You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, November 20th 2010, 8:39pm

Kingdom of Greece Q1/40

[SIZE=5]Q1 1940[/size]

[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 2,986t from Stockpile
- 4,840t from Transactions
- 17,826t Total materials
- 17,390t used
- 436t stored for Q2/1940

[size=3]Infrastructure Development[/size]
Souda Bay:
- 0.5 IP (dedicated) added to Type 2 drydock at Souda Bay. 2.5 IP remaining.

[SIZE=3]Naval Construction[/SIZE]

Attica:
D3: Idle
D3: Idle
D2: Idle
S2: Idle
S2: Idle
S1: - D-98 Lefkada laid down January 2nd, 1940. 2,175 tons required; 584 / 2175t added Q1/40 for total 584 / 2175. 1,591 tons remaining.
S1: - D-99 Ithaki laid down January 5th, 1940. 2,175 tons required; 584 / 2175t added Q1/40 for total 584 / 2175. 1,591 tons remaining.
S0: Idle
S0: Idle

Dockside:
- B-6 Lysandros laid down January 1st, 1936. 37,000 tons required; 2868 / 37000 tons added Q1/40 for total 36518 / 37000. 482 tons remaining until completion. Launched.
- B-7 Perikles laid down January 1st, 1936. 37,000 tons required; 2868 / 37000 tons added Q1/40 for total 36518 / 37000. 482 tons remaining until completion. Launched.
- Banat, Romanian Cruiser laid down July 1st, 1939. 5,988 tons required; 1200 / 5988 added Q1/40 for total 3600 / 5988. 2,388 tons remaining until completion. Launched.
- Srbija, Yugoslavian Cruiser laid down October 1st, 1939. 4,549 tons required; 1820 / 4549 added Q1/40 for total 3640 / 4549. 909 tons remaining until completion. Launched.
- D-95 Eptanisa laid down July 1st, 1939. 2,175 tons required; 584 / 2175t added Q1/40 for total 1752 / 2175. 423 tons remaining until completion. Launched.
- D-96 Kerkyra laid down July 1st, 1939. 2,175 tons required; 584 / 2175t added Q1/40 for total 1752 / 2175. 423 tons remaining until completion. Launched.

Paros:
D1: Idle
D0: Idle

Dockside:

Patra:
D1: Idle
S1: - D-100 Kefalonia laid down January 3rd, 1940. 2,175 tons required; 584 / 2175t added Q1/40 for total 584 / 2175. 1,591 tons remaining until completion.
D0: Idle

Dockside:
- D-97 Paxi laid down July 1st, 1939. 2,175 tons required; 584 / 2175t added Q1/40 for total 1752 / 2175. 423 tons remaining until completion. Launched.

Salamis:
D1: Idle

Dockside:

Souda Bay:
D4: Idle
S2: - M-7 Kos laid down January 4th, 1940. 2,743 tons required; 700 / 2743 added Q1/40 for total of 700 / 2743. 2,043 tons remaining until completion.
D2: Under construction
D1: Idle
D1: Idle
D1: Idle

Dockside:
- Crna Gora, Yugoslavian Cruiser laid down October 1st, 1939. 4,549 tons required; 1820 / 4549 added Q1/40 for total 3640 / 4549. 909t remaining until completion. Launched.

Thessaloniki:
D0: Idle
S0: Idle
S0: Idle

Volos:
D1: Idle

Dockside:

Limassol:
D3: Idle
D1: Idle

From factories:
- GB-33, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-34, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-35, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-36, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-37, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-38, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- CMSW-33, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-34, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-35, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-36, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-37, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-38, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.

On Trails:
- C-36 Gaugamela laid down January 1st, 1938. Completed January 20th, 1940. Begins trails January 23rd, 1940. Completes trails July 30th, 1940.

[size=3]Transactions[/size]
Recieved 1,200t from Romania for cruiser contruction
Recieved 3,640 tons from Yugoslavia for cruiser construction
Sent 720 tons to Great Britain for Rhodos class fast minelayer construction

[size=3]Other Notes[/size]
Purchase from Great Britain also includes the buiders plans for the Rhodos Class, allowing sister ships to be built domestically.

[size=3]Order of Battle (Greek Navy) end of Q4 1939[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Fleet Combatants
Battleships 3(0)+2
Large Cruisers 4(0)+0
Carriers 6(0)+0
Training Carrier 1(0)+0
Heavy Cruisers 2(0)+0
Light Cruisers 14(0)+0
Escort Cruisers 6(0)+0
Flotilla Leaders 4(0)+0
Destroyers 59(0)+6
Submarines 46(0)+0
Torpedo Boats 10(0)+0

Small Combatants
Large Gunboats 14(0)+0)
Small Gunboats/Subchasers 38(0)+0
Minelayers 5(0)+1 (Plus 1 under construction in Great Britain)
Minesweepers 40(0)+0
Coastal Minesweepers 38(0)+0
Harbour Launches 3(0)+0
Other Small Combatants 145(0)+0

Auxiliaries
Special transports 5(0)+0
Landing Craft 32(0)+0
Training Ships 4(0)+0
Tenders 4(0)+0
Fleet Train 11(0)+0

This post has been edited 2 times, last edit by "Sachmle" (Nov 20th 2010, 9:02pm)