You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, February 9th 2011, 2:43am

Denmark, Quarter 1, 1940

Danish Naval Developments Q1 1940

a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts
0/11 Factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
None

c/ Naval Construction
Copenhagen-
No.1 type 3 slip –
No.2 type 2 slip – Ue 37, Ue 38, SUB, laid down 01/12/1939, receives 109 tons each to complete
No.3 type 1 slip – Ue 39, Ue 40, SUB, laid down 01/12/1939, receives 109 tons each to complete
No.4 type 1 slip – Ue 41, Ue 42, SUB, laid down 01/12/1939, receives 109 tons each to complete

No.1 type 3 drydock – Idle

Dock side - Idle


Aarhus-
No.1 type 3.5 slip – Aegir, BB, laid down 21/03/1939, receives 2464 tons, balance 29,008 tons
No.2 type 2 slip – Idle
No.3 type 1 slip – Artemisia, SL, laid down 20/01/1940, receives 496 tons, balance 1,283 tons
No.4 type 1 slip – Buxus, SL, laid down 20/01/1940, receives 496 tons, balance 1,283 tons
No.1 type 3.5 drydock – Idle
No.2 type 2 drydock – Idle

Dock side – Thor, BB, laid down 01/07/1939, receives 2464 tons, balance 14,224 tons


Aalborg-
No.1 type 1 slip – Uf 1, SUB, laid down 01/07/1939, receives 229 tons, balance 218 tons
No.2 type 1 slip – Uf 2, SUB, laid down 01/07/1939, receives 229 tons, balance 218 tons
No.3 type 1 slip – Uf 3, SUB, laid down 01/07/1939, receives 229 tons, balance 218 tons
No.4 type 1 slip – Uf 4, SUB, laid down 01/07/1939, receives 229 tons, balance 218 tons
No.5 type 1 slip – Uf 5, SUB, laid down 01/07/1939, receives 229 tons, balance 218 tons
No.6 type 1 slip - Uf 6, SUB, laid down 01/07/1939, receives 229 tons, balance 218 tons

Dock side – Idle


Roskilde-
Wood yard- LTC 1, LTC, laid down 02/01/1940, receives 100 tons to complete
Wood yard- LTC 2, LTC, laid down 02/01/1940, receives 100 tons to complete
Wood yard- LTC 3, LTC, laid down 02/01/1940, receives 100 tons to complete
Wood yard- LTC 4, LTC, laid down 02/01/1940, receives 100 tons to complete

Phuket-
No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle

Berbera-
No.1 type 1 drydock – Idle

St. Thomas-
No.1 type 1 drydock – Idle

Guinea Bisseau-
No.1 type 1 drydock – Idle

d/ Transactions
0.2 IP points to Siam

e/ Other Notes
KDM Xiphos commissions on 01/03/1940
KDM Yatagan commissions on 01/03/1940
KDM Zulfiqar commissions on 01/03/1940
KDM Ue31 commissions on 06/02/1940
KDM Ue32 commissions on 06/02/1940
KDM Ue33 commissions on 06/02/1940
KDM Ue34 commissions on 06/02/1940
KDM Ue35 commissions on 06/02/1940
KDM Ue36 commissions on 06/02/1940
LTC 1 commissions on 30/06/1940
LTC 2 commissions on 30/06/1940
LTC 3 commissions on 30/06/1940
LTC 4 commissions on 30/06/1940
Dannebrog continues sea trials until 02/05/1940

Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 1884 tons

f/ Order of Battle
Note: X (Y) +Z = In Service (under repair/refit) + building/on order (breaking)

BB = 02 (0) + 2/0 (0)
CDS = 04 (0) + 0/0 (0)
CA = 04 (0) + 0/0 (0)
CL = 22 (0) + 0/0 (0)
CV = 02 (0) + 0/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 62 (0) + 0/0 (0)
SL = 16 (0) + 2/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 00 (0) + 0/0 (0)
CGC = 48 (0) + 0/0 (0)
STC = 36 (0) + 0/0 (0)
MTC = 100 (0) + 0/0 (0)
LTC = 04 (0) + 0/0 (0)
SUB = 45 (0) + 12/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
SRV = 03 (0) + 0/0 (0)

Note: FR = Frigate
SL = Sloop
GB = Gun Boat/Escort
CGC = Coast Guard Cutter/Patrol Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
LTC = Large Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)
SRV = Submarine Recovery Vessel