / 2779 tons. 1421 / 2779 tons remaining. Launched May 22nd, 1944. Completed December 24th, 1944.
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Frégate Sans Peur laid down January 1st, 1944. 1,400 tons required. 400 tons added in Q2/1944 for a total of 800 / 1400 tons. 600 / 1400 tons remaining. Launched May 5th, 1944. Completed December 12th, 1944.
Class 1 Drydock #1 - Destroyer Aigle undergoing minor refit beginning April 1st, 1944. 100 tons required. 100 tons added Q2/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes May 17th.
Class 0 Drydock #1 - Idle

Dockside:
- Landing Ship Dock Destrées (Châteaurenault class) laid down January 1st, 1943. 7539 tons required. 39 tons added in Q2/1944 for a total of 7539 / 7539 tons. 0 / 7539 tons remaining. Launched July 19th, 1943. Completed May 17th, 1944.
- Submarine Roland Morillot laid down July 1st, 1943. 1,450 tons required. 100 tons added in Q3/1944 for a total of 1550 / 1450 tons. 0 / 1450 tons remaining. Launched November 6th, 1943. Completed May 15th, 1944.
- Submarine Charles Drujon laid down July 1st, 1943. 1,450 tons required. 100 tons added in Q3/1944 for a total of 1550 / 1450 tons. 0 / 1450 tons remaining. Launched November 6th, 1943. Completed May 15th, 1944.

At Oran (Cl 5)
Class 1 Drydock #1 - Destroyer Albatros undergoing minor refit beginning April 1st, 1944. 100 tons required. 100 tons added Q2/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes May 17th.
Class 0 Drydock #1 - Emilia-class patrouilleur Carmen refitting. 56 tons required. 56 tons added Q2/44. 0 tons remaining. Refit completed.

Dockside:
N/A

At Tunis (Cl 5)
Class 4 Drydock #1 - Light cruiser Emile Bertin begins partial reconstruction on January 1st, 1944. 2797 tons required. 1100 tons added in Q2 for a total of 2200 / 2797 tons. 597 /2797 tons remaining. Refit completed August 11th, 1944.
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Emilia-class patrouilleur Cathérine refitting. 56 tons required. 56 tons added Q2/44. 0 tons remaining. Refit completed.

Dockside:
N/A

At Beiruit (Cl 5)
Class 3 Drydock #1 - Cargo Ship Gallieni converted to naval landing ship. 1269 tons required. 369 tons added in Q2/44 for a total of 1269 / 1269 tons. 0 / 1269 tons remaining.
Class 1 Drydock #1 - CS27-class submarine Q181 scrapping. 66 tons recovered.

Dockside:
N/A

At Djibouti (Cl 2)
Class 2 Drydock #1 - Idle.
Class 1 Drydock - Idle.
Class 1 Drydock #1 - Corvette Sambre refitting. 80 tons required. 80 tons added Q2/1944. 0 tons remaining. Refit completes May 15th, 1944.

Dockside:
- None

At Dakar
Class 1 Floating Drydock #1 - Setting up for operation

At Saigon (Cl 5)
Class 4 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Emilia-class patrouilleur Marie refitting. 56 tons required. 56 tons added Q2/44. 0 tons remaining. Refit completed.
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down April 1st; 8 tons added Q2/44. Completed April 30th, 1944, launched. Vedette FOM 11m laid down April 1st; 11 tons added Q2/44. Completed April 30th, 1944, launched.
Class 0 Slip #2 - Subchaser Thi Nai laid down April 1st; 125 tons added Q2/44. Completed April 30th, 1944, launched.

Thi Nai

Dockside:
- N/A

Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Emilia-class patrouilleur Bettina refitting. 56 tons required. 56 tons added Q2/44. 0 tons remaining. Refit completed.

At New Caledonia (Cl 5)
Class 4 Drydock #1 - Heavy cruiser Nouvelle-Calédonie continues total reconstruction. 8601 tons required. 3000 tons added in Q2/1944 for a total of 3600 / 8601 tons. 5001 / 8601 tons remaining. Reconstruction completes Q4/1944.
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Aviso Annamite (Arabe class) laid down January 1st, 1944. 634 tons required. 190 tons added in Q2/1944 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched April 27th, 1944. Completed October 19th, 1944.
Class 0 Slip #2 - Aviso Van Kiep (ex-Bambara) (Arabe class) laid down January 1st, 1944. 634 tons required. 190 tons added in Q2/1944 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched April 27th, 1944. Completed October 19th, 1944.
Class 0 Slip #3 - Idle

Dockside:
- Aviso Arabe (Arabe class) laid down July 1st, 1943. 634 tons required. 64 tons added in Q2/1944 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched October 27st, 1943. Completed April 19th, 1944.
- Aviso Chi Lang (ex-Algérien) (Arabe class) laid down July 1st, 1943. 634 tons required. 64 tons added in Q2/1944 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched October 27st, 1943. Completed April 19th, 1944.

At Papeete (Cl 3)
Class 3.5 Drydock - Idle

Dockside:
- None

On Trials:
- CA Jean Bart
- CA Jeanne d'Arc
- LSD Destrées
- DD Claymore
- DD Carabine
- DD Épée
- DD Trident
- AV Arabe
- AV Chi Lang
- SS Thetis
- SS Nymphe
- SS Atalante
- LCI Spahi
- LCI Chasseur
- FGT Sans Reproche
- FGT Tran Nhat Duat
- ER Le Normand
- ER Le Boulonnais
- ER Le Lorrain

From Factories
- 2x La Combattante II motor torpedo boats built; 320 tons total (160t each).

Transactions
2,379 tons from Romania for Export Battleship (construction costs).

Other Notes
None

Ships being scrapped
One Audaciaux-class destroyer is being scrapped for 178 tons apiece.
One CS-27-class submarine is being scrapped for 66 tons apiece.

- Total tonnage in recycling until Q2/1944: (10x88) = 880
- Total tonnage in recycling until Q4/1944: (9x178) + (1x66) = 1668
- Total tonnage in recycling until Q1/1945: (1x178) + (1x66) = 244

Updated Order of Battle, End of Q2/1944
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping

The Fleet
Battleships: 7(0)+1
Battlecruisers: 4(0)+0
Aircraft Carriers: 11(0)+2
Heavy Cruisers: 14(1)+2
Light Cruisers: 24(2)+0
Coast Defense Ships: 5(0)+0
Destroyers: 82(0)+5
Frigate: 2(0)+2
Corvettes: 10(0)+0
Escorteurs Rapides: 4(0)+4
Avisos: 10(0)+2
Fleet Submarines: 26(0)+0
Coastal Submarines: 55(0)+3
Motor Torpedo Boats: 36(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Submarine Chasers: 100(0)+0
Light Patrol Boats: 8(0)+0
River Gunboats: 34 (0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0

Fleet Train
Replenishment Ships: 14(0)+0
Light Oiler Tankers: 7(0)+0
Gasoline Tankers: 3(0)+0
Oil Transport Tankers: 4(0)+0
Fleet Tenders: 4(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 2(0)+0
Light Repair Ships: 4(0)+0
Ammunition Ships: 2(0)+0
Transports: 8(0)+0

Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 10(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 0(0)+0
Research Ship: 3(0)+0
Research Submarine: 1(0)+0

Amphibious Forces:
Dock Landing Ship: 2(0)+0
Vehicle Landing Ship: 4(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 10(0)+0
Infantry Landing Craft Large (EDA-L): 6(0)+0
Tank Landing Craft (EDA): 13(0)+0
Infantry Assault Craft Small (EA): 29(0)+0

Minor Craft:
Bateau de Service: 72(0)+0
Patrouilleur de Port: 54(0)+0

Patrouille Navale:
Frigate: 1(0)+0
Survey Craft: 1(0)+0
Tank Landing Craft (EDA): 8(0)+0
Infantry Assault Craft (EA): 8(0)+0
Submarine Chasers: 53(0)+0
Motor Torpedo Boats: 4(0)+0
Vedettes: 18(0)+0
Light Patrol Boats: 4(0)+0
Bateau de Service: 12(0)+0
Patrouilleur de Port: 4(0)+0