You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, January 20th 2014, 3:13pm

German Naval Construction Programme, Fourth Quarter, 1944

German Naval Construction Programme, Fourth Quarter, 1944

A. Factories

Factories: 31
Available: 31
Producing Warship Material: 25
Tonnage Produced: 25,000
Producing Infrastructure (Committed): 6
Producing Infrastructure (Non - Committed):
Infrastructure Points Produced: 0.6
Bonus IP for Committed Factories: 0.6
Total IP Available: 1.2

Tonnage Produced: 25,000
Tonnage Transferred In:
Tonnage Received in Payment: 0
Tonnage Reclaimed From Scrap: 160
Tonnage Previously Stockpiled: 1,988
Total Tonnage Available: 27,148
Tonnage Transferred Out:
Tonnage Paid:
Tonnage Used in Construction: 25,406
Tonnage Remaining for Stockpile: 1,742


B. Infrastructure Development

Infrastructure Project -:- IP Req -:- IP Added -:- IP To Date -:- IP Remain
Flensburg Type 1.0 Floating Drydock FD1 -:- 1.00 -:- 0.40 -:- 1.00 -:- 0.00 - Completed
Flensburg Type 1.0 Building Slip S1 -:- 1.00 -:- 0.40 -:- 1.00 -:- 0.00 - Completed
Flensburg Type 1.0 Building Slip S2 -:- 1.00 -:- 0.40 -:- 1.00 -:- 0.00 - Completed


C. Naval Development and Construction

Bremerhaven

Dock Nr.1 - Type 3.0 – Scrapping of submarines U-13, U-14 and U-15; Demolition commences 1 October 1944, enter dock 25 October 1944, demolition complete 10 November 1944

Slip Nr.1 - Type 3.0 – Aircraft carrier Karl der Große laid down 20 January 1944; Requires 18,764 tons; 6,030 tons previously consumed; receives 2,010 tons; 10,724 tons remaining

Slip Nr.2 – Type 1.0 – Idle

Slip Nr.3 – Type 1.0 – Idle

Pierside:

Aircraft carrier Großer Kurfürst - Launched 1 December 1943; Requires 18,764 tons; 14,070 tons previously consumed; receives 2,010 tons; 2,684 tons remaining

Corvette Nerz: Launched 1 July 1944: Requires 1,000 tons, 810 tons previously consumed; receives 190 tons, 0 tons remaining; Completed 26 December 1944 and commences trials

Corvette Ozelot: Launched 1 July 1944: Requires 1,000 tons, 810 tons previously consumed; receives 190 tons, 0 tons remaining; Completed 26 December 1944 and commences trials

Cuxhaven

Dock Nr.1 - Type 4.0 – Scrapping of submarines U-16, U-17, U-18 and U-19; Demolition commences 1 October 1944, enter dock 25 October 1944, demolition complete 10 November 1944


Dock Nr.2 - Type 2.0 – Frigate Rangersdorf: Laid down 1 July 1944: Requires 1,950 tons, 500 tons previously consumed; receives 500 tons, 950 tons remaining; Launched 31 October 1944

Slip Nr.1 – Type 4.0 – Aircraft carrier Friedrich Barbarossa - laid down 20 January 1944; Requires 18,764 tons; 6,030 tons previously consumed; receives 2,010 tons; 10,724 tons remaining

Slip Nr.2 – Type 2.0 – Idle

Slip Nr.3 – Type 1.0 – Idle

Slip Nr.4 – Type 1.0 – Idle

Pierside:

Aircraft carrier Friedrich der Große - Launched 1 December 1943; Requires 18,764 tons; 14,070 tons previously consumed; receives 2,010 tons; 2,684 tons remaining

Frigate Ravelsbach: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Frigate Werden: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Corvette Puma: Launched 1 July 1944: Requires 1,000 tons, 810 tons previously consumed; receives 190 tons, 0 tons remaining; Completed 26 December 1944 and commences trials

Corvette Wiesel: Launched 1 July 1944: Requires 1,000 tons, 810 tons previously consumed; receives 190 tons, 0 tons remaining; Completed 26 December 1944 and commences trials

Hamburg

Slip Nr.1 – Type 2.0 – Idle

Slip Nr.2 – Type 2.0 – Idle

Slip Nr.3 – Type 1.0 – Minesweeper Hallstättersee: Laid down 28 July 1944; Requires 612 tons, 180 tons previously consumed; receives 180 tons, 252tons remaining; Launched 21 November 1944

Slip Nr.4 – Type 1.0 – Minesweeper Wörthersee: Laid down 28 July 1944; Requires 612 tons, 180 tons previously consumed; receives 180 tons, 252tons remaining; Launched 21 November 1944


Pierside

Frigate Fürstenfeld: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Frigate Saalfelden: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Minesweeper Fuschlsee: Launched 13 July 1944; Requires 612 tons, 540 tons previously consumed; receives 72 tons, 0 tons remaining

Minesweeper Wolfgangsee: Launched 13 July 1944; Requires 612 tons, 540 tons previously consumed; receives 72 tons, 0 tons remaining


Kiel

Dock Nr.1 – Type 4.0 – Frigate Großpetersdorf and Frigate Sulzbach laid down end for end 1 July 1944; each requires 1,950 tons, 500 tons previously consumed; each receives 500 tons, each has 950 tons remaining; Launched 31 October 1944

Dock Nr.2 – Type 2.5 – Idle

Dock Nr.3 – Type 2.0 – Frigate Gromitz: Laid down 1 July 1944: Requires 1,950 tons, 500 tons previously consumed; receives 500 tons, 950 tons remaining; Launched 31 October 1944

Dock Nr.4 – Type 0.0 – Idle

Slip Nr.1 – Type 4.0 – Idle

Slip Nr.2 - Type 3.0 – Light Cruiser Stuttgart laid down 1 July 1944; requires 10,500 tons, 1,510 tons previously consumed; receives 1,510 tons, 7,350 tons remaining

Slip Nr.3 – Type 1.0 – Idle

Slip Nr.4 – Type 1.0 – Idle

Slip Nr.5 – Type 1.0 – Idle


Pierside

Light Cruiser Dresden – Launched 7 September 1944; requires 10,500 tons, 3,020 tons previously consumed; receives 4,510 tons, 6,020 tons remaining

Frigate Datteln: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Frigate Graz: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Frigate Klagenfurt: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Frigate Dillingen: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Frigate Rottweil: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Frigate Salzburg: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Wilhelmshaven

Dock Nr.1 - Type 3.0 – Scrapping of submarines U-20, U-21 and U-22; Demolition commences 1 October 1944, enter dock 25 October 1944, demolition complete 10 November 1944

Dock Nr.2 – Type 0.0 – Idle

Slip Nr.1 – Type 1.0 – Idle

Slip Nr.2 – Type 0.5 – Idle

Slip Nr.3 – Type 0.5 – Idle


Pierside:

Frigate Kapfenberg: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials

Offshore Patrol Vessel Roter Löwe; Launched 15 May 1944: Requires 2,000 tons, 1,500 tons previously consumed; receives 500 tons, 0 tons remaining; Completed 1 December 1944 and commences trials

Offshore Patrol Vessel Goldener Löwe; Launched 15 May 1944: Requires 2,000 tons, 1,500 tons previously consumed; receives 500 tons, 0 tons remaining; Completed 1 December 1944 and commences trials


Vienna:

Dock Nr.1 – Type 0.0 – Idle

Slip Nr.1 – Type 0.0 – Idle


Memel:

Dock Nr.1 – Type 1.0 – Idle

Slip Nr.1 – Type 1.0 – Idle

Slip Nr.2 – Type 0.0 – Idle

Slip Nr.3 – Type 0.0 – Idle


Pierside:

Frigate Frankenthal: Launched 2 May 1944; Requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 23 November 1944 and commences trials


Small Craft Construction Programme

Craft: Quantity -- Light Tonnage -- Tonnage Expended
Sturm Landungsboot 40: Six -- 20 -- 120
Pionier Landungsboot 40: Six -- 62 -- 372


Refits and Conversion Programme

Refit of Heavy Cruiser Prinz Eugen: Commences 1 October 1944; Requires 649 tons, 0 tons previously consumed; 649 tons provided, 0 tons remaining. Refit complete 5 November 1944 and commences trials; Post refit trials complete 14 November

Conversion of Fleet Oiler Jeverland: Commences 1 July 1944: Requires 1,548 tons; 744 tons previously consumed; 774 tons provided; 0 tons remaining; Conversion complete 23 October 1944 and commences trials; Post conversion trials complete 7 December 1944

Conversion of Fleet Oiler Wendland: Commences 1 July 1944: Requires 1,548 tons; 744 tons previously consumed; 774 tons provided; 0 tons remaining; Conversion complete 23 October 1944 and commences trials; Post conversion trials complete 7 December 1944

Conversion of Fleet Tender Lothar von Trotha: Commences 1 July 1944: Requires 1,715 tons; 858 tons previously consumed; 857 tons provided; 0 tons remaining; Conversion complete 29 October 1944 and commences trials; Post conversion trials complete 13 December 1944

Conversion of Support Tanker Eider: Commences 1 July 1944: Requires 1,136 tons; 568 tons previously consumed; 568 tons provided; 0 tons remaining; Conversion complete 11 October 1944 and commences trials; Post conversion trials complete 25 November 1944

Conversion of Support Tanker Trave: Commences 1 July 1944: Requires 1,136 tons; 568 tons previously consumed; 568 tons provided; 0 tons remaining; Conversion complete 11 October 1944 and commences trials; Post conversion trials complete 25 November 1944


D. Transactions

None


E. Other Notes

Ships Laid Down This Quarter

None


Ships Launched This Quarter

At Bremerhaven: Aircraft Carrier Karl der Große
At Cuxhaven: Aircraft Carrier Friedrich Barbarossa, Frigate Rangersdorf
At Hamburg: Minesweeper Hallstättersee and Wörthersee
At Kiel: Frigates Gromitz, Frigate Großpetersdorf and Sulzbach


Ships Completed This Quarter

At Bremerhaven: Corvettes Nerz and Ozelot
At Cuxhaven: Frigates Ravelsbach and Werden, Corvettes Puma and Wiesel
At Hamburg: Frigates Fürstenfeld and Saalfelden
At Kiel: Frigates Datteln, Dillingen, Graz, Klagenfurt, Rottweil and Salzburg
At Wilhelmshaven: Frigate Kapfenberg, Offshore Patrol Vessels Roter Löwe and Goldener Löwe
At Memel: Frigate Frankenthal


Refits/Conversions Completed This Quarter

Heavy cruiser Prinz Eugen
Fleet Oiler Jeverland
Fleet Oiler Wendland
Fleet tender Lothar von Trotha
Support Tanker Eider
Support Tanker Trave


Ships Undergoing Trials This Quarter

(first three-months)

Frigate Klagenfurt
Frigate Dillingen
Frigate Rottweil
Frigate Frankenthal
Frigate Datteln
Frigate Graz
Frigate Salzburg
Frigate Ravelsbach
Frigate Fürstenfeld
Frigate Saalfelden
Frigate Werden
Frigate Kapfenberg
Corvette Nerz
Corvette Ozelot
Corvette Puma
Corvette Wiesel
Offshore Patrol Vessel Roter Löwe
Offshore Patrol Vessel Goldener Löwe

(second three months)

Corvette Dachs
Corvette Frettchen
Corvette Gepard
Corvette Hyäne
Minesweeper Eissee
Minesweeper Traunsee


Ships Completing Trials This Quarter

Minesweeper Attersee
Minesweeper Mondsee
Dock Landing Ship Wittelsbach
Dock Landing Ship Wettin
Fleet Salvage Tug Mücke
Fleet Salvage Tug Wespe
Heavy cruiser Prinz Eugen (post refit)
Fleet Oiler Jeverland (post refit)
Fleet Oiler Wendland (post refit)
Fleet tender Lothar von Trotha (post refit)
Support Tanker Eider (post refit)
Support Tanker Trave (post refit)


F. Scrappage Report

Bremerhaven: U-13, U-14 and U-15: completed 10 November 1944; 62 tons per boat recovered and available in 3Q45
Cuxhaven: U-16, U-17, U-18 and U-19: completed 10 November 1944; 62 tons per boat recovered and available in 3Q45
Wilhelmshaven: U-20, U-21 and U-22: completed 10 November 1944; 62 tons per boat recovered and available in 3Q45


G. Other Disposals

Submarines U-23 and U-24 expended as targets in training exercises


Updated Order of Battle

Type : In Service + Trials + Building + Converting + Refitting = Total
Schlachtschiff : 8 + 0 + 0 + 0 + 0 = 8
Schlachtkreuzer : 4 + 0 + 0 + 0 + 0 = 4
Flugzeugträger : 7 + 0 + 4 + 0 + 0 = 11
Schwere Kreuzer : 4 + 0 + 0 + 0 + 0 = 4
Leichte Kreuzer : 16 + 0 + 2 + 0 + 0 = 18
Schwere Zerstörer : 18 + 0 + 0 + 0 + 0 = 18
Zerstörer : 72 + 0 + 0 + 0 + 0 = 72
Fregatten : 0 + 14 + 4 + 0 + 0 = 18
Korvette : 20 + 4 + 0 + 0 + 0 = 24
Geleitboote : 8 + 0 + 0 + 0 + 0 = 8
Underseeboote : 46 + 0 + 0 + 0 + 0 = 46
Leichte Minenschiffe : 12 + 0 + 0 + 0 + 0 = 12
Minenschiffe : 50 + 2 + 4 + 0 + 0 = 56
Mehrzweckboot : 4 + 0 + 0 + 0 + 0 = 4
Schnelleboote : 50 + 0 + 0 + 0 + 0 = 50
Flusskanonenboote : 2 + 0 + 0 + 0 + 0 = 2
Fluss-Patrouillenboote : 6 + 0 + 0 + 0 + 0 = 6
Schnellboot-Begleitschiffe : 4 + 0 + 0 + 0 + 0 = 4
U-boot-Begleitschiffe : 4 + 0 + 0 + 0 + 0 = 4
Flotten-Begleitschiffe : 4 + 0 + 0 + 0 + 0 = 4
Einsatzgruppenversorgungsschiff : 6 + 0 + 0 + 0 + 0 = 6
Flottentanker : 18 + 0 + 0 + 0 + 0 = 18
Flottenversorgungsschiff : 4 + 0 + 0 + 0 + 0 = 4
Werkstattschiffe : 2 + 0 + 0 + 0 + 0 = 2
Flottenversorger (P) : 2 + 0 + 0 + 0 + 0 = 2
Munitionstransportschiff : 2 + 0 + 0 + 0 + 0 = 2
Versorgnungstransportschiff : 2 + 0 + 0 + 0 + 0 = 2
Minentransporter : 1 + 0 + 0 + 0 + 0 = 1
Begleit- und Werkstattschiff : 2 + 0 + 0 + 0 + 0 = 2
Reparaturschiff : 2 + 0 + 0 + 0 + 0 = 2
Vermessungsschiff : 2 + 0 + 0 + 0 + 0 = 2
Eisbrecher : 2 + 0 + 0 + 0 + 0 = 2
Netzleger : 8 + 0 + 0 + 0 + 0 = 8
Hochseeschlepper : 4 + 0 + 0 + 0 + 0 = 4
Bergungsschlepper : 4 + 0 + 0 + 0 + 0 = 4
Hafenschlepper : 4 + 0 + 0 + 0 + 0 = 4
Amphibische Transportschiffe : 10 + 0 + 0 + 0 + 0 = 10
Landungstransportschiff : 8 + 0 + 0 + 0 + 0 = 8
Sturm Landungsboot : 148 + 0 + 0 + 0 + 0 = 148
Pionier Landungsboot : 46 + 0 + 0 + 0 + 0 = 46
Marine Fahrprahm Typ 1941 : 8 + 0 + 0 + 0 + 0 = 8
Hafensucheboote Typ 1941 : 24 + 0 + 0 + 0 + 0 = 24
Pionier Motor Launch Typ 1941 : 20 + 0 + 0 + 0 + 0 = 20
Flieger-schuleschiffe : 1 + 0 + 0 + 0 + 0 = 1
Artillerie-schuleschiffe : 2 + 0 + 0 + 0 + 0 = 2
Segel-schuleschiffe : 2 + 0 + 0 + 0 + 0 = 2
Zielschiffe : 1 + 0 + 0 + 0 + 0 = 1
Hafen-schuleschiffe : 1 + 0 + 0 + 0 + 0 = 1