Report for Q3/1945
Industrial Allocation
- 33 / 33 factories producing 33,000t materials.
- 0/33 factories producing infrastructure
- 8,644t from stockpile.
- 0t from transactions.
- 0t from scrapping.
- 41,644t materials total.
- 33,511t used.
- 8,133t stored for Q4/45.
Infrastructure Development
None
Naval Construction
Petrograd: Almaz Shipbuilding Company, Sudomekh Shipyard No. 196, Severnaya Verf No.190, and Baltic Shipyard No.189
Class 4 Slip #1 - Idle.
Class 4 Slip #2 - Idle.
Class 4 Slip #3 - Idle.
Class 4 Slip #4 - Idle.
Class 3 Slip #1 -
Elbrus-class tanker
Elbrus laid down January 1st, 1945. 2491 tons required (built to civilian standards). 750 tons added in Q3/1945 for a total of 2250 / 2491 tons. 296 / 2491 tons remaining. Launched July 18th, 1945. Completed October 30th, 1946.
Class 3 Slip #2 -
Elbrus-class tanker
Krestovsky laid down January 1st, 1945. 2491 tons required (built to civilian standards). 750 tons added in Q3/1945 for a total of 2250 / 2491 tons. 296 / 2491 tons remaining. Launched July 18th, 1945. Completed October 30th, 1946.
Class 3 Slip #3 -
Avrora-class (Project 76) light cruiser
Avrora laid down January 1st, 1945. 8,250 tons required. 1,500 tons added Q3/1945 for a total of 4500 / 8250 tons. 3750 / 8250 tons remaining. Launched July 28th, 1945. Completed June 8th, 1946.
Class 3 Slip #4 -
Avrora-class (Project 76) light cruiser
Pallada laid down January 1st, 1945. 8,250 tons required. 1,500 tons added Q3/1945 for a total of 4500 / 8250 tons. 3750 / 8250 tons remaining. Launched July 28th, 1945. Completed June 8th, 1946.
Class 3 Slip #5 -
Kola-class tanker
Taymyr laid down January 1st, 1945. 9505 tons required. 1200 tons added in Q3/1945 for a total of 3600 / 9505 tons. 5905 / 9505 tons remaining. Launched August 13th, 1945. Completed October 16th, 1946.
Class 3 Slip #6 -
Kola-class tanker
Gusinya Zemlya laid down January 1st, 1945. 9505 tons required. 1200 tons added in Q3/1945 for a total of 3600 / 9505 tons. 5905 / 9505 tons remaining. Launched August 13th, 1945. Completed October 16th, 1946.
Class 1 Slip #1 - Idle.
Class 1 Slip #2 - Idle.
Class 1 Slip #3 - Idle.
Class 1 Slip #4 - Idle.
Class 0 Slip #1 - Harbor icebreaker
Nikolay Nekrasov (Project 74) laid down April 1st, 1945. 1496 tons required. 400 tons added in Q3/1945 for a total of 800 / 1496 tons. 696 / 1496 tons remaining. Laid down April 1st, 1945. Launched August 6th, 1945. Completed February 14th, 1946.
Class 0 Slip #2 - Harbor icebreaker
Marina Tsvetaeva (Project 74) laid down April 1st, 1945. 1496 tons required. 400 tons added in Q3/1945 for a total of 800 / 1496 tons. 696 / 1496 tons remaining. Laid down April 1st, 1945. Launched August 6th, 1945. Completed February 14th, 1946.
Class 0 Slip #3 -
Gostinitsa-class (Project 61) patrol boat
#71 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Class 0 Slip #4 -
Gostinitsa-class (Project 61) patrol boat
#72 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Dockside:
- Battlecruiser
Rostislav (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q3/1945 for a total of 36000 / 48000 tons. 12000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Battlecruiser
Potemkin (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q3/1945 for a total of 36000 / 48000 tons. 12000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Battlecruiser
Georgii Pobedonosets (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q3/1945 for a total of 36000 / 48000 tons. 12000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Battlecruiser
Retvizan (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q3/1945 for a total of 36000 / 48000 tons. 12000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Aircraft carrier
Afonskoye (Project 67) laid down January 1st, 1943. 22,791 tons required. 1791 tons added in Q3/1945 for a total of 22791 / 22791 tons. 0 / 22791 tons remaining. Launched June 30th, 1944. Completed September 12th, 1945.
- Sail-training ship
Nadezhda laid down January 1st, 1945. 2000 tons required. 500 tons added Q3/1945 for a total of 1500 / 2000 tons. 500 / 2000 tons remaining. Launched May 12th, 1945. Completed November 30th, 1945.
Kronshtadt: Admiralty Shipyard No.194
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Dockside:
None
Tallinn: Admiralty Shipyard Tallinn
Class 3 Drydock #1 - Idle.
Class 3 Drydock #2 - Idle.
Class 3 Drydock #3 - Idle.
Class 3 Drydock #4 - Idle.
Class 1 Drydock #1 - Idle.
Dockside:
None
Arkhangelsk: Severnoye Mashinostroitelnoye Predpriyatie (Sevmash No.402) and Zvezdochka Shipyard
Class 4.5 Slip #1 - Aircraft Carrier
Reval (Project 65) laid down January 1st, 1944. 49,854 tons required. 2500 tons added in Q3/1945 for a total of 17500 / 49854 tons. 32354 / 49854 tons remaining. Launched December 17th, 1945. Completed November 27th, 1948.
Class 2 Slip #1 - Idle.
Class 2 Slip #2 - Idle.
Class 2 Slip #3 - Idle.
Class 2 Slip #4 - Idle.
Class 2 Slip #5 - Idle.
Class 2 Slip #6 - Idle.
Class 1 Slip #1 - Project 73 "Obsidian" type frigate
SKR-19 laid down July 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 300 / 1050. 750 / 1050 tons remaining until completion. Launched November 1st, 1945. Completed May 2nd, 1946.
Class 1 Slip #2 - Project 73 "Obsidian" type frigate
SKR-20 laid down July 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 300 / 1050. 750 / 1050 tons remaining until completion. Launched November 1st, 1945. Completed May 2nd, 1946.
Class 1 Slip #3 - Project 73 "Obsidian" type frigate
SKR-21 laid down July 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 300 / 1050. 750 / 1050 tons remaining until completion. Launched November 1st, 1945. Completed May 2nd, 1946.
Class 1 Slip #4 - Project 73 "Obsidian" type frigate
SKR-22 laid down July 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 300 / 1050. 750 / 1050 tons remaining until completion. Launched November 1st, 1945. Completed May 2nd, 1946.
Class 0 Slip #1 -
Gostinitsa-class (Project 61) patrol boat
#73 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Class 0 Slip #2 -
Gostinitsa-class (Project 61) patrol boat
#74 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Dockside:
-
Smolensk-class (Project 70) torpedo cruiser
Volgograd laid down July 1st, 1944. 3,475 tons required. 0 tons added Q3/1945 for a total of 3475 / 3475. 0 / 3475 tons remaining until completion. Launched November 30th, 1944. Completed July 15th, 1945.
-
Smolensk-class (Project 70) torpedo cruiser
Pskov laid down July 1st, 1944. 3,475 tons required. 0 tons added Q3/1945 for a total of 3475 / 3475. 0 / 3475 tons remaining until completion. Launched November 30th, 1944. Completed July 15th, 1945.
-
Smolensk-class (Project 70) torpedo cruiser
Odessa laid down July 1st, 1944. 3,475 tons required. 0 tons added Q3/1945 for a total of 3475 / 3475. 0 / 3475 tons remaining until completion. Launched November 30th, 1944. Completed July 15th, 1945.
- Project 73 "Obsidian" type frigate
SKR-13 laid down January 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 900 / 1050. 150 / 1050 tons remaining until completion. Launched May 1st, 1945. Completed November 2nd, 1945.
- Project 73 "Obsidian" type frigate
SKR-14 laid down January 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 900 / 1050. 150 / 1050 tons remaining until completion. Launched May 1st, 1945. Completed November 2nd, 1945.
- Project 73 "Obsidian" type frigate
SKR-15 laid down January 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 900 / 1050. 150 / 1050 tons remaining until completion. Launched May 1st, 1945. Completed November 2nd, 1945.
- Project 73 "Obsidian" type frigate
SKR-16 laid down January 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 900 / 1050. 150 / 1050 tons remaining until completion. Launched May 1st, 1945. Completed November 2nd, 1945.
Murmansk: Shipyard #10 Polyarny, "Shkval"
Class 4.5 Drydock #1 - Idle.
Class 3 Drydock #1 - Idle.
Class 3 Drydock #2 - Idle.
Class 2 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 -
Gostinitsa-class (Project 61) patrol boat
#75 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Class 0 Drydock #2 -
Gostinitsa-class (Project 61) patrol boat
#76 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Dockside:
None
Rostov-on-Don: Black Sea Shipyard, Rostov-on-Don
Class 3 Slip #1 - Idle.
Class 1 Slip #1 - Project 73 "Obsidian" type frigate
SKR-23 laid down July 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 300 / 1050. 750 / 1050 tons remaining until completion. Launched November 1st, 1945. Completed May 2nd, 1946.
Class 1 Slip #2 - Project 73 "Obsidian" type frigate
SKR-24 laid down July 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 300 / 1050. 750 / 1050 tons remaining until completion. Launched November 1st, 1945. Completed May 2nd, 1946.
Class 0 Slip #1 -
Gostinitsa-class (Project 61) patrol boat
#77 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Class 0 Slip #2 -
Gostinitsa-class (Project 61) patrol boat
#78 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Dockside:
- Project 77 Large Antisubmarine Ship (Bol'shoy Protivolodochny Korabl')
Kharkov laid down January 1st, 1945. 2,465 tons required. 700 tons added Q3/1945 for a total of 2100 / 2465. 365 / 2465 tons remaining until completion. Launched May 18th, 1945. Completed December 15th, 1945.
- Project 73 "Obsidian" type frigate
SKR-17 laid down January 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 900 / 1050. 150 / 1050 tons remaining until completion. Launched May 1st, 1945. Completed November 2nd, 1945.
- Project 73 "Obsidian" type frigate
SKR-18 laid down January 1st, 1945. 1,050 tons required. 300 tons added Q3/1945 for a total of 900 / 1050. 150 / 1050 tons remaining until completion. Launched May 1st, 1945. Completed November 2nd, 1945.
Sevastopol: Sevastopol Shipyard No.201, Sevastopol
Class 3 Drydock #1 - Idle.
Class 2 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Dockside:
None
Astrakhan: Admiralty Shipyard No.39, Astrakhan
Class 1 Drydock #1 - Idle.
Dockside:
None
Vladivostok: Dalzavod Yard, Vladivostok, Zvezda Shipyard, Bolshoy Kamen, and Amur Shipbuilding Plant, Komsolosk-on-Amur
Class 4.5 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 1 Drydock #2 - Idle.
Class 0 Drydock #1 - Idle.
Class 4.5 Slip #1 - Aircraft Carrier
Kerch (ex-
Rymnik) (Project 65) laid down January 1st, 1944. 49,854 tons required. 2500 tons added in Q3/1945 for a total of 17500 / 49854 tons. 32354 / 49854 tons remaining. Launched December 17th, 1945. Completed November 27th, 1948.
Class 1 Slip #1 - Idle.
Class 1 Slip #2 - Idle.
Class 0 Slip #1 -
Gostinitsa-class (Project 61) patrol boat
#79 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Class 0 Slip #2 -
Gostinitsa-class (Project 61) patrol boat
#80 laid down July 1st, 1945. 222 tons required. 222 tons added in Q3/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1945. Launched August 20th, 1945. Completed November 7th, 1945.
Dockside:
-
Soobrazitelny-class (Project 69) destroyer
Razumny laid down July 1st, 1944. 1,945 tons required. 445 tons added Q2/1945 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
-
Soobrazitelny-class (Project 69) destroyer
Provorny laid down July 1st, 1944. 1,945 tons required. 445 tons added Q2/1945 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
-
Gostinitsa-class (Project 61) patrol boat
#63 laid down January 1st, 1945. 222 tons required. 0 tons added in Q2/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1945. Launched February 20th, 1945. Completed May 7th, 1945.
-
Gostinitsa-class (Project 61) patrol boat
#64 laid down January 1st, 1945. 222 tons required. 0 tons added in Q2/1945 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1945. Launched February 20th, 1945. Completed May 7th, 1945.
Petropavlovsk-Kamchatsky: Kamchatsky Shipyard No.49 "Gornyak"
Class 3 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Dockside:
None
Cam Ranh Bay (Indochina): Admiralty Shipyard No.191 "Alyans"
Class 4 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 1 Drydock #2 - Idle.
Dockside:
None
From Factories
None
Transactions
None
Scrapping Report
- Total tonnage in recycling until Q4/45: (18x187) = 3366
Notes
Aircraft Carrier
Rymnik, under construction, is renamed
Battle of Kerch.
Order of Battle, September 30th, 1945
Note: X (Y)+Z = completed (under repair/refit) + under construction
The Fleet
Battleships: 18(0)+0
Battlecruisers: 5(0)+4
Coast Defense Battleships: 2(0)+0
Aircraft Carriers: 13(0)+2
Heavy / Armoured Cruisers: 12(0)+0
Escort Cruisers: 4(0)+0
Escort Carriers: 5(0)+0
Light Cruisers: 56(0)+2
Large ASW Ships: 0(0)+1
Destroyers: 129(0)+0
Frigates: 12(0)+12
Sloops: 4(0)+0
Corvettes: 100(0)+0
Fleet Submarines: 40(0)+0
Coastal Submarines: 120(0)+0
Coastal Forces
Patrol Boats: 90(0)+10
Submarine Chasers: 170(0)+0
MTB: 340(0)+0
Experimental Fast Attack Craft: 10(0)+0
Minelayers: 50(0)+0
Minesweepers: 22(0)+0
Light Minesweepers: 30(0)+0
Fleet Services
Seaplane Carriers: 4(0)+0
Repair Ships: 2(0)+0
Fleet Icebreakers: 7(0)+0
Shallow-draft Icebreakers: 2(0)+0
Port Icebreakers: 22(0)+2
Fleet Oilers: 8(0)+2
Ice-Capable Fleet Oilers: 2(0)+2
Light Oilers: 4(0)+0
Destroyer Tenders: 3(0)+0
Corvette/Submarine Tenders: 19(0)+0
Sail Training Ship: 1(0)+1
Amphibious Forces
Amphibious Command Ships: 2(0)+0
Heavy Landing Ship (Caiman): 8(0)+0
Amphibious Transport Ships (Alligator): 12(0)+0
Amphibious Assault Ships (Krokodill): 18(0)+0
Amphibious Assault Boats: 62(0)+0