You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, December 16th 2006, 11:16am

Turkey Q4/32

*To be revised as needed*

A. Industrial Allocation

2/6 factories (non-fixed) to naval materials: 2,000 tons created for Q4/1932 + 429 tons stockpiled from Q3/32= 2,429 tons, 2,429 tons used, 0 tons stockpiled for next quarter

1/6 factories (fixed) to infrastructure development: 0.1 points for Q4/1932 plus 0.1 bonus points

3/6 factories (non-fixed) to infrastructure development: 0.3 points for Q4/1932

Total 0.5 points created for Q4/32 plus 0.4 IP's transfered from Atlantis for total of 0.9 IP's for use in Q4/32

0.3 Ip's transfered to India

B. Infrastructure Development

0.6 points added to one Type 3 Drydock at Icel

C. Naval Construction

Istambul
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
Type 1 slip #3 - Idle
Type 0 slip #1 - PB-14 laid down, 449 tons needed, 200 tons added
Type 0 slip #2 - PB-15 laid down, 449 tons needed, 200 tons added


2x S-1 type Subchasers built (S-31, S-32)

Izmit

Type 3 drydock #1 - Idle
Type 2 slip #1- CL Istambul building 6,943 tons needed, 1,000 tons used, 1,029 tons added
Type 1 drydock #1 - Idle
Type 1 slip #1 PB-16 laid down, 449 tons needed, 200 tons added
Type 1 slip #2 PB-17 laid down, 449 tons needed, 200 tons added

2x S-1 type Subchasers built (S-33, S-34)

Samsun

Type 3 drydock #1 - TB's Berk Efsan (250 tons disp.), Drach and Moussoul (160 tons disp. each) complete scrapping, 85 tons of materials to be recycled in Q2/33
Type 1 drydock #1 - Idle
Type 0 drydock #2 - Idle

Icel

Type 3 drydock #1 begins construction, 4.0 points needed, 0.9 points used, 0.6 points added
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
Type 0 drydock #1 - Idle

2x S-1 type Subchasers built (S-35, S-36)

Trabzon

Type 1 drydock #1 - Idle

Launched ships being completed:

None

Ships completed/transfered and on trials

CL Ankara on trials
7 MOB 1918 DD's on trials

Summary of ship building/repairs/rebuilds and convertions.

CL Istambul building (1,029 tons)
4xPB-14 class Patrol boats laid down (800 tons)
6xS-1 class subchasers building (600 tons)


D. Transactions

0.3 IP's transfered to india for construction of battleship Mahmudieh
0.4 IP's transfered to Turkey from Atlantis, total to be transfered 6.8 IP's, 4.7 IP's transfered as of this quarter

E. Other Notes

None

F. Updated Order of Battle, 10/1/32

Note: X(Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB: 2(0)1 * Mahmudieh building in India
BC: 1(0)0
PD: 2(0)0
AC: 1(0)0
CA: 1(0)0
PC: 2(0)0
CL: 5(0)1
DD: 25(0)0
Torpedo boats: 28(0)0
Sloops: 1(0)0
Frigates: 0(0)0
Moniters:0(0)0
Torpedo gunboats: 2(0)0
Gunboats 8(0)0
Patrol vessels 12(0)4
MTB's: 18(0)0
Mine sweepers 6(0)0
Minelayers 3(0)0
Mine warfare ships 4(0)0
Sub chasers 30(0)6
Motor Launches 39(0)0
Motor Launche/minlayers 10(0)0
Fleet Submarine: 0(0)0
Coastal Submarine:0(0)0
Floatplane carrier/tenders 0(0)0
destroyer depot ships 2(0)0
Submarine depot ships 0(0)0
Auxillary's N/A