You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, November 29th 2006, 1:22am

Denmark, Quarter 4, 1932

Danish Naval Developments Q4 1932

a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts + 0.2 bonus pts
0/11 Factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Slip No.5 (Type 0) at Aalborg extending to type 1, receives 0.2 IP = Total 1.0 IP points, completed
Drydock No.1 (Type 0) at Phuket continues construction, receives 0.2 IP (Danish), 0.1 IP (Italian) and 0.3 IP (Iberian) = Total 0.8 IP points, balance 0.2 pts

c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Eias, CA, laid down 02/08/32, receives 1769 tons, balance 9,395 tons
No.2 type 2 slip – Skalmold, CL, laid down 02/10/32, receives 1164 tons, balance 4548 tons
No.3 type 1 slip – Lancer (e), DD, laid down 02/04/32, receives 440 tons, balance 226 tons
No.4 type 1 slip – Lancer (f), DD, laid down 02/04/32, receives 440 tons, balance 226 tons
No.1 type 3 drydock – Idle
Dock side – Idle

Aarhus-
No.1 type 3 slip – Einmyria, CA, laid down 02/02/32, receives 1,749 tons, balance 5,857 tons
No.2 type 2 slip – Herja, CL, laid down 02/10/32, receives 1165 tons, balance 4548 tons
No.3 type 1 slip – Lancer (g), DDL, laid down 02/04/32, receives 400 tons, balance 226 tons
No.4 type 1 slip – Lancer (h), DDL, laid down 02/04/32, receives 400 tons, balance 226 tons
No.1 type 3 drydock –
No.2 type 2 drydock - Idle
Dock side - Ull, DD, laid down 02/04/32, receives 536 tons, balance 348 tons
Dock side - Herfjötur, CL, laid down 02/07/31, receives 1,053 tons to complete
Dock side – Idle
Dock side - Idle

Aalborg-
No.1 type 1 slip – Artemis, DD, laid down 02/04/32, receives 536 tons, balance 348 tons
No.2 type 1 slip – Idle
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.5 type 0 slip – EXTENDING
No.6 type 0 slip - Idle
Dock side - Idle
Dock side - Idle
Dock side - Idle
Dock side - Idle


Bangkok-
No.1 type 1 slip – Idle
No.2 type 0 slip – Idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side – Idle

Phuket-
No.1 type 0 drydock – BUILDING

d/ Transactions
750 tons from Siam for refitting of KDM Sjaelland prior to transfer to Siamese Navy, Total 3,000 tons

e/ Other Notes

KDM Geirahöd commissions on 13/12/1932
KDM Phlox commissions on 29/10/1932
KDM Cornflower commissions on 29/10/1932
KDM Guldsmed commissions on 18/12/1932
KDM Regnorm commissions on 18/12/1932
KDM Gammelmoso commissions on 10/11/1932
KDM Lyngso commissions on 10/11/1932
KDM c(Lancer) continues sea trials until 13/03/1933
KDM d(Lancer) continues sea trials until 13/03/1933
KDM Hrist continues sea trials until 14/03/1933
KDM Herfjotur commences sea trials on 16/12/1932

Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 856 tons

f/ Order of Battle
Note: X(Y)+Z = In Service (under repair/refit) + building/on order (breaking)

BB = 02 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 2/0 (0)
CL = 18 (1) + 4/0 (3)
CV(X) = 01 (0) + 0/0 (0)
DD = 28 (0) + 6/0 (0)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)

2

Wednesday, November 29th 2006, 10:01am

0.1 IP repaid from Italy after earkier loan.

3

Wednesday, November 29th 2006, 11:20pm

Quoted

Originally posted by Red Admiral
0.1 IP repaid from Italy after earkier loan.


Your honesty does you justice sir!
I had completely forgotten about it.