You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Tuesday, May 3rd 2005, 12:12pm

Quarterly Report #26 for the SAE

[SIZE=3]SAE Quarterly Reports [/SIZE]
No. 26 – April to June 1927


[SIZE=3]Transfers: [/SIZE]

0,2 pts from Turkey.


Factories:

26 factories total can be used.

Fixed factories

1 factory will be fixed to produce infrastructure points for 1927.

Flexible factories

378ts material transferred from Q1 (incl. material recovered from scrapyard).

24,397ts material necessary to be produced in this quarter (25 factories).

1 factory producing 0,1pts for infrastructure.


Infrastructure points used this quarter:

0,3pts put into a new Type 1 Dock in Victoria for a total of 0,3pts at the end of Q2.


[SIZE=3]Ships: [/SIZE]

Minor vessels

Completed Units

12x UJ26-class ASW launch

13x Flower-class minesweeper
15x Tree-class minesweeper
12x Bush-class minesweeper

2x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops

8x River-class frigate

8x Pleiades-class light destroyers

6x Guard-class patrol crafts

4x Mimir-class floatplane carriers

On Trials

2x Bush-class minesweeper
- Juniper running trials until April 27
- Clematis running trials until June 27

Ordered Units

3x River-class frigate (10 month á 60ts material necessary per unit)
- Rio Santa Lucia laid down in Buenos Aires on a Type 1 slip in March 27, completed December 27
- Rio Negro laid down in Montevideo on a Type 1 slip in May, completed February 28
- Arroyo de la India Muerta laid down in Mar del Plata on a Type 1 slip in May 27, completed February 28

2x Bush-class minesweeper (10 month á 53ts material necessary per unit)
- Privet laid down in Buenos Aires on a Type 1 slip in January, completed October 27
- Haw laid down in St. Helena on a Type 0 slip in April, completed Jannuary 28

Refits

None

Scrapping

5x SL09-class (4 month total, 2 month in Type 0 dock)
- Jupiter scrapping in Cape Town starting in June, finished in September – 99ts received from hull for Q2/1927
- Mars scrapping in Durban starting in August, finished in September – 99ts received from hull for Q3/1927
- Venus scrapping in Durban starting in July, finished in September – 99ts received from hull for Q3/1927
- Mercury scrapping in Durban starting in September, finished in September – 99ts received from hull for Q3/1927
- Saturn scrapping in Cape Town starting in November, finished in February – 99ts received from hull for Q4/1927

2x MS12-class (4 month total, 1 month in Type 0 dock)
- Physalis scrapping in Mar del Plata starting in June, finished in September – 63ts received from hull for Q2/1928
- Lily scrapping in St. Helena starting in April, finished in July – 63ts received from hull for Q2/1928


Destroyers

Completed Units

2x Bird-class torpedoboat
8x Cat-class torpedoboat
12x Hound-class torpedoboat

12x Nymph-class destroyer (Type 21)
10x Nymph-class destroyer (Type 23)

On Trials

2x TB16-class torpedo boats
- Jaguar running trials until August 27
- Puma running trials until October 27

2x Nymph-class destroyer
- Halimene running trials until June 27
- Hippothoe running trials until June 27

6x Hound-class torpedo boats
- Beagle running trials until June 27
- Beauceron running trials until May 27
- Berger Picard running trials until May 27
- Border Collie running trials until May 27
- Saint Bernard running trials until July 27
- Bobtail running trials until September 27

Ordered Units

6x Hound-class torpedo boat (Type 26 - 11 month á 126ts material necessary per unit)
- Boxer laid down in Durban on a Type 1 slip in March, completed in January 28
- Bouvier laid down in Durban on a Type 1 slip in March, completed in January 28
- Bullterrier laid down in Port Elizabeth on a Type 1 slip in March, completed in January 28
- Dalmatian laid down in Majunga on a Type 1 slip in February, completed in December 27
- Deerhound laid down in Port Louis on a Type 1 slip in February, completed in December 27
- Briard laid down in Cape Town on a Type 1 slip in June, completed in April 28

5x Nymph-class destroyer (Type 27 - 11 month á 147ts material necessary per unit)
- Kymatolege laid down in Daressalam on a Type 1 slip in January, completed in November 27
- Kymo laid down in Douala on a Type 1 slip in January, completed in November 27
- Kymodoke laid down in Buenos Aires on a Type 2 slip in January, completed in November 27
- Kymothoe laid down in Mar del Plata on a Type 2 slip in March, completed in January 28
- Laodameia laid down in Port Elizabeth on a Type 2 slip in May, completed in March 28

Rebuilds

2x TB16-class torpedo boat (6 month á 128ts material necessary per unit)
- Karakal entering a Type 1 dock in Montevideo in December. Leaving the dock in January, the torpedo boat will stay in the yard until May 27
- Cheetah entering a Type 1 dock in Douala in March. Leaving the dock in April, the torpedo boat will stay in the yard until August 27

Scrapping

None


Class B Cruisers

Completed Units

11x Insect-class torpedoboat
4x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
2x Aurora-class light cruiser

On Trials

None

Ordered Units

2x CL24-class light cruiser (17 month á 465ts material necessary per unit)
- Carmenta laid down in Durban on a Type 2 slip in July 26, completed in November 27
- Dira laid down in Daressalam on a Type 2 slip in July 26, completed in November 27

2x CL27-class light cruiser (15 month á 384ts material necessary per unit)
- Arion laid down in Durban on a Type 3 slip in January, completed in March 28
- Sleipnir laid down in Cape Town on a Type 3 slip in February, completed in April 28

Rebuilds

1x CL13-class light cruiser (14 month á 145ts/month material necessary per unit)
- Port Shepstone entering a Type 4 dock in Durban in April. Leaving the dock in September 27, the battleship will stay in the yard until May 28

Scrapping

1x CL10-class (5 month total, 2 month in Type 2 dock)
- Douala scrapping in Daressalam starting in July 26, finished in November 26 – 574ts received from hull for Q3/1927, guns of first and second battery stored


Class A Cruisers

Completed Units

1x Colony-class AC
2x General-class AC
4x Cape-class heavy cruiser

On Trials

None

Ordered Units

2x CA26-class heavy cruiser (19 month á 526ts material necessary per unit)
- Cape Infante laid down in Cape Town on a Type 3 slip in January 26, completed in July 27
- Cape Agulhas laid down in Buenos Aires on a Type 3 slip in January, completed in July 28


Capital Units

Completed Units

2x Sao Tome-class
2x Hertog-class
3x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class

On Trials

None

Ordered Units

2x BB24G-class (37 month á 808ts/month material necessary per unit)
- Ophion laid down on a Type 4 slip in Montevideo in January 24, completed in November 1927
- Hyperion laid down on a Type 4 slip in Durban in April 25, completed in February 29

Rebuilds

1x Koning-class battleship (22 month á 576ts/month material necessary per unit)
- Koning Frederik entering a Type 3 dock in Durban in January. Leaving the dock in September 27, the battleship will stay in the yard until October 28

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class

On Trials

1x LCDS-class
- Alswinn running trials until July 27

Ordered Units

1x LCDS-class LCDS (11 month á 171ts material necessary per unit)
- Arwakr laid down in Cape Town on a Type 1 slip in March, completed in April 27


Carriers

Completed Units

1x Wim Kraash-class (converted freighter, rated as experimental, to be replaced by CV25B)

Ordered Units

1x CV25B-class fleet carrier (29 month á 690ts material necessary per unit)
- Hammer laid down in Durban on a Type 4 slip in January, completed in May 27

1x CV26-class fleet carrier (29 month á 690ts material necessary per unit)
- Forge laid down in Montevideo on a Type 4 slip in March, completed in July 28


Class A Submarines

Completed Units

12x E-class submarine
16x F-class submarine
4x J-class submarine

Ordered Units

None


Class B Submarines

Completed Units

14x G-class submarine
15x I-class submarine
12x H-class submarine
2x K-class submarine

On Trials

3x K-class submarine
- K3 running trials until April 27
- K4 running trials until April 27
- K5 running trials until October 27

Ordered Units

3x K-class submarine (10 month á 46ts material necessary per unit)
- K6 laid down on Prince Eduard Islands on a Type 0 slip in October, completed in July 27
- K9 laid down in Cape Town on a Type 0 slip in March, completed in December 27
- K7 laid down in Douala on a Type 0 slip in April, completed in January 28


Non-combatants

Completed Units

15x Bay-class tender (several different designs)

On Trials

1x TD25-class tender
- Lambert´s Bay running trials until June 27

Ordered Units

None.

------------------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

12 ASW launches
40 minesweepers
59 small patrol crafts
44 TB/DDs (does not include 11 TBs with 15cm guns)
41 cruisers category b (does include 11 TBs with 15cm guns)
7 cruisers category a
13 capital units
1 experimental carrier (conversion)
43 submarines category b
32 submarines category a
4 floatplane carriers
15 armed tenders

plus numerous auxiliary vessels of all kind.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

2

Tuesday, May 3rd 2005, 1:56pm

I forgot to post stats for the two classes undergoing a rebuild [detailed information can be found in the encyclopedia].

Port Shepstone , laid down 1913, rebuild 1927

Changes include:

- new main armament arrangement with twin shields
- new AAA suit
- new TT equipement
- new superstructure excluding classical CT
- new machinery including all-oil firing and HP-turbines

Displacement:
4.348 t light; 4.537 t standard

Dimensions: Length overall / water x beam x draught
451,51 ft / 442,91 ft x 44,29 ft x 19,03 ft (normal load)
137,62 m / 135,00 m x 13,50 m x 5,80 m

Armament:
8 - 5,91" / 150 mm guns (4x2 guns)
4 - 4,13" / 105 mm guns in single mounts
6 - 21,0" / 533 mm above water torpedoes

Machinery:
Oil fired boilers, steam turbines,
Geared drive, 2 shafts, 48.000 Kw
Range 7.000nm at 15,00 kts

Complement:
303 - 395

Cost:
£0,589 million / $2,355 million


Koning Frederik II , laid down 1912, rebuild 1927

Changes include:

- new bow
- new AAA suit
- strengthened deck and torpedo bulkhead
- new superstructure excluding classical CT
- new machinery including all-oil firing and HP-turbines
- 50ts misc weight

Displacement:
25.326 t light; 26.654 t standard

Dimensions: Length overall / water x beam x draught
646,62 ft / 639,76 ft x 93,50 ft x 27,89 ft (normal load)
197,09 m / 195,00 m x 28,50 m x 8,50 m

Armament:
10 - 13,78" / 350 mm guns (5x2 guns)
12 - 5,91" / 150 mm guns in single mounts
12 - 4,13" / 105 mm guns (6x2 guns) anti-aircraft guns in deck mounts

Machinery:
Oil fired boilers, steam turbines,
Geared drive, 4 shafts, 60.000 Kw
Range 7.600nm at 15,00 kts

Complement:
1.099 - 1.429

Cost:
£2,794 million / $11,174 million