Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, July 10th 2013, 2:38am

Republic of Italy Q2/42

Italian Naval Construction Summary: 1942 Q2

Patria e Onore


Factories
25 Total factories.
25 Factories dedicated to production of 25,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP.

Material Transactions:
2498t rolled over from Q1/42
2000t acquired from the East African State

29498 tons available for use

Naval Construction Report

Aircraft Carrier Marcantonio Colona receives 3000t while on Orlando Taranto's Class 4 slipway. 18000t of 37911t assembled. 19911t required, launched Q2/42 and estimated completion Q1/44.

Battleship Leonardo da Vinci receives 3000t while on one of CRDA Trieste's Class 4 slipways. 6000t of 45,275t assembled. 39275t required, estimated launch Q4/43 and estimated completion Q4/45.

Armored Cruiser Regina Elena receives 3000t while on one of CRDA Trieste's Class 4 slipways. 6000t of 30000t assembled. 24000t required, estimated launch Q1/43 and estimated completion Q2/44.

Cruiser Genoa receives 1625t added while on one of OTO La Spezia's Class 3 slipways. 3250t of 9750t assembled. 6500t required, estimated launch Q3/42 and estimated completion Q2/43.

Cruiser Milan receives 1625t added while on one of Marghera Fincantieri's Class 3 slipways. 3250t of 9750t assembled. 6500t required, estimated launch Q3/42 and estimated completion Q2/43.

Destroyer Venszia receives 563t added while on OTO La Spezia's Class 1 slipway. 1125t of 2250t assembled. 1125t required, launched Q2/42 and estimated completion Q4/42.

Destroyer Ascaro receives 563t added while on Orlando Taranto's Class 1 slipway. 1125t of 2250t assembled. 1125t required, launched Q2/42 and estimated completion Q4/42.

Destroyer Pontiere receives 563t added while on Napoli di Castellammare's Class 1 slipway. 1125t of 2250t assembled. 1125t required, launched Q2/42 and estimated completion Q4/42.

Destroyer Ardente receives 563t added while in Napoli di Castellammare's Class 1 drydock. 1125t of 2250t assembled. 1125t required, launched Q2/42 and estimated completion Q4/42.

Destroyer Ardito receives 563t added while on Marghera Fincantieri's Class 1 slipway. 1125t of 2250t assembled. 1125t required, launched Q2/42 and estimated completion Q4/42.

Destroyer Animoso receives 563t added while on Messia di Castellammare's Class 1 slipway. 1125t of 2250t assembled. 1125t required, launched Q2/42 and estimated completion Q4/42.

Destroyer Audace receives 563t added while on Massawa's Class 1 slipway. 562t of 2250t assembled. 1125t of 2250t assembled. 1125t required, launched Q2/42 and estimated completion Q4/42.

Submarines U-9 though U-11 receive 1150t in total in Orlando Taranto's Class 4 drydock. 2300t of 3450t assembled. 1150t required, estimated launch and estimated completion Q3/42.

Submarines U-12 though U-14 receive 1150t in total in Messia di Castellammare's Class 4 drydock. 2300t of 3450t assembled. 1150t required, estimated launch and estimated completion Q3/42.

Cruiser Vettor Pisani receives 1475t added while in Napoli di Castellammare's Class 3 drydock. 2950t of 7378t assembled. 4428t required, estimated refloating and estimated completion Q1/43.

Cruiser Sant' Achilleo receives 1332t added while in Orlando Taranto's Class 3 drydock. 2664t of 3996t assembled. 1332t required, estimated refloating and estimated completion Q3/42.

Cruiser San Bacco receives 1332t added while in Messia di Castellammare's Class 3 drydock. 2664t of 3996t assembled. 1332t required, estimated refloating and estimated completion Q3/42.

Scraping Report
2843t available for reuse Q4/42

A Turbine class Destroyer is scraped for 231t in OTO La Spezia's Class 1 drydock.
A Ruggiero class Destroyer is scraped for 409t in one of Orlando Taranto's Class 3 drydocks.
A Turbine class Destroyer is scraped for 231t in Orlando Taranto's Class 1 drydock.
A Darado class destroyer is scraped for 231t in Marghera Fincantieri's Class 1 drydock.
Three Brin class Submarines are scraped for 450t total in Marghera Fincantieri's Class 3 drydock.
A Venszia class Destroyer is scraped for 434.5t in Fincantieri Cagliagi's Class 3 drydock.
A Leonardo da Vinci class submairne is scraped for 150t in Fincantieri Cagliagi's Class 3 drydock.
A Capitan Romani class cruiser is scraped for 435t in Massawa's Class 3 drydock.
A Palestro class Destroyer is scraped for 136t in Massawa's Class 1 drydock.
A Palestro class Destroyer is scraped for 136t in Mogadishu's Class 1 drydock.


Ships on Trials
Aircraft CarrierAndrea Doria

Infrastructure Projects
None

Current Order of Battle Note: Subject to error correction.
BB. 7(0)+1
CV. 11(1)+1
ACR. 9(0)+1
CL. 20(2)+2
DD. 63(0)+7
Submarines. 98(0)+6
Escorts. 122(0)+0
MAS. 70(0)+0

East African State Activities
2000t of naval material produced and sent to Italy

EAS Navy
1(0)+0 Cruisers
2(0)+0 Coastal Defence ships
1(0)+0 Submarine
20(0)+0 MAS

Sumary of Expendatures
22630t out of 25698t used in Naval construction.
0t out of 25698t used in payments.
22630t expended Q2/42.
6868t rollover to Q3/42.
You smug-faced crowds with kindling eye
Who cheer when soldier lads march by,
Sneak home and pray you'll never know
The hell where youth and laughter go.
-Siegfried Sassoon

This post has been edited 2 times, last edit by "snip" (Jul 10th 2013, 3:18am)